Back to kitchen remodel contractors
Keegan Contruction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Aug 2001 to Aug 2026
- Last 24 months
- 17 permits filed
292 permits since 2000: 254 completed, 4 in progress, 9 never finaled, 25 expired or cancelled.
Of the 9 never-finaled permits, 2 are 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
49 kitchen remodel permits: 43 completed, 2 never finaled, 4 expired or cancelled. Typically 0 days from filing to permit and 245 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 11, 2025 | Completed final sign-off Aug 2026 | 338 28th St | unit 2: removal of east lightwell to create 2nd bathroom. removal of interior wall b/t kitchen and living room. replacement of 2 windows at rear with in-swing french door. related electrical and plumbing. proposed infill will only obsure 36" vertical of adjacent lightwell. 45 sf added area.Details
unit 2: removal of east lightwell to create 2nd bathroom. removal of interior wall b/t kitchen and living room. replacement of 2 windows at rear with in-swing french door. related electrical and plumbing. proposed infill will only obsure 36" vertical of adjacent lightwell. 45 sf added area. | $38,000 |
| Sep 17, 2025 | Completed final sign-off Aug 2026 | 338 28th St | unit 2: remodel kitchen and bathroom. like for like. replace knob and tube wiring. remove plaster insulate and update electrical, intsall dry wall.Details
unit 2: remodel kitchen and bathroom. like for like. replace knob and tube wiring. remove plaster insulate and update electrical, intsall dry wall. | $100,000 |
| Feb 3, 2025 | Completed final sign-off Aug 2025 | 1749 Sanchez St | revision 202412036057- (n) primary bath/closet layout on 3rd floor. enlarge opening between kitchen and sitting room on 2nd floorDetails
revision 202412036057- (n) primary bath/closet layout on 3rd floor. enlarge opening between kitchen and sitting room on 2nd floor | |
| Dec 3, 2024 | Completed final sign-off Aug 2025 | 1749 Sanchez St | remodel including bathroom and closet addition on 3/f, kitchen remodel, alterations to interior partitions, utility remodel in garage. scope includes removal of 1 light shaft/lightwell on north side.l no exterior changes proposed. note: 2 bathrooms being remodeled under pa# 202411205405Details
remodel including bathroom and closet addition on 3/f, kitchen remodel, alterations to interior partitions, utility remodel in garage. scope includes removal of 1 light shaft/lightwell on north side.l no exterior changes proposed. note: 2 bathrooms being remodeled under pa# 202411205405 | $330,000 |
| Feb 2, 2023 | Completed final sign-off Mar 2023 | 1 Miguel St | in-kind remodeling of 1 kitchen(s) in 1st flDetails
in-kind remodeling of 1 kitchen(s) in 1st fl | $11,000 |
| Dec 7, 2022 | Completed final sign-off Apr 2024 | 3841 25th St | remodel one kitchen and two bathrooms. retile front stairsDetails
remodel one kitchen and two bathrooms. retile front stairs | $80,000 |
| Nov 4, 2021 | Completed final sign-off Mar 2023 | 2265 Broadway | remodel of appartment: scope includes 1 bathroom remodel in kind, kitchen remodel including new appliances and cabinetry, new closet layout, relocation of 2 interior doors and 1 interior partition, installation of new washer and dryer. also electical upgrade in remodeled areas and selected areasDetails
remodel of appartment: scope includes 1 bathroom remodel in kind, kitchen remodel including new appliances and cabinetry, new closet layout, relocation of 2 interior doors and 1 interior partition, installation of new washer and dryer. also electical upgrade in remodeled areas and selected areas | $40,000 |
