Block 4058, lot 010
2255 03rd St
- City’s use
- Multi-Family Residential
- Built
- 2013
- Stories
- 7
- Units
- 202
- Building
- 157,256 sq ft
- Lot
- 50,000 sq ft
- Zoning
- M2
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
72 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 9, 2024 | Completed final sign-off Nov 2024 | 2255 03rd St | Meylan Construction | ceiling and lighting improvements to existing interior lower fl (basement) space. area of work apprx 2395 sfDetails
ceiling and lighting improvements to existing interior lower fl (basement) space. area of work apprx 2395 sf | $50,260 |
| Jul 14, 2022 | Completed final sign-off Jan 2024 | 2225 03rd St | Mackie Builder | base building improvement of interior renovation a (e) ground fl space for future tenant. change of use from professional service to labortory use. (n) wall to make one rm.Details
base building improvement of interior renovation a (e) ground fl space for future tenant. change of use from professional service to labortory use. (n) wall to make one rm. | $60,000 |
| Jun 9, 2022 | Never finaled issued Jun 2022, no final | 2245 03rd St | Allen Beverage And Stainless Service Llc | revision to pa 2022-0331-1282 relocation of brewing equipment from locations shown on permitDetails
revision to pa 2022-0331-1282 relocation of brewing equipment from locations shown on permit | |
| Mar 31, 2022 | Never finaled issued May 2022, no final | 2245 03rd St | Allen Beverage And Stainless Service Llc | current space is a vacant brewery, minus the equipment. we intend to reinstall the equipment, some light reapirs to cold box, and update plumbing and electrical.(olfactory inc.) (ref pa#) 2013-0703-1087Details
current space is a vacant brewery, minus the equipment. we intend to reinstall the equipment, some light reapirs to cold box, and update plumbing and electrical.(olfactory inc.) (ref pa#) 2013-0703-1087 | $125,000 |
| Feb 25, 2022 | Never finaled filed Feb 2022, never issued | 2255 03rd St | Meylan Construction | change of use type b occ to type e for 2-8 school. new accessible women's restroom @ lower level. remodel (e) restroom, (n) plumbing fixtures, drinking fountain/bottle filler. relocate kitchenette. mech/fire life safety system will be modified as needed.Details
change of use type b occ to type e for 2-8 school. new accessible women's restroom @ lower level. remodel (e) restroom, (n) plumbing fixtures, drinking fountain/bottle filler. relocate kitchenette. mech/fire life safety system will be modified as needed. | $150,000 |
| Dec 16, 2020 | Never finaled filed Dec 2020, never issued | 2265 03rd St | Novo Construction Inc | new case work, new grab bars in bathroom, 1 boys urinalDetails
new case work, new grab bars in bathroom, 1 boys urinal | $45,000 |
| Apr 19, 2019 | Expired or cancelled cancelled Jan 2026 | 2225 03rd St | Acco Engineered Systems Inc. Dba Acco En | install 1 ton split a/c system in idf room | $8,000 |
| Apr 29, 2016 | Completed final sign-off Jul 2016 | 2265 03rd St | Siemens Industry, Inc. | 1/f: fire alarm work to add a fire drill pull station for the school area only per requirements of the sffd. maher naDetails
1/f: fire alarm work to add a fire drill pull station for the school area only per requirements of the sffd. maher na | $610 |
| Jan 6, 2015 | Completed final sign-off Jan 2015 | 2255 03rd St | Platinum Roofing Inc | reroofingDetails
reroofing | $38,249 |
| Jul 3, 2014 | Never finaled issued Jul 2014, no final | 2225 03rd St | D B H Construction | install gate at rear of alley way.Details
install gate at rear of alley way. | $200 |
| May 29, 2014 | Expired or cancelled cancelled Jan 2026 | 2225 03rd St | convert extg 1st floor retail coffee counter into a cafe. extg lighting and mechanical system to remain. maher-compliance with ordinance no. 155-13.Details
