Keegan Contruction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Aug 2001 to Aug 2026
- Last 24 months
- 17 permits filed
292 permits since 2000: 254 completed, 4 in progress, 9 never finaled, 25 expired or cancelled.
Of the 9 never-finaled permits, 2 are 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 292.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 11, 2026 | In progress issued Aug 2026 | 218 Castenada Av | remodel (e) bathroom in kind . remove finishes. replace fixtures and fittings and new tile on walls and floors (e) ceiling to remain in place. (e) led to remain as isDetails
remodel (e) bathroom in kind . remove finishes. replace fixtures and fittings and new tile on walls and floors (e) ceiling to remain in place. (e) led to remain as is | $20,000 |
| Jul 23, 2026 | In progress issued Jul 2026 | 737 Arguello Bl | laundry room remodel: replace cabinets and shelving, remove sheetrcok, upgrade electrical, and reinstall sheetrock, remove existing washer and dryer and install new stacked washer and dryer, new floor tiles.Details
laundry room remodel: replace cabinets and shelving, remove sheetrcok, upgrade electrical, and reinstall sheetrock, remove existing washer and dryer and install new stacked washer and dryer, new floor tiles. | $15,000 |
| Dec 11, 2025 | Completed final sign-off Aug 2026 | 338 28th St | replace 8 windows on the front of bldg, street facing, replace stucco as necessary to replace windows and repair dry rot.Details
replace 8 windows on the front of bldg, street facing, replace stucco as necessary to replace windows and repair dry rot. | $25,000 |
| Dec 11, 2025 | Completed final sign-off Aug 2026 | 338 28th St | unit 2: removal of east lightwell to create 2nd bathroom. removal of interior wall b/t kitchen and living room. replacement of 2 windows at rear with in-swing french door. related electrical and plumbing. proposed infill will only obsure 36" vertical of adjacent lightwell. 45 sf added area.Details
unit 2: removal of east lightwell to create 2nd bathroom. removal of interior wall b/t kitchen and living room. replacement of 2 windows at rear with in-swing french door. related electrical and plumbing. proposed infill will only obsure 36" vertical of adjacent lightwell. 45 sf added area. | $38,000 |
| Dec 2, 2025 | Completed final sign-off Feb 2026 | 67 Capistrano Av | replace termite damaged siding 1x8 redwood siding with new hardi siding. non street visible. existing doors and windows to remain.Details
replace termite damaged siding 1x8 redwood siding with new hardi siding. non street visible. existing doors and windows to remain. | $30,000 |
| Sep 17, 2025 | Completed final sign-off Aug 2026 | 338 28th St | unit 2: remodel kitchen and bathroom. like for like. replace knob and tube wiring. remove plaster insulate and update electrical, intsall dry wall.Details
unit 2: remodel kitchen and bathroom. like for like. replace knob and tube wiring. remove plaster insulate and update electrical, intsall dry wall. | $100,000 |
| Jul 8, 2025 | Completed final sign-off Jul 2026 | 62 Miramar Av | in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $10,561 |
| May 6, 2025 | Expired or cancelled cancelled May 2026 | 149 Day St | horizontal addition to existing single family residence to convert single family residence to a two family residence, fully ada accessible units. note- planning approval letter (pal) is attached.Details
horizontal addition to existing single family residence to convert single family residence to a two family residence, fully ada accessible units. note- planning approval letter (pal) is attached. | $480,000 |
| Apr 4, 2025 | Completed final sign-off Aug 2025 | 67 Capistrano Av | partial foundation replacementDetails
partial foundation replacement | $110,000 |
| Mar 4, 2025 | Completed final sign-off Apr 2025 | 2123 Pierce St | to obtain final inspection for work approved under pa# 202008171951. all work is complete.Details
to obtain final inspection for work approved under pa# 202008171951. all work is complete. | |
| Mar 4, 2025 | Completed final sign-off Apr 2025 | 1614 Castro St | to obtain final inspection for work approved under pa# 202204182408. all work is complete.Details
to obtain final inspection for work approved under pa# 202204182408. all work is complete. | |
| Feb 24, 2025 | Completed final sign-off Aug 2025 | 1749 Sanchez St | removal of non conforming interior sprial staircase of contruction of new straight run interior staircase. no changes to exterior no plumbing no changes to use or occupancy.Details
