Back to bathroom remodel contractors
Miann Builder
- Based in
- Novato
- On San Francisco permits
- Jun 2016 to May 2025
- Last 24 months
- 2 permits filed
40 permits since 2000: 23 completed, 2 in progress, 6 never finaled, 9 expired or cancelled.
Of the 6 never-finaled permits, 3 are 3 to 5 years old, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
13 bathroom remodel permits: 9 completed, 3 never finaled, 1 expired or cancelled. Typically 17 days from filing to permit and 414 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 2, 2023 | Expired or cancelled withdrawn Apr 2025 | 1355 Francisco St | administrative permit for phase i of pa# 2019-1231-1108 & 2022-0603-5615, phase i scope of work: all work associated with the storage/gardening room on the ground fl. and the elevator shaft foundation work bath room, utility, sink, foundation, holdowns, shear walls & structural elementsDetails
administrative permit for phase i of pa# 2019-1231-1108 & 2022-0603-5615, phase i scope of work: all work associated with the storage/gardening room on the ground fl. and the elevator shaft foundation work bath room, utility, sink, foundation, holdowns, shear walls & structural elements | |
| Jun 15, 2023 | Completed final sign-off May 2024 | 816 Scott St | 2/f: interior reconfiguration at primary bathroom & bath 2, removal of existing wall and addition of new wall at bedroom 3 closet.Details
2/f: interior reconfiguration at primary bathroom & bath 2, removal of existing wall and addition of new wall at bedroom 3 closet. | $10,000 |
| Nov 3, 2022 | Completed final sign-off Mar 2024 | 575 19th Av | ground fl: relocate bedroom and laundryroom,add family room, fire-rate garage enclosure, add interior stairway to second fl. modify exterior doors and windows at rear. second fl: enlarge and remodel kitchen, modify two bedrooms and study, relocate bathroom, remodel powder room, change one rearDetails
ground fl: relocate bedroom and laundryroom,add family room, fire-rate garage enclosure, add interior stairway to second fl. modify exterior doors and windows at rear. second fl: enlarge and remodel kitchen, modify two bedrooms and study, relocate bathroom, remodel powder room, change one rear | $250,000 |
| Jul 14, 2022 | Completed final sign-off Aug 2023 | 1441 Funston Av | 3/f: remodel (e) kitchen/bathroom, living/dining rooms, new closet & half bath, enlarge primary suite closet, new skylight @ kitchen/living room.Details
3/f: remodel (e) kitchen/bathroom, living/dining rooms, new closet & half bath, enlarge primary suite closet, new skylight @ kitchen/living room. | $78,000 |
| Mar 22, 2022 | Completed final sign-off Jun 2023 | 615 10th Av | rev to pa 202105251016 provide revised new window types at all (e) openings. remove & replace exterior siding. ground floor provide new doorway at (e) window opening. replace 2nd floor patio doors. remove (e) window in bath provide skylight + 1 hour parapet walls @ prop line adjacent to skylights asDetails
rev to pa 202105251016 provide revised new window types at all (e) openings. remove & replace exterior siding. ground floor provide new doorway at (e) window opening. replace 2nd floor patio doors. remove (e) window in bath provide skylight + 1 hour parapet walls @ prop line adjacent to skylights as | $5,000 |
| May 19, 2021 | Completed final sign-off Aug 2023 | 50 Alta St | apt #6: limited demolition of interior partition walls. kitchen and bathrooms replacement & limited construction of new interior partition walls. no exterior workDetails
apt #6: limited demolition of interior partition walls. kitchen and bathrooms replacement & limited construction of new interior partition walls. no exterior work | $20,000 |
| Jul 11, 2019 | Never finaled issued Jul 2019, no final | 1439 Leavenworth St | remodel of 4 residential units on 3rd and 4th floors to include new kitchen and baths. replacement of single pane windows.Details
remodel of 4 residential units on 3rd and 4th floors to include new kitchen and baths. replacement of single pane windows. | $120,000 |
| Jun 12, 2019 | Never finaled issued Jun 2019, no final | 1439 Leavenworth St | demolition of interiior units. units 3, 4, 5, 6 remove plaster from all walls & ceilings. unit 1&2 remove plaster from kitchen and bath walls only for engineer evacuation and future remodel under sep permitDetails
demolition of interiior units. units 3, 4, 5, 6 remove plaster from all walls & ceilings. unit 1&2 remove plaster from kitchen and bath walls only for engineer evacuation and future remodel under sep permit | $5,000 |
| Sep 24, 2018 | Completed final sign-off Aug 2020 | 50 Alta St | unit 5. renovation of kitchen and bathroom, replacement of 2 partition walls.Details
unit 5. renovation of kitchen and bathroom, replacement of 2 partition walls. | $15,000 |
| Jun 7, 2018 | Completed final sign-off Jun 2021 | 122 11th Av | remodel of (e) ground floor to add one accessory dwelling unit per ordinance 162-16 with (1) bedroom, living room, kitchen & bath from (e) storage rms. also add mechanical room for furnaces, water heaters & add bike racks in (e) garage.Details
remodel of (e) ground floor to add one accessory dwelling unit per ordinance 162-16 with (1) bedroom, living room, kitchen & bath from (e) storage rms. also add mechanical room for furnaces, water heaters & add bike racks in (e) garage. | $80,000 |
| Feb 14, 2018 | Completed final sign-off Mar 2019 | 576 Chestnut St | to correct nov #201726552. new tempered window, bathroom work. no change of (e) layout or rough framing work. maher n/aDetails
to correct nov #201726552. new tempered window, bathroom work. no change of (e) layout or rough framing work. maher n/a | $5,000 |
| Dec 6, 2017 | Completed final sign-off Jan 2018 | 1000 Steiner St | bathroom update: new tile onfloor & tubwalls. new toilet,vanity ,sink & faucet.Details
bathroom update: new tile onfloor & tubwalls. new toilet,vanity ,sink & faucet. | $6,000 |
| Jun 17, 2016 | Never finaled issued Jun 2020, no final | 1613 Baker St | (n) vertical 3rd story addition behind (e) parapet wall. (n) horizontal addition in rear. no work on the historical front; convert 1613-a baker into a (1) bedroom & bathroom unit; convert 1613 baker into a (5) bedroom & (3) bathroom unit.Details
(n) vertical 3rd story addition behind (e) parapet wall. (n) horizontal addition in rear. no work on the historical front; convert 1613-a baker into a (1) bedroom & bathroom unit; convert 1613 baker into a (5) bedroom & (3) bathroom unit. | $150,000 |