convert extg 1st floor retail coffee counter into a cafe. extg lighting and mechanical system to remain. maher-compliance with ordinance no. 155-13. | $90,000 | |
| May 12, 2014 | Completed final sign-off Jun 2014 | 2255 03rd St | O'connor Plumbing & Fire Protection | basement & 1st floor as builts fire sprinklers to pa #2014.0228.9594. due to additional walls and drop ceiling in bathroom, basement & 1st floor.Details
basement & 1st floor as builts fire sprinklers to pa #2014.0228.9594. due to additional walls and drop ceiling in bathroom, basement & 1st floor. | |
| Apr 25, 2014 | Completed final sign-off Jun 2014 | 2255 03rd St | International Fire Inc | tenant improvement in the basement and gr floors. 2 ndw horn/strobes and 1 new strobe installed. 1 existing horn/strobe relocated. new devies tied to existing control panel. ref 201403120574. b/a ordinance #155-13Details
tenant improvement in the basement and gr floors. 2 ndw horn/strobes and 1 new strobe installed. 1 existing horn/strobe relocated. new devies tied to existing control panel. ref 201403120574. b/a ordinance #155-13 | $1,000 |
| Mar 12, 2014 | Completed final sign-off Jun 2014 | 2255 03rd St | Martin Building Co | interior commercial tenant improvement. remove non structural partitions and reconfigure with new non structural partitions. add unisex restroom, utility closet and small training room. na ordinance #155-13Details
interior commercial tenant improvement. remove non structural partitions and reconfigure with new non structural partitions. add unisex restroom, utility closet and small training room. na ordinance #155-13 | $50,000 |
| Feb 28, 2014 | Completed final sign-off Mar 2014 | 2255 03rd St | O'connor Plumbing & Fire Protection | add 3 new sprinkler heads & relocate 6 existing heads due ot new walls in basement, relcoate 6 heads on 1st floor due to new walls & duct work. ref pa #2014.0129.7363. compliance with ordinance #155-13 not requiredDetails
add 3 new sprinkler heads & relocate 6 existing heads due ot new walls in basement, relcoate 6 heads on 1st floor due to new walls & duct work. ref pa #2014.0129.7363. compliance with ordinance #155-13 not required | $2,500 |
| Feb 21, 2014 | Completed final sign-off Mar 2014 | 2255 03rd St | International Fire Inc | due to the interior ti in commercial unit in the basement and on gr fl, new notification appliances will be install throughout floor area. new and existing devices will be tie in to existing control panel.Details
due to the interior ti in commercial unit in the basement and on gr fl, new notification appliances will be install throughout floor area. new and existing devices will be tie in to existing control panel. | $2,800 |
| Jan 30, 2014 | Expired or cancelled cancelled Jan 2026 | 2225 03rd St | Bay City Mechanical Inc | replace 100 feet of extg duct work. relocate 12 registers. n/a for the maher ordinance #155-13Details
replace 100 feet of extg duct work. relocate 12 registers. n/a for the maher ordinance #155-13 | $20,000 |
| Jan 29, 2014 | Completed final sign-off Mar 2014 | 2255 03rd St | Martin Building Co | interior non structural t.i. and finishes to ground level and basement of extg brick one story and basement portion. n/ a for maher ordinance #155-13Details
interior non structural t.i. and finishes to ground level and basement of extg brick one story and basement portion. n/ a for maher ordinance #155-13 | $10,000 |
| Jan 15, 2014 | Never finaled issued Jan 2014, no final | 2245 03rd St | International Fire Inc | to change the address from 2235 3rd st to 2245 3rd st application: 201312063543 and 201312033235- field verify physical address and occupancies; compliance with ord 15-133 not requiredDetails
