Block 0776, lot 021
1521 Golden Gate Av
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 31, 2012 | Completed final sign-off Feb 2012 | 1521 Golden Gate Av | Raymond Peng Construction | rear building- comply physical inspection report #cc-6033 for 1521a (rear building) only. see also pa#201111169072Details
rear building- comply physical inspection report #cc-6033 for 1521a (rear building) only. see also pa#201111169072 | |
| Nov 16, 2011 | Completed final sign-off Feb 2012 | 1521 Golden Gate Av | Raymond Peng Construction | to comply physical inspection #cc-6033 dated 6/1/2011.Details
to comply physical inspection #cc-6033 dated 6/1/2011. | $5,000 |
| May 18, 2007 | Completed final sign-off Aug 2007 | 1521 Golden Gate Av | Keegan Contruction Inc. | relandscape front entrance at 1521 golden gate ave. add planking. remove stucco fence and door and replace with ornamental iron gate. see drawingsDetails
relandscape front entrance at 1521 golden gate ave. add planking. remove stucco fence and door and replace with ornamental iron gate. see drawings | $8,000 |
| May 11, 2007 | Completed final sign-off Aug 2007 | 1521 Golden Gate Av | Keegan Contruction Inc. | work at cottage. remodel kitchen & bath. provide: min 50% of kitchen light wattage in flourescent lights. flourescent lights or o.s. in bathroom.Details
work at cottage. remodel kitchen & bath. provide: min 50% of kitchen light wattage in flourescent lights. flourescent lights or o.s. in bathroom. | $17,000 |
| Mar 27, 2007 | Completed final sign-off Aug 2007 | 1521 Golden Gate Av | Keegan Contruction Inc. | raise foundation by approx 12" at property line & 6" else where to ensure above grade condition. repair dry rotted mudsill. add 5/8" galvanized bolts at 32" on center. dowel # 4 rebar at 12" on center into (e) cocrete, add # 4 rebar at 8" on center horizontally where (e) foundation is too poor.Details
raise foundation by approx 12" at property line & 6" else where to ensure above grade condition. repair dry rotted mudsill. add 5/8" galvanized bolts at 32" on center. dowel # 4 rebar at 12" on center into (e) cocrete, add # 4 rebar at 8" on center horizontally where (e) foundation is too poor. | $15,000 |
| Dec 15, 2006 | Completed final sign-off Aug 2007 | 1521 Golden Gate Av | Keegan Contruction Inc. | work @ unit# b only. replace kitchen cabinets & counter in unit# b (lower unit) replace vanity in bathroom. remodel powder room. no change in (e) lighting.Details
work @ unit# b only. replace kitchen cabinets & counter in unit# b (lower unit) replace vanity in bathroom. remodel powder room. no change in (e) lighting. | $35,000 |
| Oct 24, 2006 | Completed final sign-off Aug 2007 | 1521 Golden Gate Av | Keegan Contruction Inc. | remodel two bathroom in 1521 (upper unit) no new lighting.Details
remodel two bathroom in 1521 (upper unit) no new lighting. | $15,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Keegan Contruction Inc. (5), Raymond Peng Construction (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.