55 permits since 2000 (engineer on 55 permits): 43 completed, 4 in progress, 5 never finaled, 3 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jun 29, 2026In progress
filed Jun 2026, not yet issued
750 Phelps StBattalion One Fire Protectionproj-26-0640. sep 940. renovation of (e) office space in two-story public works maintenance bldg. modify & relocate (e) sprinklers for new walls & ceiling layout for 4,367sf office space on lvl 1 & 5,585sf office space on lvl 2. remove sprinklers at top & bottom of (e) freight elevator installation.
Details
Permit
202606102962
Status
filed
Filed
Jun 29, 2026
Declared cost
$93,000
Address
750 Phelps St

proj-26-0640. sep 940. renovation of (e) office space in two-story public works maintenance bldg. modify & relocate (e) sprinklers for new walls & ceiling layout for 4,367sf office space on lvl 1 & 5,585sf office space on lvl 2. remove sprinklers at top & bottom of (e) freight elevator installation.

Open the permit page

$93,000
Jun 24, 2026In progress
issued Jun 2026
3200 California StControl Air Enterprises Llcreplace two existing 4,000 mbh gas-fired hot water boilers with four new 1,999 mbh high-efficiency boilers. replace (e) 210 gallon indirect hot water heater with new of same capacity. miscellaneous piping modifications. no increase in gas loads. not decrease in gravity loads.
Details
Permit
202606243814
Status
issued
Filed
Jun 24, 2026
Permit issued
Jun 24, 2026
Declared cost
$50,000
Address
3200 California St

replace two existing 4,000 mbh gas-fired hot water boilers with four new 1,999 mbh high-efficiency boilers. replace (e) 210 gallon indirect hot water heater with new of same capacity. miscellaneous piping modifications. no increase in gas loads. not decrease in gravity loads.

Open the permit page

$50,000
Oct 7, 2025Completed
final sign-off Oct 2025
15 Dakota StGuzman Construction Group Inc.relocation of existing garden gazebo from 32 watchman wy to 15 dakota st. construct four new foundation footing to support existing gazebo.
Details
Permit
202510076894
Status
complete
Filed
Oct 7, 2025
Permit issued
Oct 8, 2025
Final sign-off
Oct 23, 2025
Declared cost
$2,000
Address
15 Dakota St

relocation of existing garden gazebo from 32 watchman wy to 15 dakota st. construct four new foundation footing to support existing gazebo.

Open the permit page

$2,000
Jul 1, 2025Completed
final sign-off Dec 2025
101 02nd StMatrix Hg Increplace (e) trane 10-ton cooling only package unit with new trane 10-tom. package unit and reconnect to existing ductwork and electrical. no work in the interior of the building
Details
Permit
202507019866
Status
complete
Filed
Jul 1, 2025
Permit issued
Sep 3, 2025
Final sign-off
Dec 17, 2025
Declared cost
$35,524
Address
101 02nd St

replace (e) trane 10-ton cooling only package unit with new trane 10-tom. package unit and reconnect to existing ductwork and electrical. no work in the interior of the building

Open the permit page

$35,524
Mar 5, 2025Completed
final sign-off Oct 2025
2230 Jerrold AvPlant Construction Co, Lpconstruction of an emergency generator to support the meals on wheels, sf production and support center. site work includes structural slab, electrical conduits to and from the building and an emergency generator. the emergency generator will be enclosed by a pre-fabricated enclosure.
Details
Permit
202501077901
Status
complete
Filed
Mar 5, 2025
Permit issued
May 14, 2025
Final sign-off
Oct 21, 2025
Declared cost
$1,400,000
Address
2230 Jerrold Av

construction of an emergency generator to support the meals on wheels, sf production and support center. site work includes structural slab, electrical conduits to and from the building and an emergency generator. the emergency generator will be enclosed by a pre-fabricated enclosure.