to change the address from 2235 3rd st to 2245 3rd st application: 201312063543 and 201312033235- field verify physical address and occupancies; compliance with ord 15-133 not required | $1,000 |
| Dec 24, 2013 | Completed final sign-off Jan 2014 | 2225 03rd St | International Fire Inc | due to the interior tenant improvement in commercial unit on ground & mezz floor in fully sprinkled bldg. 4 horn/strobes & 4 strobes will be install thru-out the floor area. new devices will be tie-in to existing control panel located in the parking garage on level 2. ti pa# 201311222640Details
due to the interior tenant improvement in commercial unit on ground & mezz floor in fully sprinkled bldg. 4 horn/strobes & 4 strobes will be install thru-out the floor area. new devices will be tie-in to existing control panel located in the parking garage on level 2. ti pa# 201311222640 | $2,100 |
| Dec 6, 2013 | Completed final sign-off Jan 2014 | 2235 03rd St | International Fire Inc | due to interior t.i. in commercial unit on 1st floor in fully sprinklered bldg, on extg horn/strobe will be relocate to new location and 2 new horn/strobes will be install. new and extg devices will be tie-in to extg control panel located in the parking garage on level 2. t.i. app# 201307031087Details
due to interior t.i. in commercial unit on 1st floor in fully sprinklered bldg, on extg horn/strobe will be relocate to new location and 2 new horn/strobes will be install. new and extg devices will be tie-in to extg control panel located in the parking garage on level 2. t.i. app# 201307031087 | $1,000 |
| Dec 3, 2013 | Completed final sign-off Jan 2014 | 2235 03rd St | International Fire Inc | install 6 upright sprinkler head & pipings, install 2 dry pendent to walk in cooler, install 2 sidewall sprinkler to existing bathroom. t.i. pa# 201307031087Details
install 6 upright sprinkler head & pipings, install 2 dry pendent to walk in cooler, install 2 sidewall sprinkler to existing bathroom. t.i. pa# 201307031087 | $4,000 |
| Nov 26, 2013 | Completed final sign-off May 2014 | 2245 03rd St | C D R Construction | erect non illumination double faced projecting signDetails
erect non illumination double faced projecting sign | $500 |
| Nov 25, 2013 | Completed final sign-off May 2014 | 2245 03rd St | C D R Construction | open seperate permit since address has been update to obtain sign offs. for 2245 as a revision to permit app#201307031087.Details
open seperate permit since address has been update to obtain sign offs. for 2245 as a revision to permit app#201307031087. | |
| Nov 22, 2013 | Completed final sign-off Feb 2014 | 2225 03rd St | Martin Building Co | interior commercial tenant improvements. new non bearing partitons, millwork, intergrated light system. mech, elec, plumbing for small kitchenette. new security and low voltage system. work on 3-story portion plus basement of existing building. mep, life safety sep. permitsDetails
interior commercial tenant improvements. new non bearing partitons, millwork, intergrated light system. mech, elec, plumbing for small kitchenette. new security and low voltage system. work on 3-story portion plus basement of existing building. mep, life safety sep. permits | $15,000 |
| Oct 10, 2013 | Completed final sign-off Oct 2013 | 2265 03rd St | Bbc Construction Inc. | to correct adderss on permit # 201308235143 & 201309045930, from 2255 03rd st. to 2265 03rd st.Details
to correct adderss on permit # 201308235143 & 201309045930, from 2255 03rd st. to 2265 03rd st. | |
| Sep 27, 2013 | Completed final sign-off Oct 2013 | 2265 03rd St | Siemens Industry, Inc. | revision to the fire alarm drawing to reflect the "as-built" device address changes for the "alternative school" remodel on floor 1. this "as-built" permit was requested by the sffd testing inspector for the original fire alar work under pa 201309247540Details
