FiledOutcomeAddressContractorWork described on the permitDeclared cost
Aug 7, 2017Never finaled
issued Aug 2017, no final
1251 Turk Ststreet spae permit
Details
Permit
M816727
Status
issued
Filed
Aug 7, 2017
Permit issued
Aug 7, 2017
Address
1251 Turk St

street spae permit

Open the permit page

Apr 21, 2017Completed
final sign-off Nov 2018
1251 Turk StInternational Fire Incupgrade existing fire alarm system per sffc sec 1103.7.6.1 install low frequency sounders in every unit on all floors. new power supply panels and control modules on 2nd-11th fl to be supervised notification circuits and tie in to e control panel.ref# 201501165984 & 201608266044
Details
Permit
201704214599
Status
complete
Filed
Apr 21, 2017
Permit issued
Apr 21, 2017
Final sign-off
Nov 20, 2018
Declared cost
$75,000
Address
1251 Turk St

upgrade existing fire alarm system per sffc sec 1103.7.6.1 install low frequency sounders in every unit on all floors. new power supply panels and control modules on 2nd-11th fl to be supervised notification circuits and tie in to e control panel.ref# 201501165984 & 201608266044

Open the permit page

$75,000
Feb 6, 2017Never finaled
issued Feb 2017, no final
1251 Turk StRcm Fire Protection Inc.commencement of work not started under previously approved permit application #201601298339.
Details
Permit
201702068724
Status
issued
Filed
Feb 6, 2017
Permit issued
Feb 6, 2017
Declared cost
$10,000
Address
1251 Turk St

commencement of work not started under previously approved permit application #201601298339.

Open the permit page

$10,000
Feb 1, 2017Completed
final sign-off Nov 2018
1251 Turk StAccess Systems & Solutions Incinstall roof mounted and wall mounted bases on the main roof for exterior building maintenance ref 201501162685
Details
Permit
201702018386
Status
complete
Filed
Feb 1, 2017
Permit issued
Feb 2, 2017
Final sign-off
Nov 16, 2018
Declared cost
$80,000
Address
1251 Turk St

install roof mounted and wall mounted bases on the main roof for exterior building maintenance ref 201501162685

Open the permit page

$80,000
Jan 20, 2017Completed
final sign-off Nov 2018
1251 Turk StInternational Fire Incas built to app#201608266094. install monitor module to tie-in, 2 duct detectors and 2 fsd to extg control panel.install 4 strobes and 1 horn/strobe on the ground floor. replace strobes with horn/strobes in ada bathrooms.
Details
Permit
201701207565
Status
complete
Filed
Jan 20, 2017
Permit issued
Jan 20, 2017
Final sign-off
Nov 20, 2018
Declared cost
$3,000
Address
1251 Turk St

as built to app#201608266094. install monitor module to tie-in, 2 duct detectors and 2 fsd to extg control panel.install 4 strobes and 1 horn/strobe on the ground floor. replace strobes with horn/strobes in ada bathrooms.

Open the permit page

$3,000
Dec 16, 2016Completed
final sign-off Nov 2018
1251 Turk StCahill Const Service Increvision to incorporate m.o.d. approvals to pa#201511162685.
Details
Permit
201612165199
Status
complete
Filed
Dec 16, 2016
Permit issued
Dec 16, 2016
Final sign-off
Nov 16, 2018
Address
1251 Turk St

revision to incorporate m.o.d. approvals to pa#201511162685.

Open the permit page

Aug 26, 2016Completed
final sign-off Nov 2018
1251 Turk StInternational Fire Incinstall new low freq notification appliances & smk det. inside ada rms. install strobes in the bathrooms inside ada rms. install new power supply panels & modules to supervised new notification circuits & tie-in to (e) control panel located on grnd flr 201403480984 201601165984
Details
Permit
201608266094
Status
complete
Filed
Aug 26, 2016
Permit issued
Aug 26, 2016
Final sign-off
Nov 20, 2018
Declared cost
$55,000
Address
1251 Turk St

install new low freq notification appliances & smk det. inside ada rms. install strobes in the bathrooms inside ada rms. install new power supply panels & modules to supervised new notification circuits & tie-in to (e) control panel located on grnd flr 201403480984 201601165984