Open the permit page

$1,400,000
Apr 18, 2024In progress
issued Apr 2024
560 Mission StSkyline Construction16th floor: structural detail for installation of operable partition at welcome zone/flex zone. ref pa#202309186839
Details
Permit
202404180259
Status
issued
Filed
Apr 18, 2024
Permit issued
Apr 19, 2024
Declared cost
$5,000
Address
560 Mission St

16th floor: structural detail for installation of operable partition at welcome zone/flex zone. ref pa#202309186839

Open the permit page

$5,000
Apr 1, 2024Completed
final sign-off Aug 2026
1212 Maryland StSwinerton Builderspriority per ab-004. tower crane erection for contruction of project,tower crane dismantle
Details
Permit
202403137665
Status
complete
Filed
Apr 1, 2024
Permit issued
Jun 14, 2024
Final sign-off
Aug 28, 2026
Declared cost
$888,000
Address
1212 Maryland St

priority per ab-004. tower crane erection for contruction of project,tower crane dismantle

Open the permit page

$888,000
Jan 18, 2024In progress
issued Apr 2024
651 Brannan StAdams Electrical Corporationelectrical work, replacement of roof-mounted generator, replacement of ats and addition of mts in 3/f electrical room, and addtiion of portable genrator connection cabinet in basement.
Details
Permit
202401184198
Status
issued
Filed
Jan 18, 2024
Permit issued
Apr 25, 2024
Declared cost
$575,000
Address
651 Brannan St

electrical work, replacement of roof-mounted generator, replacement of ats and addition of mts in 3/f electrical room, and addtiion of portable genrator connection cabinet in basement.

Open the permit page

$575,000
Oct 25, 2023Completed
final sign-off May 2024
420 Montgomery StSkyline Constructionstair replacement @ 2nd fl roof and machine room roof
Details
Permit
202310259440
Status
complete
Filed
Oct 25, 2023
Permit issued
Nov 6, 2023
Final sign-off
May 7, 2024
Declared cost
$220,000
Address
420 Montgomery St

stair replacement @ 2nd fl roof and machine room roof

Open the permit page

$220,000
Oct 24, 2023Completed
final sign-off Feb 2024
1501 Tennessee StSkyline Constructiondeferred shop drawings for ada lift platform framing, handrails & guardrails for bpa# 2022-1116-6660.
Details
Permit
202310249371
Status
complete
Filed
Oct 24, 2023
Permit issued
Nov 21, 2023
Final sign-off
Feb 21, 2024
Address
1501 Tennessee St

deferred shop drawings for ada lift platform framing, handrails & guardrails for bpa# 2022-1116-6660.

Open the permit page

Oct 6, 2023Completed
final sign-off Oct 2024
360 03rd StSouthland Industriesreplace (2) 80 ton air-cooled chillers on roof along with three chillers water pumps. no work in the interior of the building.
Details
Permit
202310068165
Status
complete
Filed
Oct 6, 2023
Permit issued
Oct 20, 2023
Final sign-off
Oct 8, 2024
Declared cost
$300,000
Address
360 03rd St

replace (2) 80 ton air-cooled chillers on roof along with three chillers water pumps. no work in the interior of the building.

Open the permit page

$300,000
Aug 21, 2023Completed
final sign-off Mar 2024
375 Laguna Honda BlS J Amoroso Constructioninstall temporary shoring system in order to saw cut (e) slabs for structural retrofit per note n.4 on s0.3.. ref pa# 202109228981.
Details
Permit
202308214859
Status
complete
Filed
Aug 21, 2023
Permit issued
Jan 9, 2024
Final sign-off
Mar 18, 2024
Declared cost
$5,000
Address
375 Laguna Honda Bl

install temporary shoring system in order to saw cut (e) slabs for structural retrofit per note n.4 on s0.3.. ref pa# 202109228981.

Open the permit page

$5,000
Jun 15, 2023Completed
final sign-off Jul 2024
900 Innes AvSwinerton Builderspriority process-shoring sytem to construction foundations to the maintenane bldg at the park project. new construction bpa#202103247214
Details
Permit
202306150208
Status
complete
Filed
Jun 15, 2023
Permit issued
Sep 27, 2023
Final sign-off
Jul 12, 2024
Declared cost
$10,000
Address
900 Innes Av

priority process-shoring sytem to construction foundations to the maintenane bldg at the park project. new construction bpa#202103247214

Open the permit page

$10,000
Jun 13, 2023Expired or cancelled
cancelled Jan 2026
101 California StTurner Construction Cocold formed framing submittal package 2 deferred submittal for pa 2020-0619-8935
Details
Permit
202306130004
Status
cancelled
Filed
Jun 13, 2023
Declared cost
$1,220,734
Address
101 California St

cold formed framing submittal package 2 deferred submittal for pa 2020-0619-8935

Open the permit page

$1,220,734
Jun 13, 2023Expired or cancelled
cancelled Jan 2026
101 California StTurner Construction Coreplacement of (e) stair with new stair @ level ll1 to level 1 . deferred submittal for bpa 2020-0619-8935
Details
Permit
202306130005
Status
cancelled
Filed
Jun 13, 2023
Address
101 California St

replacement of (e) stair with new stair @ level ll1 to level 1 . deferred submittal for bpa 2020-0619-8935