| Nov 2, 2021 | Completed final sign-off May 2023 | 149 16th Av | remodel of a sfd.kitchen,family room & powder room @ the 2nd story(plum,ele & mech) work included.will not increase tile height of the structure or be visible from street.Details
remodel of a sfd.kitchen,family room & powder room @ the 2nd story(plum,ele & mech) work included.will not increase tile height of the structure or be visible from street. | $250,000 |
| Nov 4, 2020 | Completed final sign-off Jan 2021 | 3716 Cesar Chavez St | remodel kitchen, new cabinets and countertop in kind at upper unit.Details
remodel kitchen, new cabinets and countertop in kind at upper unit. | $30,000 |
| Jan 30, 2020 | Completed final sign-off Jul 2021 | 80 28th St | unit 82: remodel kitchen and 2 baths in unit 82. new cabinets and countertops. 149 sqft kitchen. 2 bathrooms 5' x 8' eaDetails
unit 82: remodel kitchen and 2 baths in unit 82. new cabinets and countertops. 149 sqft kitchen. 2 bathrooms 5' x 8' ea | $45,000 |
| Nov 25, 2019 | Completed final sign-off Jul 2021 | 80 28th St | remodel 1 kitchen & 2 bathrooms. new cabinets, and coutop & new fixtures.Details
remodel 1 kitchen & 2 bathrooms. new cabinets, and coutop & new fixtures. | $30,000 |
| Jul 30, 2019 | Expired or cancelled cancelled Jan 2026 | 1 Miguel St | relocate and remodel kitchen in north unit, no walls moved, no new wallsDetails
relocate and remodel kitchen in north unit, no walls moved, no new walls | $16,000 |
| Sep 20, 2018 | Completed final sign-off Jul 2019 | 1614 Castro St | kitchen remodel. scope includes new finishes and fixtures. scope includes removal of rear yard windows and doors and new windows and doors. closure of 1 window. related electrical and plumbing work.Details
kitchen remodel. scope includes new finishes and fixtures. scope includes removal of rear yard windows and doors and new windows and doors. closure of 1 window. related electrical and plumbing work. | $75,000 |
| Oct 13, 2017 | Completed final sign-off May 2018 | 142 De Soto St | kitchen & bathroom remodel. new finishes, fixtures. removal of exterior door and 2 windows, installation of 1 new window & replacement of existing bay windowsDetails
kitchen & bathroom remodel. new finishes, fixtures. removal of exterior door and 2 windows, installation of 1 new window & replacement of existing bay windows | $40,000 |
| Oct 13, 2017 | Completed final sign-off Dec 2017 | 1075 Valencia St | apt 7: renovate kitchen & drywall work throughout due to work required for soft story upgrade under pa#201704123849Details
apt 7: renovate kitchen & drywall work throughout due to work required for soft story upgrade under pa#201704123849 | $25,000 |
| May 5, 2017 | Completed final sign-off Aug 2017 | 151 Day St | kitchen remodel: replace cabinets counter tops and fixtures. high efficacy lighting. no change in all and opeing layoutDetails
kitchen remodel: replace cabinets counter tops and fixtures. high efficacy lighting. no change in all and opeing layout | $24,500 |
| Jun 24, 2016 | Expired or cancelled expired Sep 2018 | 1027 Church St | new roof deck in rear yard constructed on roof of (e) detached garage structure. new 3 foot bridge to connect proposed deck to (e) 2nd floor kticehn/. replace kitchen window to door.Details
new roof deck in rear yard constructed on roof of (e) detached garage structure. new 3 foot bridge to connect proposed deck to (e) 2nd floor kticehn/. replace kitchen window to door. | $20,000 |
| Apr 1, 2016 | Completed final sign-off Oct 2016 | 522 Valley St | replace bathroom fixtures & fittings. replace kitchen cabinets & counters.Details
replace bathroom fixtures & fittings. replace kitchen cabinets & counters. | $25,000 |