revision to the fire alarm drawing to reflect the "as-built" device address changes for the "alternative school" remodel on floor 1. this "as-built" permit was requested by the sffd testing inspector for the original fire alar work under pa 201309247540 | |
| Sep 24, 2013 | Completed final sign-off Oct 2013 | 2265 03rd St | Siemens Industry, Inc. | addition of 5 smoke detectors, 3 relay modules, 1 speaker/strove, add 1 strobe for the "alternative school" remodel on floor 1. all new devices connect onto the fire alarm systemDetails
addition of 5 smoke detectors, 3 relay modules, 1 speaker/strove, add 1 strobe for the "alternative school" remodel on floor 1. all new devices connect onto the fire alarm system | $5,000 |
| Sep 9, 2013 | Never finaled issued Sep 2013, no final | 2245 03rd St | add two addresses for retail on g/f, block 4058, lot 010 as; 2245, 2265 3rd street.Details
add two addresses for retail on g/f, block 4058, lot 010 as; 2245, 2265 3rd street. | ||
| Sep 4, 2013 | Completed final sign-off Oct 2013 | 2255 03rd St | Bbc Construction Inc. | electrical, hvac, plumbing plans for 201308235143Details
electrical, hvac, plumbing plans for 201308235143 | |
| Aug 29, 2013 | Completed final sign-off Sep 2013 | 2255 03rd St | Cisco Fire Sprinklers, Inc. | add 13 new pendent sprinklers to existing fire sprinkler systemDetails
add 13 new pendent sprinklers to existing fire sprinkler system | $5,000 |
| Aug 23, 2013 | Completed final sign-off Oct 2013 | 2255 03rd St | Bbc Construction Inc. | tenant improvement for new private elementary school k-5. one storage room, acoustic ceiling, finishes, outlets & switches. deferred permits fo rhvac, electr, sprinkler & fire alarm.Details
tenant improvement for new private elementary school k-5. one storage room, acoustic ceiling, finishes, outlets & switches. deferred permits fo rhvac, electr, sprinkler & fire alarm. | $75,000 |
| Jul 3, 2013 | Completed final sign-off May 2014 | 2225 03rd St | C D R Construction | interior tenant improvement, construction of interior space & finishes up to tenant leaseline. install walls, ceiling, plumbing, electrical & mech systems. install brewing equipment & operate smakll beer manufacture. fire sprinkler under seperate permit.Details
interior tenant improvement, construction of interior space & finishes up to tenant leaseline. install walls, ceiling, plumbing, electrical & mech systems. install brewing equipment & operate smakll beer manufacture. fire sprinkler under seperate permit. | $75,000 |
| Oct 12, 2012 | Completed final sign-off Nov 2012 | 2235 03rd St | Edward W. Scott | 3rd floor-additional devices added to fire alarm pa# 2011-0921-5196-missing devices for fire alarm system. add 5 horn/strobes, 1 strobe, 1 smoke detector & 1 heat detectorDetails
3rd floor-additional devices added to fire alarm pa# 2011-0921-5196-missing devices for fire alarm system. add 5 horn/strobes, 1 strobe, 1 smoke detector & 1 heat detector | $500 |
| Oct 2, 2012 | Never finaled issued Oct 2012, no final | 810 Illinois St | Eagle Bay Enterprises, Inc (Dba Garnett | fabricate and install evacuation plans. daycare only.Details
fabricate and install evacuation plans. daycare only. | $1,500 |
| Sep 26, 2012 | Never finaled issued Oct 2012, no final | 2235 03rd St | Nibbi Bros Assoc Inc. | per dbi inspection notice of 6/12/12 and 9/8/12:adaptable pulls at inerior unit barn and closet doors(bedroom side only).2)adaptable ramps at sliding doors to be installed at tenant request at 1:12 max slope at interior side. 3)mitigate top of planter wall sharp edges. add rubber tubing.Details
per dbi inspection notice of 6/12/12 and 9/8/12:adaptable pulls at inerior unit barn and closet doors(bedroom side only).2)adaptable ramps at sliding doors to be installed at tenant request at 1:12 max slope at interior side. 3)mitigate top of planter wall sharp edges. add rubber tubing. | |