removal of non conforming interior sprial staircase of contruction of new straight run interior staircase. no changes to exterior no plumbing no changes to use or occupancy. | $20,000 |
| Feb 3, 2025 | Completed final sign-off Aug 2025 | 1749 Sanchez St | revision 202412036057- (n) primary bath/closet layout on 3rd floor. enlarge opening between kitchen and sitting room on 2nd floorDetails
revision 202412036057- (n) primary bath/closet layout on 3rd floor. enlarge opening between kitchen and sitting room on 2nd floor | |
| Jan 22, 2025 | In progress issued Jan 2025 | 2 Everson St | remodel wine closet, replace (e) evaporation unit with new; add insulation, tile floor, add new wine racks, non-structural, no wall construction or change in plumbing fixture count.add (n) wine racksDetails
remodel wine closet, replace (e) evaporation unit with new; add insulation, tile floor, add new wine racks, non-structural, no wall construction or change in plumbing fixture count.add (n) wine racks | $20,000 |
| Dec 3, 2024 | Completed final sign-off Aug 2025 | 1749 Sanchez St | remodel including bathroom and closet addition on 3/f, kitchen remodel, alterations to interior partitions, utility remodel in garage. scope includes removal of 1 light shaft/lightwell on north side.l no exterior changes proposed. note: 2 bathrooms being remodeled under pa# 202411205405Details
remodel including bathroom and closet addition on 3/f, kitchen remodel, alterations to interior partitions, utility remodel in garage. scope includes removal of 1 light shaft/lightwell on north side.l no exterior changes proposed. note: 2 bathrooms being remodeled under pa# 202411205405 | $330,000 |
| Nov 20, 2024 | Completed final sign-off Aug 2025 | 1749 Sanchez St | remodel 2 bathrooms in kindDetails
remodel 2 bathrooms in kind | $22,000 |
| Nov 20, 2024 | Expired or cancelled withdrawn Nov 2024 | 1749 Sanchez St | in-kind remodeling of 2 bathroom(s) in 1st fl, 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 2 bathroom(s) in 1st fl, 2nd fl with 0 shower pan(s). | $22,000 |
| Sep 4, 2024 | Completed final sign-off Dec 2024 | 151 Day St | residential lift installation by stiltz home liftsDetails
residential lift installation by stiltz home lifts | $35,000 |
| May 3, 2024 | Completed final sign-off Apr 2025 | 2128 Lyon St | repair dry rot handrail @ front entry way. repair dry rot to deck w/southside of buildingDetails
repair dry rot handrail @ front entry way. repair dry rot to deck w/southside of building | $15,000 |
| Apr 25, 2024 | Completed final sign-off Jun 2024 | 34 Castle St | repair dryrotted stairs at rear of building. - less than 50%.Details
repair dryrotted stairs at rear of building. - less than 50%. | $15,000 |
| Apr 25, 2024 | Completed final sign-off Apr 2024 | 3841 25th St | revision to pa# 202303173914t to show fireplace on plan.Details
revision to pa# 202303173914t to show fireplace on plan. | $7,500 |
| Apr 3, 2024 | Completed final sign-off Jun 2024 | 34 Castle St | replace dry rotted wood siding and trim at rear of building and in lightwell with new composition hardi plank siding.approx 250 ft2Details
replace dry rotted wood siding and trim at rear of building and in lightwell with new composition hardi plank siding.approx 250 ft2 | $20,000 |
| Nov 1, 2023 | Completed final sign-off Dec 2023 | 730 Elizabeth St | replace cracked/damaged stair treads/decking on front stairs in-kind (less than 50%)Details
replace cracked/damaged stair treads/decking on front stairs in-kind (less than 50%) | $7,500 |
| Jul 13, 2023 | Completed final sign-off Apr 2024 | 3841 25th St | remove cracked and fallen stone veneer at lower level on facade and replace with stucco.Details
remove cracked and fallen stone veneer at lower level on facade and replace with stucco. | $13,000 |
| Jun 1, 2023 | In progress issued May 2026 | 52 Caselli Av | horizontal & vertical addition. create 3-story residence, upper 2 floors(unit 1)-3 bedrm & 3 bathrm. lower floor(unit 2)-2 bedrm & 2 bathrm. height will not exceed (e) parapet height at front.Details
horizontal & vertical addition. create 3-story residence, upper 2 floors(unit 1)-3 bedrm & 3 bathrm. lower floor(unit 2)-2 bedrm & 2 bathrm. height will not exceed (e) parapet height at front. | $550,000 |
| Mar 17, 2023 | Completed final sign-off Apr 2024 | 3841 25th St | new rooms down. remodel of (e) storage area and bedroom to add 2 new bedrooms & 2 baths on (e) ground floor including bedrooms & window replacement, skylight and utlity upgrade.Details