Open the permit page

May 3, 2023Completed
final sign-off May 2023
580 Ortega StCy Lo Builderrevision to permit 201412304701. concrete compression calculation to 2500psi. no moment frame in construction. revised special inspection and structural observation document.
Details
Permit
202305037042
Status
complete
Filed
May 3, 2023
Permit issued
May 19, 2023
Final sign-off
May 23, 2023
Address
580 Ortega St

revision to permit 201412304701. concrete compression calculation to 2500psi. no moment frame in construction. revised special inspection and structural observation document.

Open the permit page

Dec 7, 2022Completed
final sign-off May 2023
9 Bernice StCity Mechanical Increlocation of existing rooftop ac unit to proper & safe location.
Details
Permit
202212077803
Status
complete
Filed
Dec 7, 2022
Permit issued
Dec 9, 2022
Final sign-off
May 16, 2023
Declared cost
$60,000
Address
9 Bernice St

relocation of existing rooftop ac unit to proper & safe location.

Open the permit page

$60,000
Nov 1, 2022Completed
final sign-off May 2023
101 California StTurner Construction Cometal stairs deferred submittal for 202106283370
Details
Permit
202211015633
Status
complete
Filed
Nov 1, 2022
Permit issued
Nov 8, 2022
Final sign-off
May 16, 2023
Declared cost
$152,000
Address
101 California St

metal stairs deferred submittal for 202106283370

Open the permit page

$152,000
Nov 1, 2022Completed
final sign-off Jul 2023
433 Natoma StSwinerton Buildersproject consists of adding a voluntary partial seismic upgrade of existing unreinforced masonry wall
Details
Permit
202211015639
Status
complete
Filed
Nov 1, 2022
Permit issued
Dec 16, 2022
Final sign-off
Jul 27, 2023
Declared cost
$30,000
Address
433 Natoma St

project consists of adding a voluntary partial seismic upgrade of existing unreinforced masonry wall

Open the permit page

$30,000
Oct 6, 2022Completed
final sign-off Apr 2023
55 Stockton StParadigm General Contractors8th fl interior renovation. approx construction area 6,755 sqft. scope includes architectural and meps.
Details
Permit
202210063919
Status
complete
Filed
Oct 6, 2022
Permit issued
Nov 3, 2022
Final sign-off
Apr 7, 2023
Declared cost
$1,925,021
Address
55 Stockton St

8th fl interior renovation. approx construction area 6,755 sqft. scope includes architectural and meps.

Open the permit page

$1,925,021
Jun 17, 2022Completed
final sign-off May 2024
78 Johnson StNibbi Bros Assoc Inc.operation of potain mdt 219-j10 tower crane for erecting 7-story affordable housing apartment building. heaviest load = 7,000 lbs of rebar. crane foundation shell on grade. ref pa# 202206176610 s
Details
Permit
202206176610
Status
complete
Filed
Jun 17, 2022
Permit issued
Aug 10, 2022
Final sign-off
May 15, 2024
Declared cost
$90,000
Address
78 Johnson St

operation of potain mdt 219-j10 tower crane for erecting 7-story affordable housing apartment building. heaviest load = 7,000 lbs of rebar. crane foundation shell on grade. ref pa# 202206176610 s

Open the permit page

$90,000
Mar 18, 2022Completed
final sign-off Sep 2023
121 Spear StBcci Construction Company1st floor: new lobby communicating stair, related handrail and guardrail. non structural partitions. doors/frames/hardware, ceiling, millwork, finishes included stuctural calcs included. mep deffered.
Details
Permit
202203180339
Status
complete
Filed
Mar 18, 2022
Permit issued
Mar 21, 2022
Final sign-off
Sep 21, 2023
Declared cost
$450,000
Address
121 Spear St

1st floor: new lobby communicating stair, related handrail and guardrail. non structural partitions. doors/frames/hardware, ceiling, millwork, finishes included stuctural calcs included. mep deffered.