| Sep 20, 2012 | Never finaled issued Sep 2012, no final | 2235 03rd St | street space | ||
| Jul 20, 2012 | Never finaled issued Jul 2012, no final | 2235 03rd St | street space permit | ||
| Jun 1, 2012 | Never finaled issued Jun 2012, no final | 2235 03rd St | Eagle Bay Enterprises, Inc (Dba Garnett | reference app#200907092309. fabricate and install evacucation signs for floors p1- roof. does not include retail and daycare space. 73 signsDetails
reference app#200907092309. fabricate and install evacucation signs for floors p1- roof. does not include retail and daycare space. 73 signs | $14,600 |
| May 18, 2012 | Completed final sign-off Aug 2013 | 2235 03rd St | Nibbi Bros Assoc Inc. | provide spa on roof deck shown on issued site permit and final addenda drawing pa# 2011/04/08/3762.Details
provide spa on roof deck shown on issued site permit and final addenda drawing pa# 2011/04/08/3762. | |
| Feb 22, 2012 | Completed final sign-off Apr 2013 | 2235 03rd St | Nibbi Bros Assoc Inc. | interior build out of childcare space including classrooms, restrms, kitchen, office, conference rm and break rm spaces. this also includ construtn of exterior space for a paved exit path grassed area. ref. to approved #200907092309.Details
interior build out of childcare space including classrooms, restrms, kitchen, office, conference rm and break rm spaces. this also includ construtn of exterior space for a paved exit path grassed area. ref. to approved #200907092309. | |
| Jan 19, 2012 | Never finaled issued Jan 2012, no final | 2235 03rd St | street space | ||
| Nov 30, 2011 | Never finaled issued Nov 2011, no final | 810 Illinois St | add address per pa #200907092309. 810 illinois st for child care center. 820 illinois st for fire exit of apartments.Details
add address per pa #200907092309. 810 illinois st for child care center. 820 illinois st for fire exit of apartments. | ||
| Oct 14, 2011 | Never finaled issued Dec 2011, no final | 2235 03rd St | Nibbi Bros Assoc Inc. | structural light gauge framing for: pa# 2009/07/09/2309 (issued) merge 2 historical bldg & change of occupancy. pa# 2011/04/08/3762 (under review).Details
structural light gauge framing for: pa# 2009/07/09/2309 (issued) merge 2 historical bldg & change of occupancy. pa# 2011/04/08/3762 (under review). | |
| Sep 21, 2011 | Completed final sign-off Nov 2012 | 2235 03rd St | Edward W. Scott | new fire alarm system for entire building. reference pa# 2009/07/09/2309.Details
new fire alarm system for entire building. reference pa# 2009/07/09/2309. | $50,000 |
| Jul 14, 2011 | Never finaled issued Jul 2011, no final | 2235 03rd St | street space permit (200907092309 | ||
| Jul 12, 2011 | Never finaled issued Oct 2011, no final | 2235 03rd St | Cisco Fire Sprinklers, Inc. | fire sprinkler systems throughout described building, and new 6-inch fire service. 3,040 sprinklers.Details
fire sprinkler systems throughout described building, and new 6-inch fire service. 3,040 sprinklers. | $680,000 |
| Apr 8, 2011 | Completed final sign-off Dec 2012 | 2225 03rd St | Nibbi Bros Assoc Inc. | rev to pa# 2009/07/09/2309 from 2007 cbc to 2010 cbc; eleminate rescue window requirement @ 1st-3rd level. reconfiguration of a sleeping area to locate barn door on portal side of sleeping area. reconfiguration of master bedrm in 2 bedrm units to have a 3'-9" hinged door & remaining wall to be 50%Details
rev to pa# 2009/07/09/2309 from 2007 cbc to 2010 cbc; eleminate rescue window requirement @ 1st-3rd level. reconfiguration of a sleeping area to locate barn door on portal side of sleeping area. reconfiguration of master bedrm in 2 bedrm units to have a 3'-9" hinged door & remaining wall to be 50% | |