new rooms down. remodel of (e) storage area and bedroom to add 2 new bedrooms & 2 baths on (e) ground floor including bedrooms & window replacement, skylight and utlity upgrade. | $350,000 |
| Feb 2, 2023 | Completed final sign-off Mar 2023 | 1 Miguel St | in-kind remodeling of 1 kitchen(s) in 1st flDetails
in-kind remodeling of 1 kitchen(s) in 1st fl | $11,000 |
| Jan 23, 2023 | Completed final sign-off May 2023 | 1320 Kearny St | water damage repairs to basement including new floor drain and installation of chricti box. connect to (e) sewer pipe and below basement and floor, new electrical lightingDetails
water damage repairs to basement including new floor drain and installation of chricti box. connect to (e) sewer pipe and below basement and floor, new electrical lighting | $3,000 |
| Dec 7, 2022 | Completed final sign-off Apr 2024 | 3841 25th St | remodel one kitchen and two bathrooms. retile front stairsDetails
remodel one kitchen and two bathrooms. retile front stairs | $80,000 |
| Nov 15, 2022 | Completed final sign-off Aug 2023 | 2504 Pacific Av | remodel primary bedroom, bathroom and closetDetails
remodel primary bedroom, bathroom and closet | $75,000 |
| Apr 18, 2022 | Expired or cancelled expired Apr 2025 | 1614 Castro St | remove and repair siding on rear of building (west side) to investigate and repair leak. replacement in kind.Details
remove and repair siding on rear of building (west side) to investigate and repair leak. replacement in kind. | $7,300 |
| Feb 16, 2022 | Completed final sign-off Mar 2023 | 2265 Broadway | for unit 1, 1 bathroom remodel - replace toilet, tub, and vanity. replace tile at bathroom -guest room. no wall or layout changes.Details
for unit 1, 1 bathroom remodel - replace toilet, tub, and vanity. replace tile at bathroom -guest room. no wall or layout changes. | $15,000 |
| Dec 15, 2021 | Completed final sign-off Aug 2022 | 34 Castle St | removing 3 posts in garage, new centerline footing.Details
removing 3 posts in garage, new centerline footing. | $10,000 |
| Nov 4, 2021 | Completed final sign-off Aug 2022 | 34 Castle St | garage repairs and improvement. replacement of 2 hot water heater, furnace in new location. replacement of concrete slab floor. installation of surface drainage channel for water seepage. new sheetrock, installation and painting thru. elec, ltg improvements.Details
garage repairs and improvement. replacement of 2 hot water heater, furnace in new location. replacement of concrete slab floor. installation of surface drainage channel for water seepage. new sheetrock, installation and painting thru. elec, ltg improvements. | $30,000 |
| Nov 4, 2021 | Completed final sign-off Mar 2023 | 2265 Broadway | remodel of appartment: scope includes 1 bathroom remodel in kind, kitchen remodel including new appliances and cabinetry, new closet layout, relocation of 2 interior doors and 1 interior partition, installation of new washer and dryer. also electical upgrade in remodeled areas and selected areasDetails
remodel of appartment: scope includes 1 bathroom remodel in kind, kitchen remodel including new appliances and cabinetry, new closet layout, relocation of 2 interior doors and 1 interior partition, installation of new washer and dryer. also electical upgrade in remodeled areas and selected areas | $40,000 |
| Nov 4, 2021 | Completed final sign-off Aug 2022 | 34 Castle St | bathroom remodel to bathroom on 34 castle street; including new plumbing fixtures, tile, lighting. electrical upgrades as required. installation of new bathroom fan to 36 castle street. install handrail at left rear stairs (from backyard to garage).Details
bathroom remodel to bathroom on 34 castle street; including new plumbing fixtures, tile, lighting. electrical upgrades as required. installation of new bathroom fan to 36 castle street. install handrail at left rear stairs (from backyard to garage). | $10,000 |
| Nov 2, 2021 | Completed final sign-off May 2023 | 149 16th Av | remodel of a sfd.kitchen,family room & powder room @ the 2nd story(plum,ele & mech) work included.will not increase tile height of the structure or be visible from street.Details
remodel of a sfd.kitchen,family room & powder room @ the 2nd story(plum,ele & mech) work included.will not increase tile height of the structure or be visible from street. | $250,000 |
| Sep 29, 2021 | Completed final sign-off Dec 2021 | 142 Duncan St | install new gas fireplace in 142 duncan (top unit)- use existing chase. fire place in living room. non structural since replacing existing fireplace. direct-vent fireplaceDetails
