Block 0106, lot 034D
40 Alta St
- City’s use
- Multi-Family Residential
- Built
- 1955
- Stories
- 3
- Units
- 6
- Rooms
- 6 bathrooms
- Building
- 3,461 sq ft
- Lot
- 1,500 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
18 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 2, 2023 | Completed final sign-off Jan 2024 | 40 Alta St | repair of wood decks at 5th & 6th level & replacement in-kind of deteriorated guardrail & replacement of wood decking boards.Details
repair of wood decks at 5th & 6th level & replacement in-kind of deteriorated guardrail & replacement of wood decking boards. | $10,000 | |
| Jul 7, 2022 | Completed final sign-off Mar 2023 | 40 Alta St | De Brus Construction Inc | revision to 201709056929. board of appeal revision: relocate column and beam to be concealed within (e) wall and (e) floor framing per notice of decicion and order of appeal # 19-137.Details
revision to 201709056929. board of appeal revision: relocate column and beam to be concealed within (e) wall and (e) floor framing per notice of decicion and order of appeal # 19-137. | $5,000 |
| Jun 17, 2022 | Expired or cancelled withdrawn Jun 2023 | 40 Alta St | Apex America Gc Inc | deck and rail repair only. less than 50%.Details
deck and rail repair only. less than 50%. | $2,000 |
| Jun 14, 2022 | Never finaled issued Jun 2022, no final | 40 Alta St | unit 5: limited demo and construction of interior partition walls. replacement of kitchen cabinets and bathroom fixtures.Details
unit 5: limited demo and construction of interior partition walls. replacement of kitchen cabinets and bathroom fixtures. | $25,000 | |
| Jun 14, 2022 | Completed final sign-off Aug 2023 | 40 Alta St | unit 3 - 3rd fl: limited demo and construction of interior partition walls. replacement of kitchen cabinets and bathroom fixtures.Details
unit 3 - 3rd fl: limited demo and construction of interior partition walls. replacement of kitchen cabinets and bathroom fixtures. | $25,000 | |
| Feb 22, 2022 | Completed final sign-off Mar 2022 | 40 Alta St | Apex America Gc Inc | to obtain a final inspection for work approved under pa 201807245436. all work is complete. this is for unit #2.Details
to obtain a final inspection for work approved under pa 201807245436. all work is complete. this is for unit #2. | |
| Jan 26, 2022 | Completed final sign-off Mar 2022 | 40 Alta St | Blue Wood Construction Inc. | replace like for like device. upgrade to a manual fire alarm system. install sounder in sleeping area to comply with sffc 1103.7.6.1. install new silent knight control unit, wireless radio communicator, smoke detector, 5 manual pull, 1 monitor module, 2 horn strobe, 12 sounder.Details
replace like for like device. upgrade to a manual fire alarm system. install sounder in sleeping area to comply with sffc 1103.7.6.1. install new silent knight control unit, wireless radio communicator, smoke detector, 5 manual pull, 1 monitor module, 2 horn strobe, 12 sounder. | $6,500 |
| Oct 14, 2021 | Completed final sign-off Mar 2022 | 40 Alta St | installation of a painted steel gate at the bldg entryway.Details
installation of a painted steel gate at the bldg entryway. | $2,000 | |
| Oct 14, 2021 | Completed final sign-off Aug 2023 | 40 Alta St | #1. limited demolition and construction of interior partition walls, replacement of existing kitchen and bathroom fixturesDetails
#1. limited demolition and construction of interior partition walls, replacement of existing kitchen and bathroom fixtures | $20,000 | |
| Sep 23, 2021 | Completed final sign-off Feb 2022 | 40 Alta St | Vazquez Roofing | reroofingDetails
reroofing | $30,000 |
| Jul 25, 2019 | Expired or cancelled withdrawn Apr 2023 | 40 Alta St | Miann Builder | remodel of entry lobby & 5th floor unit & repair of decks at the 5th & 6th floors including new access stairs. work to be done in conjunction with work under app #2018-1113-5611.Details
remodel of entry lobby & 5th floor unit & repair of decks at the 5th & 6th floors including new access stairs. work to be done in conjunction with work under app #2018-1113-5611. | $175,000 |
| Nov 13, 2018 | Expired or cancelled cancelled May 2020 | 40 Alta St | Miann Builder | removal & replacement in kind of (e) stairway, up/down direction reversed & door landing width increased by 10"Details
removal & replacement in kind of (e) stairway, up/down direction reversed & door landing width increased by 10" | $12,000 |
| Aug 15, 2018 | Expired or cancelled cancelled Nov 2018 | 40 Alta St | Miann Builder | removal and replacement in kind of (e) stairway up/dn direction reversed & door landing width increased by 10" note: the onle building egress stairway will be removed for construction. no occupants will be in building.Details
removal and replacement in kind of (e) stairway up/dn direction reversed & door landing width increased by 10" note: the onle building egress stairway will be removed for construction. no occupants will be in building. | $12,000 |
| Jul 24, 2018 | Completed final sign-off Mar 2022 | 40 Alta St | Yuco Electrical | limited demolition of interior walls, new bath and remodeled kitchen within a single dwelling unitDetails
limited demolition of interior walls, new bath and remodeled kitchen within a single dwelling unit | $20,000 |
| Sep 5, 2017 | Completed final sign-off Mar 2023 | 40 Alta St | Miann Builder | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $50,000 |
| Jan 29, 2003 | Completed final sign-off Apr 2003 | 40 Alta St | Tony Construction | remodel kitchen & bath. replace cabinet,counter top,appliance,tub,sink,toilet,new tile.Details
remodel kitchen & bath. replace cabinet,counter top,appliance,tub,sink,toilet,new tile. | $12,000 |
| Jun 5, 2002 | Expired or cancelled expired Jan 2003 | 40 Alta St | Sidney James Halter | remodel kitchen & bath in unit#5. got rooms replumbs & wire insulate rock install new cabs.no structDetails
remodel kitchen & bath in unit#5. got rooms replumbs & wire insulate rock install new cabs.no struct | $15,000 |
| Nov 20, 2001 | Completed final sign-off Mar 2002 | 40 Alta St | Tony Construction | remodel kitchen & bath replace cabinets and tile (apt. #1 and #3 only) comply w/ complaint#2001225Details
remodel kitchen & bath replace cabinets and tile (apt. #1 and #3 only) comply w/ complaint#2001225 | $20,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.