Open the permit page

$450,000
Feb 18, 2022Completed
final sign-off Mar 2022
838 Kearny Stremove and replacement of (e) 42in tall code compliant guardrails at levels 3 & 4 egress balconies with new compliant, 7ft tall painted stell guardrails.
Details
Permit
202202188363
Status
complete
Filed
Feb 18, 2022
Permit issued
Feb 24, 2022
Final sign-off
Mar 31, 2022
Declared cost
$120,000
Address
838 Kearny St

remove and replacement of (e) 42in tall code compliant guardrails at levels 3 & 4 egress balconies with new compliant, 7ft tall painted stell guardrails.

Open the permit page

$120,000
Jul 14, 2021Completed
final sign-off Sep 2021
2325 Noriega StMatrix Hg Increplace 4 existing rooftop package units with new of same make and capacity. replacement unit weights are within 5% of the existing unit weight.
Details
Permit
202107144330
Status
complete
Filed
Jul 14, 2021
Permit issued
Jul 21, 2021
Final sign-off
Sep 24, 2021
Declared cost
$28,913
Address
2325 Noriega St

replace 4 existing rooftop package units with new of same make and capacity. replacement unit weights are within 5% of the existing unit weight.

Open the permit page

$28,913
Jun 9, 2021Completed
final sign-off Dec 2021
1275 Market StIn Compliance Services Increplace 2-300 gallon diesel storage tanks located on basement level 3 serving an existing generator and fire pump
Details
Permit
202106092000
Status
complete
Filed
Jun 9, 2021
Permit issued
Sep 29, 2021
Final sign-off
Dec 30, 2021
Declared cost
$65,000
Address
1275 Market St

replace 2-300 gallon diesel storage tanks located on basement level 3 serving an existing generator and fire pump

Open the permit page

$65,000
Jan 28, 2021Never finaled
issued Jun 2021, no final
50 Hyde StBuild Group Inc.freestanding tower crane #1 (hyde st) to be erected for uc hastings 198 mcallister project: dsa# 01-118648 / ofsm# 19-n-2933-cp-nw. the scope of work includes construction of the crane footing, special inspections, erection, operation and dismantle of the tower crane.
Details
Permit
202101283553
Status
issued
Filed
Jan 28, 2021
Permit issued
Jun 9, 2021
Declared cost
$200,000
Address
50 Hyde St

freestanding tower crane #1 (hyde st) to be erected for uc hastings 198 mcallister project: dsa# 01-118648 / ofsm# 19-n-2933-cp-nw. the scope of work includes construction of the crane footing, special inspections, erection, operation and dismantle of the tower crane.

Open the permit page

$200,000
Jan 11, 2021Never finaled
issued Feb 2022, no final
901 16th StTruebeck Constructioncombine two 1 story industrial warehouse buildings & the brick office structure to create one bldg on a single lot.the project has applied for a lot merger withthe city of sf.reuse of(e) structures to construct a core & shell base bldg to accomodate wholesale produce market(pdr use)
Details
Permit
202101112460
Status
issued
Filed
Jan 11, 2021
Permit issued
Feb 14, 2022
Declared cost
$40,000,000
Address
901 16th St

combine two 1 story industrial warehouse buildings & the brick office structure to create one bldg on a single lot.the project has applied for a lot merger withthe city of sf.reuse of(e) structures to construct a core & shell base bldg to accomodate wholesale produce market(pdr use)

Open the permit page

$40,000,000
Dec 16, 2020Completed
final sign-off Dec 2023
45 Onondaga AvNibbi Bros Assoc Inc.core & shell upgrades only including new mechanical system, new structural framing associated with new rooftop mechanical unit. replacing plumbing lines in kind. new sprinkler system. new electrical & fire alarm.
Details
Permit
202012161144
Status
complete
Filed
Dec 16, 2020
Permit issued
Mar 25, 2022
Final sign-off
Dec 18, 2023
Declared cost
$150,000
Address
45 Onondaga Av

core & shell upgrades only including new mechanical system, new structural framing associated with new rooftop mechanical unit. replacing plumbing lines in kind. new sprinkler system. new electrical & fire alarm.

Open the permit page

$150,000
Nov 30, 2020Completed
final sign-off Nov 2021
420 Taylor StNibbi Bros Assoc Inc.revision to bpa# 201901160492. this application is for the review and approval of design/build interior steel stairs. the attached shop drawings and calculations have been reviewed and approved by the project architect and structural engineer.
Details
Permit
202011309816
Status
complete
Filed
Nov 30, 2020
Permit issued
Apr 23, 2021
Final sign-off
Nov 19, 2021
Declared cost
$150,000
Address
420 Taylor St

revision to bpa# 201901160492. this application is for the review and approval of design/build interior steel stairs. the attached shop drawings and calculations have been reviewed and approved by the project architect and structural engineer.