install new gas fireplace in 142 duncan (top unit)- use existing chase. fire place in living room. non structural since replacing existing fireplace. direct-vent fireplace | $10,000 |
| Sep 29, 2021 | Completed final sign-off Jun 2022 | 523 Alvarado St | revision to permit #201803022752: revise rear deck to less than 30" above grade, delete rear exterior spiral convenience stair, change rear window from aluminum clad double hung to aluminum casement, revise size of rear doors delete 3 east facing window. o work visible from street.Details
revision to permit #201803022752: revise rear deck to less than 30" above grade, delete rear exterior spiral convenience stair, change rear window from aluminum clad double hung to aluminum casement, revise size of rear doors delete 3 east facing window. o work visible from street. | |
| Aug 24, 2021 | Completed final sign-off Oct 2021 | 144 Fairmount St | bath remodel. leak repair, remove vanity from wall of master bath. replace pex piling for hot water in wall of master bath with copper pipe and reconnect to pex piding at ceioing level. reinstall vanity and retile wall- lights per cec 150.0 (k)Details
bath remodel. leak repair, remove vanity from wall of master bath. replace pex piling for hot water in wall of master bath with copper pipe and reconnect to pex piding at ceioing level. reinstall vanity and retile wall- lights per cec 150.0 (k) | $7,000 |
| Aug 24, 2021 | Completed final sign-off Feb 2022 | 1614 Castro St | remodel bath on top floor. replace vanity with new vanity. install new shower stall and toilet. re-tile bathroom lighst per cec 150.0 (k)Details
remodel bath on top floor. replace vanity with new vanity. install new shower stall and toilet. re-tile bathroom lighst per cec 150.0 (k) | $20,000 |
| Apr 14, 2021 | Completed final sign-off Oct 2025 | 235 28th St | 3rd floor addition to existing single residence in order to provide 3 bedrooms and 2 bathrooms on top floor. remodel of existing first floor bedrooms to create family room, exercise area, and home office.Details
3rd floor addition to existing single residence in order to provide 3 bedrooms and 2 bathrooms on top floor. remodel of existing first floor bedrooms to create family room, exercise area, and home office. | $500,000 |
| Dec 4, 2020 | Completed final sign-off Jul 2021 | 80 28th St | remove plaster ceiling in lower unit-80, replace with dry wall to create 1-hr fire seperation w/ upper unit-82.Details
remove plaster ceiling in lower unit-80, replace with dry wall to create 1-hr fire seperation w/ upper unit-82. | $40,000 |
| Nov 4, 2020 | Completed final sign-off Jan 2021 | 3716 Cesar Chavez St | remodel kitchen, new cabinets and countertop in kind at upper unit.Details
remodel kitchen, new cabinets and countertop in kind at upper unit. | $30,000 |
| Sep 30, 2020 | Completed final sign-off Dec 2020 | 1964 Pacific Av | unit 6 - 1 door and 2 windows reprlacement in rear of building. non street visible. remove/replace french door and windows from unit 6 (rear). repair dyr rot and wall. all work in-kindDetails
unit 6 - 1 door and 2 windows reprlacement in rear of building. non street visible. remove/replace french door and windows from unit 6 (rear). repair dyr rot and wall. all work in-kind | $20,000 |
| Aug 17, 2020 | Expired or cancelled expired Apr 2025 | 2123 Pierce St | remove and replace siding on east side of building to investigate and repair leakDetails
remove and replace siding on east side of building to investigate and repair leak | $8,000 |
| Jun 25, 2020 | Completed final sign-off Aug 2020 | 147 29th St | final as-built revision to pa#2017-0315-1524. revisions include reduction of conditioned floor area on 2nd floor at rear of building to create a covered porch, within existing building envelope. minor interior alterations to bathrooms. add bedroom on 1st floor facing rear yard.Details
final as-built revision to pa#2017-0315-1524. revisions include reduction of conditioned floor area on 2nd floor at rear of building to create a covered porch, within existing building envelope. minor interior alterations to bathrooms. add bedroom on 1st floor facing rear yard. | |
| Jun 11, 2020 | Completed final sign-off Jan 2021 | 1011 Church St | bathroom remodel including new tile, plumbing, & cabinetry. all work in kind and same location.Details
bathroom remodel including new tile, plumbing, & cabinetry. all work in kind and same location. | $15,000 |
| May 27, 2020 | Completed final sign-off Jul 2020 | 67 Capistrano Av | remove and replace 150 square feet of termite damaged siding on s east corner of building not visible to the street.Details