Open the permit page

$55,000
Apr 8, 2016Completed
final sign-off Jun 2016
1251 Turk StInternational Fire Incfire alarm as built for pa# 201501165984
Details
Permit
201604084296
Status
complete
Filed
Apr 8, 2016
Permit issued
Apr 8, 2016
Final sign-off
Jun 13, 2016
Address
1251 Turk St

fire alarm as built for pa# 201501165984

Open the permit page

Jan 29, 2016Completed
final sign-off Nov 2018
1251 Turk StRcm Fire Protection Inc.change out extg sprinkler heads for t.i. reference ti 2015.1116.2685 not issued yet.
Details
Permit
201601298339
Status
complete
Filed
Jan 29, 2016
Permit issued
Jan 29, 2016
Final sign-off
Nov 14, 2018
Declared cost
$10,000
Address
1251 Turk St

change out extg sprinkler heads for t.i. reference ti 2015.1116.2685 not issued yet.

Open the permit page

$10,000
Nov 16, 2015Completed
final sign-off Nov 2018
1251 Turk StCahill Contractors Incmohcd rad.remove/replace all(e)extr windows.provide(n)extr elastomerk paint to extr & make extr cladding repairs in-kind. provide(n)grnd fl finishes & grnd fl reconfig of(e)admin spaces. replace kitchn in-kind @ all units &(n)finises throughout unit. mech,elect & plumb upgrades.extr landscape improv
Details
Permit
201511162685
Status
complete
Filed
Nov 16, 2015
Permit issued
Nov 7, 2016
Final sign-off
Nov 16, 2018
Declared cost
$20,000,000
Address
1251 Turk St

mohcd rad.remove/replace all(e)extr windows.provide(n)extr elastomerk paint to extr & make extr cladding repairs in-kind. provide(n)grnd fl finishes & grnd fl reconfig of(e)admin spaces. replace kitchn in-kind @ all units &(n)finises throughout unit. mech,elect & plumb upgrades.extr landscape improv

Open the permit page

$20,000,000
Jan 16, 2015Completed
final sign-off Jun 2016
1251 Turk StInternational Fire Inclike for like voluntary fire alarm system replacment. replace existing fire alarm constrol unit with new at the same location. replace existing initiating notification devices with new at the same location. new modules for elevator recall to monitor existing waterflow and tamper switches
Details
Permit
201501165984
Status
complete
Filed
Jan 16, 2015
Permit issued
Jan 16, 2015
Final sign-off
Jun 13, 2016
Declared cost
$38,000
Address
1251 Turk St

like for like voluntary fire alarm system replacment. replace existing fire alarm constrol unit with new at the same location. replace existing initiating notification devices with new at the same location. new modules for elevator recall to monitor existing waterflow and tamper switches

Open the permit page

$38,000
Mar 18, 2014Never finaled
issued Mar 2014, no final
1251 Turk StCosco Fire Protection Inc.relocate 6" fire service from turk st. to webster st & install new 6" ddc. comply with cfc 2013 - fire safety chapter 33.
Details
Permit
201403180984
Status
issued
Filed
Mar 18, 2014
Permit issued
Mar 18, 2014
Declared cost
$55,000
Address
1251 Turk St

relocate 6" fire service from turk st. to webster st & install new 6" ddc. comply with cfc 2013 - fire safety chapter 33.

Open the permit page

$55,000
Jan 9, 2014Completed
final sign-off Nov 2018
1251 Turk StCahill Contractors Incconstruct temporary surface parking & temporary drop off total of 29 spaces. repairs to existing building trash room. per planning request. related to app#201207104447.
Details
Permit
201401095907
Status
complete
Filed
Jan 9, 2014
Permit issued
Jun 23, 2014
Final sign-off
Nov 15, 2018
Declared cost
$500,000
Address
1251 Turk St

construct temporary surface parking & temporary drop off total of 29 spaces. repairs to existing building trash room. per planning request. related to app#201207104447.