| Dec 14, 2010 | Completed final sign-off Nov 2012 | 2235 03rd St | Nibbi Bros Assoc Inc. | erection and operation of tower crane located on jobsite per ab 023. ref arch 200907092309. foundation work for tower crane only under this permit.Details
erection and operation of tower crane located on jobsite per ab 023. ref arch 200907092309. foundation work for tower crane only under this permit. | $76,782 |
| Nov 19, 2010 | Completed final sign-off Nov 2012 | 2225 03rd St | Nibbi Bros Assoc Inc. | remove and dispose of approx. 2,000 tons of soil. no building work. pa# 2009.09.08.6370 for referenceDetails
remove and dispose of approx. 2,000 tons of soil. no building work. pa# 2009.09.08.6370 for reference | $6,000 |
| Nov 18, 2009 | Completed final sign-off Apr 2010 | 2235 03rd St | Clear Channel Outdoor | the owner of general advertising sign located at 2225 3rd street, clear channel outdoor inc will remove this sign voluntaryDetails
the owner of general advertising sign located at 2225 3rd street, clear channel outdoor inc will remove this sign voluntary | $5,000 |
| Sep 8, 2009 | Completed final sign-off Mar 2010 | 2225 03rd St | Martin Building Co | remove and dispose of contaminated soil. no building work under this permit. approx 15,000 tons. 9,259 cy of soil excavation. shoring under separate permit.Details
remove and dispose of contaminated soil. no building work under this permit. approx 15,000 tons. 9,259 cy of soil excavation. shoring under separate permit. | $45,000 |
| Aug 12, 2009 | Completed final sign-off Nov 2012 | 2225 03rd St | underpinning of on site buildings & on site shoring - related work 2255 - 3rd street under separate permit.Details
underpinning of on site buildings & on site shoring - related work 2255 - 3rd street under separate permit. | $25,000 | |
| Aug 12, 2009 | Completed final sign-off Nov 2012 | 2255 03rd St | underpinnig of on site building and on site shoring-related work 2225 - 3rd st. under separate permit canti lever sounder beam shoring on site. soldier beams with tiebacks @ illinois frontage.Details
underpinnig of on site building and on site shoring-related work 2225 - 3rd st. under separate permit canti lever sounder beam shoring on site. soldier beams with tiebacks @ illinois frontage. | $75,000 | |
| Jul 9, 2009 | Completed final sign-off Aug 2013 | 2255 03rd St | Nibbi Bros Assoc Inc. | preserve, renovate and merge two historical bldg at 2225 and 2255 third st located on same lot into one structure with the address of 2235 third st by constructing 2 levels of prkg, ground fl commercial, storage, day care and 196 res.units.Details
preserve, renovate and merge two historical bldg at 2225 and 2255 third st located on same lot into one structure with the address of 2235 third st by constructing 2 levels of prkg, ground fl commercial, storage, day care and 196 res.units. | $12,000,000 |
| Jun 30, 2009 | Completed final sign-off Oct 2009 | 2235 03rd St | Clear Channel Outdoor | owner of general advertising jr. panel signs located at 2235-3rd. st., clear channel outdoor inc. will remove the (2) jr. panels voluntary.Details
owner of general advertising jr. panel signs located at 2235-3rd. st., clear channel outdoor inc. will remove the (2) jr. panels voluntary. | $1,000 |
| Jun 2, 2003 | Never finaled issued Jun 2003, no final | 2225 03rd St | revision to apprvd bldng permit app 200009291972-new entry door-handicap accessible w/new non-load bDetails
revision to apprvd bldng permit app 200009291972-new entry door-handicap accessible w/new non-load b | $3,500 | |
| Aug 29, 2002 | Never finaled issued Aug 2002, no final | 2225 03rd St | renew expired permits 2000/03/09/3974 & 2000/09/29/1972 for final inspection - (n) entry & new bathrDetails
renew expired permits 2000/03/09/3974 & 2000/09/29/1972 for final inspection - (n) entry & new bathr | $5,000 | |