remove and replace 150 square feet of termite damaged siding on s east corner of building not visible to the street. | $8,000 |
| Feb 28, 2020 | Completed final sign-off Mar 2020 | 142 Duncan St | replace dry rotted siding in kind on west side of bldgDetails
replace dry rotted siding in kind on west side of bldg | $5,000 |
| Feb 19, 2020 | Completed final sign-off Jul 2021 | 80 28th St | revision to pa 2019-1125-8152 rooms down addition to unit 80 (2nd fl) in rear of (e) garage. comprisinsg of addition of 510 sf under (e) volume. replacement of 2 exterior windows into rear yard in (n) openings. new wood sashes in (e) windows, related electrical & mechanicalDetails
revision to pa 2019-1125-8152 rooms down addition to unit 80 (2nd fl) in rear of (e) garage. comprisinsg of addition of 510 sf under (e) volume. replacement of 2 exterior windows into rear yard in (n) openings. new wood sashes in (e) windows, related electrical & mechanical | $220,000 |
| Feb 18, 2020 | Completed final sign-off Mar 2020 | 61 Vicksburg St | repair damage and deteriated redwood decking on deck aat 2nd story with ipe decking. resecure and replace handrailes as need. rear yeard deck. to be replace in-kind decking platform only. no structural work.Details
repair damage and deteriated redwood decking on deck aat 2nd story with ipe decking. resecure and replace handrailes as need. rear yeard deck. to be replace in-kind decking platform only. no structural work. | $50,000 |
| Feb 18, 2020 | Completed final sign-off Jul 2020 | 67 Capistrano Av | replace 6 window sashes in back of building with identical wood sashes-not visible from street.Details
replace 6 window sashes in back of building with identical wood sashes-not visible from street. | $4,000 |
| Jan 30, 2020 | Completed final sign-off Jul 2021 | 80 28th St | unit 82: remodel kitchen and 2 baths in unit 82. new cabinets and countertops. 149 sqft kitchen. 2 bathrooms 5' x 8' eaDetails
unit 82: remodel kitchen and 2 baths in unit 82. new cabinets and countertops. 149 sqft kitchen. 2 bathrooms 5' x 8' ea | $45,000 |
| Nov 25, 2019 | Completed final sign-off Jul 2021 | 80 28th St | remodel 1 kitchen & 2 bathrooms. new cabinets, and coutop & new fixtures.Details
remodel 1 kitchen & 2 bathrooms. new cabinets, and coutop & new fixtures. | $30,000 |
| Oct 24, 2019 | Completed final sign-off Dec 2019 | 1011 Church St | window replacement, guardrail at 2nd flDetails
window replacement, guardrail at 2nd fl | $8,000 |
| Aug 22, 2019 | Completed final sign-off Aug 2019 | 3922 22nd St | to obtain final inspection for work approved under pa 201703201887. all work is completeDetails
to obtain final inspection for work approved under pa 201703201887. all work is complete | |
| Jul 30, 2019 | Expired or cancelled cancelled Jan 2026 | 1 Miguel St | relocate and remodel kitchen in north unit, no walls moved, no new wallsDetails
relocate and remodel kitchen in north unit, no walls moved, no new walls | $16,000 |
| Mar 8, 2019 | Completed final sign-off Mar 2019 | 1027 Church St | to obtain final inspection for work approved under pa# 2016-0624-0879. all work is complete.Details
to obtain final inspection for work approved under pa# 2016-0624-0879. all work is complete. | |
| Feb 4, 2019 | Completed final sign-off Apr 2026 | 410 29th St | remodel of (e) house to convert ground level garage and storage to occupied space - 3 bedroom and 2 bath. no change to bulk or mass. replacement of (e) windows and new windows.Details
remodel of (e) house to convert ground level garage and storage to occupied space - 3 bedroom and 2 bath. no change to bulk or mass. replacement of (e) windows and new windows. | $280,000 |
| Jan 22, 2019 | Completed final sign-off Oct 2019 | 1 Miguel St | replace 4 windows on north side and 2 windows on east side with aluminum to match existing in same openings. no other work.Details
replace 4 windows on north side and 2 windows on east side with aluminum to match existing in same openings. no other work. | $17,000 |
| Jan 22, 2019 | Completed final sign-off Oct 2019 | 1 Miguel St | remodel bathroom on north side of lower level. bathroom approximately 7' x 10'Details
remodel bathroom on north side of lower level. bathroom approximately 7' x 10' | $40,000 |
| Sep 20, 2018 | Completed final sign-off Jul 2019 | 1614 Castro St | kitchen remodel. scope includes new finishes and fixtures. scope includes removal of rear yard windows and doors and new windows and doors. closure of 1 window. related electrical and plumbing work.Details
