Pauline Souza
- License
- C24532
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- Firm
- Wrbs Studio
- Based in
- San Francisco
- On San Francisco permits
- Apr 2018 to Jan 2023
6 permits since 2000 (architect on 6 permits): 4 completed, 2 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Plant Construction Co, Lp (2), Meylan Construction, Novo Construction Inc, Skyline Construction
- Engineers
- Rodolfo Bustos Iii (2), Stephen Shafter (2), Carl Milsum
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 1
- Commercial 0
- Other or unknown 5
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 18, 2023 | Completed final sign-off Nov 2023 | 838 Kearny St | Plant Construction Co, Lp | revision to pa#202102174826. scope of work includes closure of extg exit to ils alley and use of ext exit to gibbs lane and new storage space at gym. all lower levelDetails
revision to pa#202102174826. scope of work includes closure of extg exit to ils alley and use of ext exit to gibbs lane and new storage space at gym. all lower level | |
| Feb 25, 2022 | Never finaled filed Feb 2022, never issued | 2255 03rd St | Meylan Construction | change of use type b occ to type e for 2-8 school. new accessible women's restroom @ lower level. remodel (e) restroom, (n) plumbing fixtures, drinking fountain/bottle filler. relocate kitchenette. mech/fire life safety system will be modified as needed.Details
change of use type b occ to type e for 2-8 school. new accessible women's restroom @ lower level. remodel (e) restroom, (n) plumbing fixtures, drinking fountain/bottle filler. relocate kitchenette. mech/fire life safety system will be modified as needed. | $150,000 |
| Feb 18, 2022 | Completed final sign-off Mar 2022 | 838 Kearny St | remove and replacement of (e) 42in tall code compliant guardrails at levels 3 & 4 egress balconies with new compliant, 7ft tall painted stell guardrails.Details
remove and replacement of (e) 42in tall code compliant guardrails at levels 3 & 4 egress balconies with new compliant, 7ft tall painted stell guardrails. | $120,000 | |
| Feb 17, 2021 | Completed final sign-off Nov 2023 | 838 Kearny St | Plant Construction Co, Lp | project comprises of the interior fit out of the basement floor including 1 new gymnasium, 3 new classrooms and 2 new student restrooms.Details
project comprises of the interior fit out of the basement floor including 1 new gymnasium, 3 new classrooms and 2 new student restrooms. | $3,000,000 |
| Dec 16, 2020 | Never finaled filed Dec 2020, never issued | 2265 03rd St | Novo Construction Inc | new case work, new grab bars in bathroom, 1 boys urinalDetails
new case work, new grab bars in bathroom, 1 boys urinal | $45,000 |
| Apr 11, 2018 | Completed final sign-off Sep 2018 | 838 Kearny St | Skyline Construction | complete 3 new clasrooms and 3 offices on third floor and 2 new class rooms and 1 single occupancy restroom on the 4th floor. n/a maher. complete buildout under previous permit with modifications.Details
complete 3 new clasrooms and 3 offices on third floor and 2 new class rooms and 1 single occupancy restroom on the 4th floor. n/a maher. complete buildout under previous permit with modifications. | $150,000 |