| Mar 21, 2016 | Completed final sign-off Oct 2017 | 1045 Church St | remodel kitchen and baths, remove cracked plaster through out and replace with drywall, redo electrical and plumbing throughout.Details
remodel kitchen and baths, remove cracked plaster through out and replace with drywall, redo electrical and plumbing throughout. | $220,000 |
| Jan 29, 2016 | Completed final sign-off Apr 2016 | 1075 Valencia St | apt. #1: remodel kitchen. new cabinets. partial bathroom remodel. remove cracked plaster as necessary and replace with drywall.Details
apt. #1: remodel kitchen. new cabinets. partial bathroom remodel. remove cracked plaster as necessary and replace with drywall. | $50,000 |
| Jul 2, 2015 | Completed final sign-off Nov 2015 | 4042 Cesar Chavez St | kitchen remodel, new cabinets, countertops, appliances, no change to door or walls.Details
kitchen remodel, new cabinets, countertops, appliances, no change to door or walls. | $30,000 |
| Jun 11, 2014 | Completed final sign-off Apr 2015 | 2444 Clay St | interior remodel of existing kitchen & laundry room, scope includes new cabinetry, fixtures, finishes & related plumbing & electrical work, scope includes limited modifications to interior walls; compliance with ord 155-13 not requiredDetails
interior remodel of existing kitchen & laundry room, scope includes new cabinetry, fixtures, finishes & related plumbing & electrical work, scope includes limited modifications to interior walls; compliance with ord 155-13 not required | $90,000 |
| Apr 17, 2014 | Completed final sign-off Nov 2014 | 578 Joost Av | remodel kitchen, bathroom and powder room. replace cabinets, counter tops and fixtures.Details
remodel kitchen, bathroom and powder room. replace cabinets, counter tops and fixtures. | $112,000 |
| Feb 15, 2013 | Completed final sign-off Jun 2014 | 2701 Larkin St | replace kitchen cabinets & counters, install hardwood flooring in kitchen & living room. install new baseboard replace interior 5 doors,to martch other in unit keep appliances.Details
replace kitchen cabinets & counters, install hardwood flooring in kitchen & living room. install new baseboard replace interior 5 doors,to martch other in unit keep appliances. | $60,000 |
| Sep 4, 2012 | Completed final sign-off Dec 2012 | 2083 29th Av | replace kitchen cabinets and counter topsDetails
replace kitchen cabinets and counter tops | $11,000 |
| Aug 6, 2012 | Completed final sign-off Jun 2014 | 2701 Larkin St | revision to approved pa 2010/0721/7094 and pa 2012/0612/2406. work includes modifications to partitions in units 200 & 201 to reconfigure bathrooms, kitchens, closets. new finishes. work also includes one new 4x12 post at basement and first levels and 9(n) posts on 2nd floor.Details
revision to approved pa 2010/0721/7094 and pa 2012/0612/2406. work includes modifications to partitions in units 200 & 201 to reconfigure bathrooms, kitchens, closets. new finishes. work also includes one new 4x12 post at basement and first levels and 9(n) posts on 2nd floor. | $75,000 |
| Sep 22, 2011 | Completed final sign-off Jun 2014 | 2701 Larkin St | relocate interior walls @ 5th fl circulation space to merge units 400 and 401. retain both kitchens. note: planning dept. has pending 317 dr case# 2011.1072d, assigned to mary woodsDetails
relocate interior walls @ 5th fl circulation space to merge units 400 and 401. retain both kitchens. note: planning dept. has pending 317 dr case# 2011.1072d, assigned to mary woods | $40,000 |
| Nov 18, 2010 | Expired or cancelled expired Dec 2012 | 1050 North Point St | remodel 2 bathrooms & kitchen. remove ceiling tiles. re sheetrock. remove built ins & replace. repaint throughout. no structural work.Details