kitchen remodel. scope includes new finishes and fixtures. scope includes removal of rear yard windows and doors and new windows and doors. closure of 1 window. related electrical and plumbing work. | $75,000 |
| Sep 10, 2018 | Completed final sign-off Jun 2019 | 268 Prospect Av | inkind repair of fire-damaged wood shingles at front (approx. 20 sf)Details
inkind repair of fire-damaged wood shingles at front (approx. 20 sf) | $4,500 |
| Aug 31, 2018 | Completed final sign-off Sep 2018 | 1027 Church St | renew expired pa #201606240879 for final inspection. all work is completed.Details
renew expired pa #201606240879 for final inspection. all work is completed. | |
| Aug 9, 2018 | Completed final sign-off Jun 2019 | 526 Valley St | remove and replace in kind existing stucco finish and/or vener brick to repair dry rotted supporting sheating. molding vener as required at the south building facade.Details
remove and replace in kind existing stucco finish and/or vener brick to repair dry rotted supporting sheating. molding vener as required at the south building facade. | $8,000 |
| Aug 7, 2018 | Completed final sign-off Jun 2019 | 268 Prospect Av | repair and replace finishes, damaged as a result of fire. new hardwood floors, new bathroom tiles, new drywall, electrical wires, outlets, fixture, switches as needed. replacement of framing in kind. exterior work under separate permit.Details
repair and replace finishes, damaged as a result of fire. new hardwood floors, new bathroom tiles, new drywall, electrical wires, outlets, fixture, switches as needed. replacement of framing in kind. exterior work under separate permit. | $88,000 |
| May 22, 2018 | Completed final sign-off Jun 2019 | 268 Prospect Av | to comply w/ nov#201728203 exploratory demolition of lath & plaster to investigate extent of fire damage in walls & ceilings. remove lath & plaster from 1 wall in ceiling living rm & dining rm. remove tile finishes in bathroom upstairs one wall in rear bedrooms. replace in-kind.Details
to comply w/ nov#201728203 exploratory demolition of lath & plaster to investigate extent of fire damage in walls & ceilings. remove lath & plaster from 1 wall in ceiling living rm & dining rm. remove tile finishes in bathroom upstairs one wall in rear bedrooms. replace in-kind. | $7,600 |
| Apr 18, 2018 | Completed final sign-off Aug 2019 | 3922 22nd St | revision to pa 2016-1013-0151 - reduction is removal of approved garage addition in front yard. new landscape stairs & facade restoration remains in scope & previously approvedDetails
revision to pa 2016-1013-0151 - reduction is removal of approved garage addition in front yard. new landscape stairs & facade restoration remains in scope & previously approved | |
| Mar 2, 2018 | Completed final sign-off Jun 2022 | 523 Alvarado St | 3 floor horizontal addition @ rear. interior remodel. replace front facade windows in-kind with new wood windows. 1 new master bedroom, 1 new bathroom & 1 new living room, 1 new family room, 1 new mech room, 1 new wine storage.Details
3 floor horizontal addition @ rear. interior remodel. replace front facade windows in-kind with new wood windows. 1 new master bedroom, 1 new bathroom & 1 new living room, 1 new family room, 1 new mech room, 1 new wine storage. | $500,000 |
| Nov 30, 2017 | Never finaled issued Dec 2017, no final | 4225 23rd St | as built revisions to permit 201603031160. reconfigure rear yard stair, new bedroom @ ground flr, infill garage entry door from inside only, 3rd flr egress windows modified.Details
as built revisions to permit 201603031160. reconfigure rear yard stair, new bedroom @ ground flr, infill garage entry door from inside only, 3rd flr egress windows modified. | |
| Oct 24, 2017 | Never finaled issued Dec 2017, no final | 3922 22nd St | shoring work only for garage addtions associated with pa 2016-1013-0151. maher naDetails
shoring work only for garage addtions associated with pa 2016-1013-0151. maher na | $15,000 |
| Oct 13, 2017 | Completed final sign-off Dec 2017 | 1075 Valencia St | apt 7: renovate kitchen & drywall work throughout due to work required for soft story upgrade under pa#201704123849Details
apt 7: renovate kitchen & drywall work throughout due to work required for soft story upgrade under pa#201704123849 | $25,000 |
| Oct 13, 2017 | Completed final sign-off May 2018 | 142 De Soto St | kitchen & bathroom remodel. new finishes, fixtures. removal of exterior door and 2 windows, installation of 1 new window & replacement of existing bay windowsDetails
