Miann Builder
- Based in
- Novato
- On San Francisco permits
- Jun 2016 to May 2025
- Last 24 months
- 2 permits filed
40 permits since 2000: 23 completed, 2 in progress, 6 never finaled, 9 expired or cancelled.
Of the 6 never-finaled permits, 3 are 3 to 5 years old, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 9, 2025 | In progress filed May 2025, not yet issued | 1357 Francisco St | unit 1357 francisco- revision 201912311108- layout changes to level 1 (ground floor) to convert portion of (e) garage into (n) gardening room and structrual components added in scope. minor interior changes to upper levels and to change orignal permit scope to remove 4th floor addition.Details
unit 1357 francisco- revision 201912311108- layout changes to level 1 (ground floor) to convert portion of (e) garage into (n) gardening room and structrual components added in scope. minor interior changes to upper levels and to change orignal permit scope to remove 4th floor addition. | |
| May 9, 2025 | In progress filed May 2025, not yet issued | 1355 Francisco St | unit 1355 francisco- revision 201912311108- layout changes to level 1 (ground floor) to convert portion of (e) garage into (n) gardening room and structrual components added in scope. minor interior changes to upper levels and to change orignal permit scope to remove 4th floor addition.Details
unit 1355 francisco- revision 201912311108- layout changes to level 1 (ground floor) to convert portion of (e) garage into (n) gardening room and structrual components added in scope. minor interior changes to upper levels and to change orignal permit scope to remove 4th floor addition. | |
| Feb 20, 2024 | Completed final sign-off May 2024 | 816 Scott St | revision to bpa# 202306150230: 2nd floor only - minor reconfiguration of (3) interior doors in non-load bearing partitions - (1) closet, (2) bedroom.Details
revision to bpa# 202306150230: 2nd floor only - minor reconfiguration of (3) interior doors in non-load bearing partitions - (1) closet, (2) bedroom. | |
| Aug 2, 2023 | Expired or cancelled withdrawn Apr 2025 | 1355 Francisco St | administrative permit for phase i of pa# 2019-1231-1108 & 2022-0603-5615, phase i scope of work: all work associated with the storage/gardening room on the ground fl. and the elevator shaft foundation work bath room, utility, sink, foundation, holdowns, shear walls & structural elementsDetails
administrative permit for phase i of pa# 2019-1231-1108 & 2022-0603-5615, phase i scope of work: all work associated with the storage/gardening room on the ground fl. and the elevator shaft foundation work bath room, utility, sink, foundation, holdowns, shear walls & structural elements | |
| Jul 27, 2023 | Completed final sign-off Dec 2023 | 255 Berry St | powder room remodel with a sink location change and electrical. kitchen remodel with no fixture changes. cabinets in kitchen are being replacedDetails
powder room remodel with a sink location change and electrical. kitchen remodel with no fixture changes. cabinets in kitchen are being replaced | $80,000 |
| Jun 15, 2023 | Completed final sign-off May 2024 | 816 Scott St | 2/f: interior reconfiguration at primary bathroom & bath 2, removal of existing wall and addition of new wall at bedroom 3 closet.Details
2/f: interior reconfiguration at primary bathroom & bath 2, removal of existing wall and addition of new wall at bedroom 3 closet. | $10,000 |
| May 23, 2023 | Completed final sign-off Jun 2023 | 615 10th Av | revision to pa# 202105251016. exterior rear deck stair removal not shown on permit drawings.Details
revision to pa# 202105251016. exterior rear deck stair removal not shown on permit drawings. | |
| Mar 28, 2023 | Never finaled issued Mar 2023, no final | 1441 Funston Av | revision to pa 2022-0714-8453 - notation of construction occuring on ground fl and 2nd fl in relation to structural work occuring on the 3rd fl (project site)Details
revision to pa 2022-0714-8453 - notation of construction occuring on ground fl and 2nd fl in relation to structural work occuring on the 3rd fl (project site) | |
| Nov 22, 2022 | Completed final sign-off Feb 2023 | 1355 Francisco St | revision to pa#201912311108-s1 and 202206035615. relocation of laundry roomDetails
