Block 0106, lot 034
50 Alta St
- City’s use
- Multi-Family Residential
- Built
- 1955
- Stories
- 3
- Units
- 6
- Rooms
- 6 bathrooms
- Building
- 3,461 sq ft
- Lot
- 1,500 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
20 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 11, 2024 | Expired or cancelled suspend May 2024 | 50 Alta St | Apex America Gc Inc | replace 3 windows in kind on back of building. u factor 0.30 maxDetails
replace 3 windows in kind on back of building. u factor 0.30 max | $3,000 |
| Jul 18, 2023 | Completed final sign-off Jul 2023 | 50 Alta St | less than 30% deck repairsDetails
less than 30% deck repairs | $2,500 | |
| Jul 12, 2023 | Completed final sign-off Jan 2024 | 50 Alta St | unit# 1: revision to pa# 2021-1013-0394. update extent of sheetrock removal in unit #1 per plans. add washer/dryer.Details
unit# 1: revision to pa# 2021-1013-0394. update extent of sheetrock removal in unit #1 per plans. add washer/dryer. | ||
| Jul 12, 2023 | Never finaled issued Jul 2023, no final | 50 Alta St | unit# 3: revision to pa# 202206146348, update extent of sheetrock removal in unit #3 per plan. add washer/dryer.Details
unit# 3: revision to pa# 202206146348, update extent of sheetrock removal in unit #3 per plan. add washer/dryer. | ||
| Apr 21, 2023 | Completed final sign-off Jan 2024 | 50 Alta St | replace rotted 1x6 wood decking in-kind at the 5th & 6th level decks, & replace (e) non-code complying 36" high guardrails w/ similar code conforming 42" high horizontal steel cable guardrails & steel posts.Details
replace rotted 1x6 wood decking in-kind at the 5th & 6th level decks, & replace (e) non-code complying 36" high guardrails w/ similar code conforming 42" high horizontal steel cable guardrails & steel posts. | $15,000 | |
| Jul 7, 2022 | Completed final sign-off Aug 2023 | 50 Alta St | De Brus Construction Inc | revision to 201705307888. board of appeal revision: relocate column and beam to be concealed within (e) wall and (e) floor framing per notice of decicion and order of appeal # 19-135.Details
revision to 201705307888. board of appeal revision: relocate column and beam to be concealed within (e) wall and (e) floor framing per notice of decicion and order of appeal # 19-135. | $5,000 |
| Jun 14, 2022 | Never finaled issued Jun 2022, no final | 50 Alta St | unit 3 - 3rd fl: limited demo and construction of interior partition walls. replacement of kitchen cabinets and bathroom fixtures.Details
unit 3 - 3rd fl: limited demo and construction of interior partition walls. replacement of kitchen cabinets and bathroom fixtures. | $25,000 | |
| Jan 26, 2022 | Completed final sign-off Apr 2022 | 50 Alta St | Blue Wood Construction Inc. | replace like for like device, upgrade to a manual fire alarm system. install sounder in sleeping area to comply with sffc 1103.7.6.1. sleeping area requirement. install new silent knight control unit, wireless radio communicator 3 smoke detector, 5 maunal pull station. 1 monitor module,Details
replace like for like device, upgrade to a manual fire alarm system. install sounder in sleeping area to comply with sffc 1103.7.6.1. sleeping area requirement. install new silent knight control unit, wireless radio communicator 3 smoke detector, 5 maunal pull station. 1 monitor module, | $6,520 |
| Oct 14, 2021 | Completed final sign-off Mar 2022 | 50 Alta St | installation of a painted steel gate at the building entrywayDetails
installation of a painted steel gate at the building entryway | $2,000 | |
| Oct 13, 2021 | Completed final sign-off Jan 2024 | 50 Alta St | unit #1: limited demolition & construction of interior partition walls, replacement of existing kitchen & bathroom fixtures.Details
unit #1: limited demolition & construction of interior partition walls, replacement of existing kitchen & bathroom fixtures. | $20,000 | |
| Sep 23, 2021 | Expired or cancelled withdrawn Apr 2023 | 50 Alta St | Miann Builder | reroofingDetails
reroofing | $9,000 |
| May 19, 2021 | Completed final sign-off Aug 2023 | 50 Alta St | Miann Builder, Apex America Gc Inc | apt #6: limited demolition of interior partition walls. kitchen and bathrooms replacement & limited construction of new interior partition walls. no exterior workDetails
apt #6: limited demolition of interior partition walls. kitchen and bathrooms replacement & limited construction of new interior partition walls. no exterior work | $20,000 |
| Jul 25, 2019 | Expired or cancelled withdrawn Apr 2023 | 50 Alta St | Miann Builder | remodel of entry lobby & repair of decks at the 5th & 6th floors including new access stairs. work to be done in conjunction with work under app #2018-1113-5616 & #2018-0924-1235.Details
remodel of entry lobby & repair of decks at the 5th & 6th floors including new access stairs. work to be done in conjunction with work under app #2018-1113-5616 & #2018-0924-1235. | $150,000 |
| Nov 13, 2018 | Expired or cancelled cancelled May 2020 | 50 Alta St | Miann Builder | removal & replacement in kind of (e) stairway, up/down direction reversed & door landing width increased by 10"Details
removal & replacement in kind of (e) stairway, up/down direction reversed & door landing width increased by 10" | $12,000 |
| Sep 24, 2018 | Completed final sign-off Aug 2020 | 50 Alta St | Miann Builder | unit 5. renovation of kitchen and bathroom, replacement of 2 partition walls.Details
unit 5. renovation of kitchen and bathroom, replacement of 2 partition walls. | $15,000 |
| Aug 15, 2018 | Expired or cancelled cancelled Nov 2018 | 50 Alta St | Miann Builder | removal and replacement in kind of (e) stairway up/dn direction reversed & door landing width increased by 10" note: the only building egress stairway will be removed for construction. no occupants will be in building.Details
removal and replacement in kind of (e) stairway up/dn direction reversed & door landing width increased by 10" note: the only building egress stairway will be removed for construction. no occupants will be in building. | $12,000 |
| May 24, 2018 | Completed final sign-off Jul 2018 | 50 Alta St | Yuco Electrical | unit #5: kitchen remodeling to comply with nov #201860571Details
unit #5: kitchen remodeling to comply with nov #201860571 | $6,000 |
| May 30, 2017 | Completed final sign-off Aug 2023 | 50 Alta St | Miann Builder | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. steel moment frame, plywood sheer walls, foundationDetails
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. steel moment frame, plywood sheer walls, foundation | $50,000 |
| Apr 7, 2009 | Completed final sign-off Jun 2009 | 50 Alta St | Tony Construction Inc | work on unit#3. remodel whole kitchen + bath. new cabinets, counter, tile, tub, sink. provide min 50% of kitchen light watts in fluorescent, flurescent light or o.s in baths. kitchen -50 sqft. bath-40 sqft.Details
work on unit#3. remodel whole kitchen + bath. new cabinets, counter, tile, tub, sink. provide min 50% of kitchen light watts in fluorescent, flurescent light or o.s in baths. kitchen -50 sqft. bath-40 sqft. | $26,190 |
| Jul 12, 2004 | Completed final sign-off Oct 2004 | 50 Alta St | Tony Construction | 3/f unit #6- remodel kitchen & bathroom,no removal of walls or doors,replace floor & cabinetsDetails
3/f unit #6- remodel kitchen & bathroom,no removal of walls or doors,replace floor & cabinets | $9,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.