kitchen & bathroom remodel. new finishes, fixtures. removal of exterior door and 2 windows, installation of 1 new window & replacement of existing bay windows | $40,000 |
| Jun 12, 2017 | Completed final sign-off Jul 2018 | 4225 23rd St | add window @ ground levelDetails
add window @ ground level | $10,000 |
| May 5, 2017 | Completed final sign-off Aug 2017 | 151 Day St | kitchen remodel: replace cabinets counter tops and fixtures. high efficacy lighting. no change in all and opeing layoutDetails
kitchen remodel: replace cabinets counter tops and fixtures. high efficacy lighting. no change in all and opeing layout | $24,500 |
| Apr 12, 2017 | Completed final sign-off Apr 2018 | 1075 Valencia St | soft story upgrade per sfbc chapter 34 b a engineering criteria per 2012 ibc ap a4Details
soft story upgrade per sfbc chapter 34 b a engineering criteria per 2012 ibc ap a4 | $100,000 |
| Mar 29, 2017 | Completed final sign-off Oct 2017 | 1045 Church St | as built revision to 201604286005 add skylight, close property line windows and minor interior changesDetails
as built revision to 201604286005 add skylight, close property line windows and minor interior changes | |
| Mar 20, 2017 | Expired or cancelled expired Aug 2019 | 3922 22nd St | repair existing dry rotted deck at rear of building, less than 50% repair. like for like redwood.Details
repair existing dry rotted deck at rear of building, less than 50% repair. like for like redwood. | $3,500 |
| Mar 15, 2017 | Completed final sign-off Sep 2020 | 147 29th St | vertical & horizontal addition, remodel new 3rd floor, new interior layout, finishes and fixtures, new windows and skylights, add 3 bathrooms and three bedrooms on 3rd floorDetails
vertical & horizontal addition, remodel new 3rd floor, new interior layout, finishes and fixtures, new windows and skylights, add 3 bathrooms and three bedrooms on 3rd floor | $650,000 |
| Feb 27, 2017 | Completed final sign-off Aug 2019 | 3922 22nd St | replace existing sliding glass door and add two (2) new windows at rear of building, not visable from street. n/a ordinance #155-13Details
replace existing sliding glass door and add two (2) new windows at rear of building, not visable from street. n/a ordinance #155-13 | $15,000 |
| Jan 23, 2017 | Completed final sign-off Apr 2017 | 61 Vicksburg St | repair dry rotted front stairs (6 steps abd upper landing) less than 50% repair, in kindDetails
repair dry rotted front stairs (6 steps abd upper landing) less than 50% repair, in kind | $5,000 |
| Nov 9, 2016 | Completed final sign-off Oct 2017 | 67 Capistrano Av | replace three windows in front bay and one window in setback (side) in-kind. true divided-light to match existing wood windows. patch stucco as necessary to repair any dryrot found around windows. no rough opening changes. u-factor for windows replacement shall not exceed 0.32.Details
replace three windows in front bay and one window in setback (side) in-kind. true divided-light to match existing wood windows. patch stucco as necessary to repair any dryrot found around windows. no rough opening changes. u-factor for windows replacement shall not exceed 0.32. | $25,000 |
| Oct 13, 2016 | Completed final sign-off Aug 2019 | 3922 22nd St | removal and replacement of exterior stairs in front yard, improvements to building facade including new siding, windows and construction of a single car garage in front yard set back, attached to buildingDetails
removal and replacement of exterior stairs in front yard, improvements to building facade including new siding, windows and construction of a single car garage in front yard set back, attached to building | $110,000 |
| Sep 28, 2016 | Completed final sign-off Oct 2017 | 1045 Church St | two new cantilevered decks off of rear of building at 1st and 2nd floors.Details
two new cantilevered decks off of rear of building at 1st and 2nd floors. | $35,000 |
| Sep 26, 2016 | Completed final sign-off Aug 2017 | 896 De Haro St | revision to app#201204249018 s2 to remove one 3'-0" long non-bearing wall at basement level and install elevator equipment at wall area.Details
revision to app#201204249018 s2 to remove one 3'-0" long non-bearing wall at basement level and install elevator equipment at wall area. | |
| Sep 2, 2016 | Completed final sign-off Aug 2017 | 896 De Haro St | revision to 201204249018(s2), equivalency per ab-005 to allow a metal frame non-rated window in lieu of the 45 min. approved window #29; with the use of ordinary temperature, quick response sprinklers.Details
revision to 201204249018(s2), equivalency per ab-005 to allow a metal frame non-rated window in lieu of the 45 min. approved window #29; with the use of ordinary temperature, quick response sprinklers. | |