remodel 2 bathrooms & kitchen. remove ceiling tiles. re sheetrock. remove built ins & replace. repaint throughout. no structural work. | $75,000 |
| Oct 18, 2010 | Completed final sign-off Mar 2011 | 133 Vicksburg St | kitchen remodel. remove sunroom/kitchen dividing wall. re;lace 4 rear windows and doorDetails
kitchen remodel. remove sunroom/kitchen dividing wall. re;lace 4 rear windows and door | $28,000 |
| Sep 21, 2010 | Completed final sign-off Feb 2011 | 3756 Jackson St | install new kitchen cabinets. new backsplash. new appliancesDetails
install new kitchen cabinets. new backsplash. new appliances | $30,000 |
| Jun 28, 2010 | Never finaled issued Jan 2011, no final | 180 Collins St | enclosure of 93 sf of rear deck on 2nd floor of existing residence in rear of house to provide additional square footage to kitchen. new enclosed area is not in required rear yard setback & is lower than exsiting roof structure.Details
enclosure of 93 sf of rear deck on 2nd floor of existing residence in rear of house to provide additional square footage to kitchen. new enclosed area is not in required rear yard setback & is lower than exsiting roof structure. | $30,000 |
| Oct 23, 2009 | Completed final sign-off Oct 2010 | 2701 Larkin St | 4th fl only. unit 300: new 1/2 bath, remodel 2 full baths, reduce size of clsoet. unit 301: new 1/2 bath, 2 new closets, remodel kitchen, remodel 2 full bath rooms. unit 302: new 1/2 bathroom, remodel 2 full bathrooms, 3 new closets and remodel kitchen and laundry closet. include structural work.Details
4th fl only. unit 300: new 1/2 bath, remodel 2 full baths, reduce size of clsoet. unit 301: new 1/2 bath, 2 new closets, remodel kitchen, remodel 2 full bath rooms. unit 302: new 1/2 bathroom, remodel 2 full bathrooms, 3 new closets and remodel kitchen and laundry closet. include structural work. | $150,000 |
| Jul 17, 2009 | Completed final sign-off Dec 2010 | 373 Eureka St | remodel kitchen, remodel one bath and convert closet to new bathroom.Details
remodel kitchen, remodel one bath and convert closet to new bathroom. | $60,000 |
| Sep 16, 2008 | Completed final sign-off Aug 2009 | 2701 Larkin St | revision to appl #200506286306: 2nd floor - remodel trash receptacle storage, remodel bathroom & bedroom at unit 100. remodel kitchen & add new bthroom at unit 101. 3rd floor - remodel kitchen, dining area, bath & add new bedroom, relocate bedroom & kitchen, add new bedroom at unit 200.Details
revision to appl #200506286306: 2nd floor - remodel trash receptacle storage, remodel bathroom & bedroom at unit 100. remodel kitchen & add new bthroom at unit 101. 3rd floor - remodel kitchen, dining area, bath & add new bedroom, relocate bedroom & kitchen, add new bedroom at unit 200. | $30,000 |
| Aug 29, 2008 | Completed final sign-off Apr 2009 | 318 Texas St | reduction in width on north lightwell by 4'-0" at lower floor, remodel kitchen, add new bathroom & relocate bedroom on 2nd floor. reinforce foundation on south wall of garage.Details
reduction in width on north lightwell by 4'-0" at lower floor, remodel kitchen, add new bathroom & relocate bedroom on 2nd floor. reinforce foundation on south wall of garage. | $60,000 |
| Jul 3, 2008 | Completed final sign-off Apr 2009 | 318 Texas St | work @ unit# 320 only. remodel kitchen & 2 bathrooms. new fixtures, fittings, cabinets counter tops & finishes. all interior work.Details
work @ unit# 320 only. remodel kitchen & 2 bathrooms. new fixtures, fittings, cabinets counter tops & finishes. all interior work. | $48,000 |
| Jul 3, 2008 | Completed final sign-off Dec 2008 | 3004 Sacramento St | work @ unit# 3004a only. kitchen remodel. no changes to layout. cabinets, appliances, floor.Details