revision to pa#201912311108-s1 and 202206035615. relocation of laundry room | $19,690 |
| Nov 3, 2022 | Completed final sign-off Mar 2024 | 575 19th Av | ground fl: relocate bedroom and laundryroom,add family room, fire-rate garage enclosure, add interior stairway to second fl. modify exterior doors and windows at rear. second fl: enlarge and remodel kitchen, modify two bedrooms and study, relocate bathroom, remodel powder room, change one rearDetails
ground fl: relocate bedroom and laundryroom,add family room, fire-rate garage enclosure, add interior stairway to second fl. modify exterior doors and windows at rear. second fl: enlarge and remodel kitchen, modify two bedrooms and study, relocate bathroom, remodel powder room, change one rear | $250,000 |
| Jul 14, 2022 | Completed final sign-off Aug 2023 | 1441 Funston Av | 3/f: remodel (e) kitchen/bathroom, living/dining rooms, new closet & half bath, enlarge primary suite closet, new skylight @ kitchen/living room.Details
3/f: remodel (e) kitchen/bathroom, living/dining rooms, new closet & half bath, enlarge primary suite closet, new skylight @ kitchen/living room. | $78,000 |
| Jun 3, 2022 | Never finaled issued Sep 2022, no final | 1355 Francisco St | alter site revision to pa# 201912311108/s. eliminate horizontal expansion at rear of bldg and new unit on ground fl. the building to remain as r-3 occupancy with 2 dwelling units. interior remodel per revised plans. vertical addition per original site permit.Details
alter site revision to pa# 201912311108/s. eliminate horizontal expansion at rear of bldg and new unit on ground fl. the building to remain as r-3 occupancy with 2 dwelling units. interior remodel per revised plans. vertical addition per original site permit. | |
| May 12, 2022 | Completed final sign-off Nov 2024 | 816 Scott St | 1st fl - no work; 2nd fl - no work; roof deck - removal (e) metal tube railings; addition of (n) 1/2" thick clear glass guardrails, addition of (n) siding at (e) roof; (n) outdoor lighting on walls and plantersDetails
1st fl - no work; 2nd fl - no work; roof deck - removal (e) metal tube railings; addition of (n) 1/2" thick clear glass guardrails, addition of (n) siding at (e) roof; (n) outdoor lighting on walls and planters | $10,000 |
| Mar 22, 2022 | Completed final sign-off Jun 2023 | 615 10th Av | rev to pa 202105251016 provide revised new window types at all (e) openings. remove & replace exterior siding. ground floor provide new doorway at (e) window opening. replace 2nd floor patio doors. remove (e) window in bath provide skylight + 1 hour parapet walls @ prop line adjacent to skylights asDetails
rev to pa 202105251016 provide revised new window types at all (e) openings. remove & replace exterior siding. ground floor provide new doorway at (e) window opening. replace 2nd floor patio doors. remove (e) window in bath provide skylight + 1 hour parapet walls @ prop line adjacent to skylights as | $5,000 |
| Nov 5, 2021 | Expired or cancelled withdrawn Aug 2022 | 173 Parker Av | addition of two dormers at the rear roof area; interior remodel of 2/f unit (175 parker); interior remodel of 3/f unit (173 parker); interior remodel of 4/f unit (173a parker); infill area below the existing rear mudroom.Details
addition of two dormers at the rear roof area; interior remodel of 2/f unit (175 parker); interior remodel of 3/f unit (173 parker); interior remodel of 4/f unit (173a parker); infill area below the existing rear mudroom. | $290,000 |
| Sep 23, 2021 | Expired or cancelled withdrawn Apr 2023 | 50 Alta St | reroofingDetails
reroofing | $9,000 |
| Jun 24, 2021 | Completed final sign-off Apr 2023 | 1439 Leavenworth St | to comply w/ nov 202060101: interior renovation of a single ground floor unit to include relocation of several partition walls, kitchen cabinet replacement, one new bathrom.Details
to comply w/ nov 202060101: interior renovation of a single ground floor unit to include relocation of several partition walls, kitchen cabinet replacement, one new bathrom. | $40,000 |