| Jul 14, 2016 | Completed final sign-off Aug 2018 | 1027 Church St | replace tile, change toilet and vanity ; tile shower - work all to take place in 2nd bath on 3/fDetails
replace tile, change toilet and vanity ; tile shower - work all to take place in 2nd bath on 3/f | $15,000 |
| Jun 24, 2016 | Expired or cancelled expired Sep 2018 | 1027 Church St | new roof deck in rear yard constructed on roof of (e) detached garage structure. new 3 foot bridge to connect proposed deck to (e) 2nd floor kticehn/. replace kitchen window to door.Details
new roof deck in rear yard constructed on roof of (e) detached garage structure. new 3 foot bridge to connect proposed deck to (e) 2nd floor kticehn/. replace kitchen window to door. | $20,000 |
| May 3, 2016 | Completed final sign-off Sep 2016 | 12 Henry St | addition of toilet to existing g/f common work room & exercise room to (e) common shared space of 3 units bldg. as allowed per bulletin #1. n/a ordinance #155-13Details
addition of toilet to existing g/f common work room & exercise room to (e) common shared space of 3 units bldg. as allowed per bulletin #1. n/a ordinance #155-13 | $15,000 |
| Apr 28, 2016 | Completed final sign-off Oct 2017 | 1045 Church St | (n) garage and interior remodel and window replacement on front and rear elevations. new rear deck. see permit for details. infill and remodel. new driveway by street improvement permit. new cantilevered deck.Details
(n) garage and interior remodel and window replacement on front and rear elevations. new rear deck. see permit for details. infill and remodel. new driveway by street improvement permit. new cantilevered deck. | $350,000 |
| Apr 1, 2016 | Completed final sign-off Oct 2016 | 522 Valley St | replace bathroom fixtures & fittings. replace kitchen cabinets & counters.Details
replace bathroom fixtures & fittings. replace kitchen cabinets & counters. | $25,000 |
| Mar 28, 2016 | Never finaled issued Mar 2016, no final | 522 Valley St | replace tile in bathroom on floor & three walls around bathtub. existing fixts to remain. no elect or plumbing work.Details
replace tile in bathroom on floor & three walls around bathtub. existing fixts to remain. no elect or plumbing work. | $6,000 |
| Mar 21, 2016 | Completed final sign-off Oct 2017 | 1045 Church St | remodel kitchen and baths, remove cracked plaster through out and replace with drywall, redo electrical and plumbing throughout.Details
remodel kitchen and baths, remove cracked plaster through out and replace with drywall, redo electrical and plumbing throughout. | $220,000 |
| Mar 3, 2016 | Completed final sign-off Jul 2018 | 4225 23rd St | vertical & horizontal addition. excavation of storage area to add 2 new bedrooms & 2 baths @ ground level including 12' single story popout. conversion of attic space to occupied floor with 3 bedrooms. window replacement, skylight, landscaping.Details
vertical & horizontal addition. excavation of storage area to add 2 new bedrooms & 2 baths @ ground level including 12' single story popout. conversion of attic space to occupied floor with 3 bedrooms. window replacement, skylight, landscaping. | $600,000 |
| Feb 22, 2016 | Completed final sign-off Apr 2016 | 1075 Valencia St | revision to pa#2016-0129-8398. change from partial to full bathroom. remodel & replace plaster throughout unit #1 only.Details
revision to pa#2016-0129-8398. change from partial to full bathroom. remodel & replace plaster throughout unit #1 only. | $25,000 |
| Jan 29, 2016 | Completed final sign-off Apr 2016 | 1075 Valencia St | apt. #1: remodel kitchen. new cabinets. partial bathroom remodel. remove cracked plaster as necessary and replace with drywall.Details
apt. #1: remodel kitchen. new cabinets. partial bathroom remodel. remove cracked plaster as necessary and replace with drywall. | $50,000 |
| Oct 29, 2015 | Completed final sign-off Dec 2015 | 894 De Haro St | remove approximately 900 sq ft of cement shingle of south side of building, paint existing siding. existing wood siding underneathDetails
remove approximately 900 sq ft of cement shingle of south side of building, paint existing siding. existing wood siding underneath | $6,000 |
| Sep 17, 2015 | Completed final sign-off Sep 2016 | 245 Prospect Av | new foundation along south property line.Details
new foundation along south property line. | $25,000 |
| Aug 27, 2015 | Completed final sign-off Dec 2015 | 69 28th St | addition of roof deckDetails
addition of roof deck | $1,000 |