work @ unit# 3004a only. kitchen remodel. no changes to layout. cabinets, appliances, floor. | $40,000 |
| May 18, 2007 | Completed final sign-off Mar 2008 | 88 28th St | remodel kitchen and two and one half baths. and provide min. of 50% of kitchen light wattage in flourescent lights. flourescent lights or occupancy sensor in the bathroom. no window work.Details
remodel kitchen and two and one half baths. and provide min. of 50% of kitchen light wattage in flourescent lights. flourescent lights or occupancy sensor in the bathroom. no window work. | $60,000 |
| May 11, 2007 | Completed final sign-off Aug 2007 | 1521 Golden Gate Av | work at cottage. remodel kitchen & bath. provide: min 50% of kitchen light wattage in flourescent lights. flourescent lights or o.s. in bathroom.Details
work at cottage. remodel kitchen & bath. provide: min 50% of kitchen light wattage in flourescent lights. flourescent lights or o.s. in bathroom. | $17,000 |
| Dec 15, 2006 | Completed final sign-off Aug 2007 | 1521 Golden Gate Av | work @ unit# b only. replace kitchen cabinets & counter in unit# b (lower unit) replace vanity in bathroom. remodel powder room. no change in (e) lighting.Details
work @ unit# b only. replace kitchen cabinets & counter in unit# b (lower unit) replace vanity in bathroom. remodel powder room. no change in (e) lighting. | $35,000 |
| Mar 16, 2006 | Expired or cancelled expired May 2011 | 1907 Lyon St | demolish kitchen, (remove kitchen cabinets and appliances. remove lath + plaster from walls and ceiling.Details
demolish kitchen, (remove kitchen cabinets and appliances. remove lath + plaster from walls and ceiling. | $1,500 |
| Aug 22, 2005 | Completed final sign-off May 2006 | 2919 Fillmore St | remodel kitchen & 3 bathrooms.kitchen:replace cabinets,new fixtures,new appliances.bathroom:replaceDetails
remodel kitchen & 3 bathrooms.kitchen:replace cabinets,new fixtures,new appliances.bathroom:replace | $125,000 |
| Oct 8, 2004 | Completed final sign-off Jan 2005 | 984 Portola Dr | revision to permit 200407269764- kitchen remodel - removal bearing wall- installing beam in its placDetails
revision to permit 200407269764- kitchen remodel - removal bearing wall- installing beam in its plac | $3,000 |
| Jul 26, 2004 | Completed final sign-off Jan 2005 | 984 Portola Dr | remove (e) cabinets in kitchen,instsall new kitchen cabinet,sink & appliancesDetails
remove (e) cabinets in kitchen,instsall new kitchen cabinet,sink & appliances | $25,000 |
| Dec 19, 2003 | Completed final sign-off Jul 2009 | 84 28th St | interior renovation,remove kitchen cabinets,lathe/plaster,fixtures & fittings,exploratory demolitionDetails
interior renovation,remove kitchen cabinets,lathe/plaster,fixtures & fittings,exploratory demolition | $1,600 |
| Dec 19, 2003 | Completed final sign-off Apr 2008 | 61 Vicksburg St | remodel kitchen,remove kitchen cabinets,install new cabinets,fixtures & fittingsDetails
remodel kitchen,remove kitchen cabinets,install new cabinets,fixtures & fittings | $60,000 |
| Apr 8, 2003 | Never finaled issued Apr 2003, no final | 3099 Jackson St | remove kitchen cabinets & appliances, remove bathroom fix./fittings, remove lath/plaster from wallsDetails
remove kitchen cabinets & appliances, remove bathroom fix./fittings, remove lath/plaster from walls | $3,500 |
| Sep 20, 2002 | Completed final sign-off Jun 2003 | 47 Santa Marina St | remodel kitchen,bathroom (no structural change)Details
remodel kitchen,bathroom (no structural change) | $10,000 |
| Mar 7, 2002 | Completed final sign-off Apr 2002 | 2003 Pine St | remove kitchen cabinets, remove lath and plastic from wallsDetails
remove kitchen cabinets, remove lath and plastic from walls | $8,500 |