| May 25, 2021 | Completed final sign-off Jun 2023 | 615 10th Av | renovation and remodel existing 3 story single family home, including demolitionof (e) construction, remodeled foundation & structural/seismic framework, new walls, door and windows finishes and utility upgradesDetails
renovation and remodel existing 3 story single family home, including demolitionof (e) construction, remodeled foundation & structural/seismic framework, new walls, door and windows finishes and utility upgrades | $227,000 |
| May 19, 2021 | Completed final sign-off Aug 2023 | 50 Alta St | apt #6: limited demolition of interior partition walls. kitchen and bathrooms replacement & limited construction of new interior partition walls. no exterior workDetails
apt #6: limited demolition of interior partition walls. kitchen and bathrooms replacement & limited construction of new interior partition walls. no exterior work | $20,000 |
| Dec 31, 2019 | Never finaled issued Dec 2021, no final | 1355 Francisco St | vertical& horizontal expansion without popout rule. nfpa 13r fire sprinkler per cbc 903.3.1 shall be installed throught the second floor under separte submittal. new unit on ground floor.Details
vertical& horizontal expansion without popout rule. nfpa 13r fire sprinkler per cbc 903.3.1 shall be installed throught the second floor under separte submittal. new unit on ground floor. | $40,000 |
| Jul 26, 2019 | Completed final sign-off Aug 2019 | 1439 Leavenworth St | remove (e) roof, install new 1/2" cdx plywood with a 6x12 nailing pattern - ref pa#201907267019Details
remove (e) roof, install new 1/2" cdx plywood with a 6x12 nailing pattern - ref pa#201907267019 | $5,000 |
| Jul 26, 2019 | Completed final sign-off Aug 2019 | 1439 Leavenworth St | reroofing - ref pa#201907267019Details
reroofing - ref pa#201907267019 | $10,000 |
| Jul 25, 2019 | Expired or cancelled withdrawn Apr 2023 | 50 Alta St | remodel of entry lobby & repair of decks at the 5th & 6th floors including new access stairs. work to be done in conjunction with work under app #2018-1113-5616 & #2018-0924-1235.Details
remodel of entry lobby & repair of decks at the 5th & 6th floors including new access stairs. work to be done in conjunction with work under app #2018-1113-5616 & #2018-0924-1235. | $150,000 |
| Jul 25, 2019 | Expired or cancelled withdrawn Apr 2023 | 40 Alta St | remodel of entry lobby & 5th floor unit & repair of decks at the 5th & 6th floors including new access stairs. work to be done in conjunction with work under app #2018-1113-5611.Details
remodel of entry lobby & 5th floor unit & repair of decks at the 5th & 6th floors including new access stairs. work to be done in conjunction with work under app #2018-1113-5611. | $175,000 |
| Jul 11, 2019 | Never finaled issued Jul 2019, no final | 1439 Leavenworth St | remodel of 4 residential units on 3rd and 4th floors to include new kitchen and baths. replacement of single pane windows.Details
remodel of 4 residential units on 3rd and 4th floors to include new kitchen and baths. replacement of single pane windows. | $120,000 |
| Jun 12, 2019 | Never finaled issued Jun 2019, no final | 1439 Leavenworth St | demolition of interiior units. units 3, 4, 5, 6 remove plaster from all walls & ceilings. unit 1&2 remove plaster from kitchen and bath walls only for engineer evacuation and future remodel under sep permitDetails
demolition of interiior units. units 3, 4, 5, 6 remove plaster from all walls & ceilings. unit 1&2 remove plaster from kitchen and bath walls only for engineer evacuation and future remodel under sep permit | $5,000 |
| Nov 13, 2018 | Expired or cancelled cancelled May 2020 | 40 Alta St | removal & replacement in kind of (e) stairway, up/down direction reversed & door landing width increased by 10"Details
removal & replacement in kind of (e) stairway, up/down direction reversed & door landing width increased by 10" | $12,000 |
| Nov 13, 2018 | Expired or cancelled cancelled May 2020 | 50 Alta St | removal & replacement in kind of (e) stairway, up/down direction reversed & door landing width increased by 10"Details
removal & replacement in kind of (e) stairway, up/down direction reversed & door landing width increased by 10" | $12,000 |