| Mar 20, 2002 | Expired or cancelled expired Sep 2002 | 2225 03rd St | renew expired permit app 200012087605-work is to install two (n) exit stairways between basDetails
renew expired permit app 200012087605-work is to install two (n) exit stairways between bas | $25,000 | |
| Feb 12, 2002 | Expired or cancelled expired Aug 2002 | 2225 03rd St | renew 2000/03/09/3974 & 2000/09/29/1972. for final inspection only.Details
renew 2000/03/09/3974 & 2000/09/29/1972. for final inspection only. | $20,000 | |
| Feb 5, 2002 | Expired or cancelled cancelled Nov 2024 | 2225 03rd St | renew permits 200003093974, 200009291972 for final inspection onlyDetails
renew permits 200003093974, 200009291972 for final inspection only | ||
| Feb 21, 2001 | Completed final sign-off Mar 2001 | 2255 03rd St | new hvac for officeDetails
new hvac for office | $10,000 | |
| Dec 8, 2000 | Expired or cancelled expired Jul 2001 | 2225 03rd St | install two (n) exit stairways between basements & third floorsDetails
install two (n) exit stairways between basements & third floors | $25,000 | |
| Dec 6, 2000 | Expired or cancelled withdrawn Dec 2000 | 2235 03rd St | install 2 exit stairways between basement and third floorDetails
install 2 exit stairways between basement and third floor | $25,000 | |
| Dec 6, 2000 | Expired or cancelled cancelled Oct 2024 | 2235 03rd St | install 2 exit stairways between basement and third floorDetails
install 2 exit stairways between basement and third floor | $25,000 | |
| Nov 8, 2000 | Expired or cancelled expired Nov 2001 | 2225 03rd St | install (n) accessible entry with (n) restrooms on ground & 2nd flrs (lighting & mechanical under seDetails
install (n) accessible entry with (n) restrooms on ground & 2nd flrs (lighting & mechanical under se | $70,000 | |
| Sep 29, 2000 | Completed final sign-off Jun 2003 | 2225 03rd St | Basec | structural changes per rev (1), chord strap secondary support, raise roof beams, angle & strapDetails
structural changes per rev (1), chord strap secondary support, raise roof beams, angle & strap | |
| Aug 4, 2000 | Completed final sign-off Mar 2001 | 2255 03rd St | lower entry vestibule for accessibility compliance & ramp to grd fl, install entry door, & stairsDetails
lower entry vestibule for accessibility compliance & ramp to grd fl, install entry door, & stairs | $22,000 | |
| Jul 7, 2000 | Completed final sign-off Mar 2001 | 2255 03rd St | install 2 new compliant restrms at grnd levelDetails
install 2 new compliant restrms at grnd level | $9,875 | |
| Apr 12, 2000 | Completed final sign-off Mar 2001 | 2255 03rd St | Basec | retrofit of unreinforced masonry bldgDetails
retrofit of unreinforced masonry bldg | $60,000 |
| Mar 9, 2000 | Completed final sign-off Jun 2003 | 2225 03rd St | Basec | seismic retrofit of unreinforced masonryDetails
seismic retrofit of unreinforced masonry | $55,000 |
| Jan 28, 2000 | Expired or cancelled expired Feb 2001 | 2255 03rd St | seismic retrofit of unreinforced masonry buildingDetails
seismic retrofit of unreinforced masonry building | $40,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Nibbi Bros Assoc Inc. (8), International Fire Inc (6), Martin Building Co (4), Basec (3), Bbc Construction Inc. (3), C D R Construction (3), Siemens Industry, Inc. (3), Allen Beverage And Stainless Service Llc (2), Cisco Fire Sprinklers, Inc. (2), Clear Channel Outdoor (2), Eagle Bay Enterprises, Inc (Dba Garnett (2), Edward W. Scott (2), Meylan Construction (2), O'connor Plumbing & Fire Protection (2), Acco Engineered Systems Inc. Dba Acco En, Bay City Mechanical Inc, D B H Construction, Mackie Builder, Novo Construction Inc, Platinum Roofing Inc
- Architects
- Stephen Macmilan (5), Brendan D. Dunningan (3), Pauline Souza (2), David Seidel, Marc Dimalanta, Simon Kwan
- Engineers
- Alexander Joseph Pacheco, Allan Schoener, Kevin Menninger