Open the permit page

$500,000
Feb 29, 2012Completed
final sign-off Mar 2012
1111 Buchanan StSan Francisco Fire Protectionreference app#201103182353 to this appn. is change to ref appn. eliminate monitoring by extg facp at 1251 turk. remove three relay modules from plans and change job address to 1111 buchanan street. proclam to montior system at central station. panel at 1111 buchanan will send alarm directly to centr
Details
Permit
201202295106
Status
complete
Filed
Feb 29, 2012
Permit issued
Feb 29, 2012
Final sign-off
Mar 20, 2012
Declared cost
$600
Address
1111 Buchanan St

reference app#201103182353 to this appn. is change to ref appn. eliminate monitoring by extg facp at 1251 turk. remove three relay modules from plans and change job address to 1111 buchanan street. proclam to montior system at central station. panel at 1111 buchanan will send alarm directly to centr

Open the permit page

$600
Feb 14, 2012Expired or cancelled
withdrawn Nov 2018
1251 Turk Stremove & replace existing domestic hot water heaters & cogeneration unit installed in same locations and weigh less.
Details
Permit
201202144148
Status
withdrawn
Filed
Feb 14, 2012
Declared cost
$350,000
Address
1251 Turk St

remove & replace existing domestic hot water heaters & cogeneration unit installed in same locations and weigh less.

Open the permit page

$350,000
Aug 1, 2011Never finaled
issued Aug 2011, no final
1111 Buchanan StD & S Leong Associatesinstall 9 heads in new hallway on ground floor only.
Details
Permit
201108011434
Status
issued
Filed
Aug 1, 2011
Permit issued
Aug 1, 2011
Declared cost
$5,000
Address
1111 Buchanan St

install 9 heads in new hallway on ground floor only.

Open the permit page

$5,000
Mar 18, 2011Completed
final sign-off Mar 2012
1251 Turk StSan Francisco Fire Protectioninstall 1 fire panel, 1 annunuator, 17 notification devices, 7 manual pulls & 27 smoke detectors
Details
Permit
201103182353
Status
complete
Filed
Mar 18, 2011
Permit issued
Mar 21, 2011
Final sign-off
Mar 6, 2012
Declared cost
$18,000
Address
1251 Turk St

install 1 fire panel, 1 annunuator, 17 notification devices, 7 manual pulls & 27 smoke detectors

Open the permit page

$18,000
Sep 10, 2010Never finaled
issued Dec 2010, no final
1251 Turk StTransworld Constructionenclosed walkay addition, elevator upgrades, exterior (n) ramp and walkways, lighting and landscaping. note: see pa #2010-0629-5562 for related work on the senior center (1111 buchanan st.) that share the same set of drawings.
Details
Permit
201009100604
Status
issued
Filed
Sep 10, 2010
Permit issued
Dec 2, 2010
Declared cost
$212,500
Address
1251 Turk St

enclosed walkay addition, elevator upgrades, exterior (n) ramp and walkways, lighting and landscaping. note: see pa #2010-0629-5562 for related work on the senior center (1111 buchanan st.) that share the same set of drawings.

Open the permit page

$212,500
Jun 29, 2010Never finaled
issued Dec 2010, no final
1111 Buchanan StTransworld Constructionexterior paint, replace all windows/doors. (n) site access gate, exterior ramp/walkways, landscape. interior ada upgrades to (e) bathrooms, (n) accessible toilet rooms, interior renovation. see pa #2010-0910-0604 for related work on senior housing (1251 turk st.) that share same set of drwgs.
Details
Permit
201006295562
Status
issued
Filed
Jun 29, 2010
Permit issued
Dec 2, 2010
Declared cost
$1,941,237
Address
1111 Buchanan St

exterior paint, replace all windows/doors. (n) site access gate, exterior ramp/walkways, landscape. interior ada upgrades to (e) bathrooms, (n) accessible toilet rooms, interior renovation. see pa #2010-0910-0604 for related work on senior housing (1251 turk st.) that share same set of drwgs.

Open the permit page

$1,941,237

Find contractors for work like this