| Sep 24, 2018 | Completed final sign-off Aug 2020 | 50 Alta St | unit 5. renovation of kitchen and bathroom, replacement of 2 partition walls.Details
unit 5. renovation of kitchen and bathroom, replacement of 2 partition walls. | $15,000 |
| Aug 15, 2018 | Expired or cancelled cancelled Nov 2018 | 40 Alta St | removal and replacement in kind of (e) stairway up/dn direction reversed & door landing width increased by 10" note: the onle building egress stairway will be removed for construction. no occupants will be in building.Details
removal and replacement in kind of (e) stairway up/dn direction reversed & door landing width increased by 10" note: the onle building egress stairway will be removed for construction. no occupants will be in building. | $12,000 |
| Aug 15, 2018 | Expired or cancelled cancelled Nov 2018 | 50 Alta St | removal and replacement in kind of (e) stairway up/dn direction reversed & door landing width increased by 10" note: the only building egress stairway will be removed for construction. no occupants will be in building.Details
removal and replacement in kind of (e) stairway up/dn direction reversed & door landing width increased by 10" note: the only building egress stairway will be removed for construction. no occupants will be in building. | $12,000 |
| Jun 7, 2018 | Completed final sign-off Jun 2021 | 122 11th Av | remodel of (e) ground floor to add one accessory dwelling unit per ordinance 162-16 with (1) bedroom, living room, kitchen & bath from (e) storage rms. also add mechanical room for furnaces, water heaters & add bike racks in (e) garage.Details
remodel of (e) ground floor to add one accessory dwelling unit per ordinance 162-16 with (1) bedroom, living room, kitchen & bath from (e) storage rms. also add mechanical room for furnaces, water heaters & add bike racks in (e) garage. | $80,000 |
| Feb 14, 2018 | Completed final sign-off Mar 2019 | 576 Chestnut St | to correct nov #201726552. new tempered window, bathroom work. no change of (e) layout or rough framing work. maher n/aDetails
to correct nov #201726552. new tempered window, bathroom work. no change of (e) layout or rough framing work. maher n/a | $5,000 |
| Dec 6, 2017 | Completed final sign-off Jan 2018 | 1000 Steiner St | bathroom update: new tile onfloor & tubwalls. new toilet,vanity ,sink & faucet.Details
bathroom update: new tile onfloor & tubwalls. new toilet,vanity ,sink & faucet. | $6,000 |
| Sep 5, 2017 | Completed final sign-off Mar 2023 | 40 Alta St | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $50,000 |
| Aug 29, 2017 | Completed final sign-off May 2019 | 122 11th Av | common area- soft story retrofit per sfebc chapter 4d: asce 41-06, add three shear walls & foundations.Details
common area- soft story retrofit per sfebc chapter 4d: asce 41-06, add three shear walls & foundations. | $45,000 |
| Aug 29, 2017 | Completed final sign-off Sep 2018 | 634 Clayton St | common area- soft story retrofit per sfebc chapter 4d: fema p-807, add one shear wall & foundation.Details
common area- soft story retrofit per sfebc chapter 4d: fema p-807, add one shear wall & foundation. | $25,000 |
| Aug 10, 2017 | Completed final sign-off Jan 2018 | 501 47th Av | voluntary strengthening of existing building foundationDetails
voluntary strengthening of existing building foundation | $15,000 |
| May 30, 2017 | Completed final sign-off Aug 2023 | 50 Alta St | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. steel moment frame, plywood sheer walls, foundationDetails
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. steel moment frame, plywood sheer walls, foundation | $50,000 |
| Jun 17, 2016 | Never finaled issued Jun 2020, no final | 1613 Baker St | (n) vertical 3rd story addition behind (e) parapet wall. (n) horizontal addition in rear. no work on the historical front; convert 1613-a baker into a (1) bedroom & bathroom unit; convert 1613 baker into a (5) bedroom & (3) bathroom unit.Details
(n) vertical 3rd story addition behind (e) parapet wall. (n) horizontal addition in rear. no work on the historical front; convert 1613-a baker into a (1) bedroom & bathroom unit; convert 1613 baker into a (5) bedroom & (3) bathroom unit. | $150,000 |