Open the permit page

$150,000
Nov 25, 2019Completed
final sign-off Aug 2020
201 Spear StMatrix Hg Incroof - replace (e) supply fan with new unit (roof) of identical capacity and reconnect existing duct work
Details
Permit
201911258132
Status
complete
Filed
Nov 25, 2019
Permit issued
Nov 25, 2019
Final sign-off
Aug 10, 2020
Declared cost
$199,000
Address
201 Spear St

roof - replace (e) supply fan with new unit (roof) of identical capacity and reconnect existing duct work

Open the permit page

$199,000
Nov 12, 2019Completed
final sign-off Oct 2022
53 Colton StSuffolk Constr Co. Inc. Dba Suffolk-Roelto erect 6 stories, 1 basement, type iii-a over i-a, 96 units residential with office, & assembly building. (r-2,b,a-3,s-2) (mayor exective dir# 13-01 & 17-02)
Details
Permit
201911127017
Status
complete
Filed
Nov 12, 2019
Permit issued
May 18, 2020
Final sign-off
Oct 5, 2022
Declared cost
$25,000,000
Address
53 Colton St

to erect 6 stories, 1 basement, type iii-a over i-a, 96 units residential with office, & assembly building. (r-2,b,a-3,s-2) (mayor exective dir# 13-01 & 17-02)

Open the permit page

$25,000,000
Oct 30, 2019Completed
final sign-off Dec 2021
415 Natoma StSwinerton Builderstower crane foundation. reference site permit #2018-0629-3425 s.
Details
Permit
201910305989
Status
complete
Filed
Oct 30, 2019
Permit issued
Jan 14, 2020
Final sign-off
Dec 2, 2021
Declared cost
$10,000
Address
415 Natoma St

tower crane foundation. reference site permit #2018-0629-3425 s.

Open the permit page

$10,000
Jul 9, 2019Completed
final sign-off Jan 2021
2500 Turk BlCounty Builders Construction Inc.1 tower crane erection
Details
Permit
201907095432
Status
complete
Filed
Jul 9, 2019
Permit issued
Jul 18, 2019
Final sign-off
Jan 29, 2021
Declared cost
$221,766
Address
2500 Turk Bl

1 tower crane erection

Open the permit page

$221,766
Jul 2, 2019Completed
final sign-off Mar 2020
1470 Owens StTruebeck Constructiondeferred submittal to pa 201806010826, item 3 "metal stud wall system" cold-formed steel framing
Details
Permit
201907025019
Status
complete
Filed
Jul 2, 2019
Permit issued
Jul 16, 2019
Final sign-off
Mar 12, 2020
Address
1470 Owens St

deferred submittal to pa 201806010826, item 3 "metal stud wall system" cold-formed steel framing

Open the permit page

Jul 2, 2019Completed
final sign-off Mar 2020
1470 Owens StTruebeck Constructiondeferred submittal to pa 201806010826, item 2 "miscellaneous metal rails". metal rails
Details
Permit
201907025020
Status
complete
Filed
Jul 2, 2019
Permit issued
Jul 16, 2019
Final sign-off
Mar 12, 2020
Address
1470 Owens St

deferred submittal to pa 201806010826, item 2 "miscellaneous metal rails". metal rails

Open the permit page

Jul 2, 2019Completed
final sign-off Mar 2020
1470 Owens StTruebeck Constructiondeferred submittal to pa 201806010826. aluminum fin facade.
Details
Permit
201907025015
Status
complete
Filed
Jul 2, 2019
Permit issued
Jul 16, 2019
Final sign-off
Mar 12, 2020
Address
1470 Owens St

deferred submittal to pa 201806010826. aluminum fin facade.

Open the permit page

May 20, 2019Completed
final sign-off Mar 2022
950 Market StLend Lease (Us) Construction Incerect of east temporary tower crane at 950 market st. foundation for east towner carne. reference to site permit application #201602089004s.
Details
Permit
201905201165
Status
complete
Filed
May 20, 2019
Permit issued
Aug 14, 2019
Final sign-off
Mar 18, 2022
Declared cost
$206,500
Address
950 Market St

erect of east temporary tower crane at 950 market st. foundation for east towner carne. reference to site permit application #201602089004s.

Open the permit page

$206,500
May 20, 2019Completed
final sign-off Aug 2021
950 Market StLend Lease (Us) Construction Incfoundation for west tower crane at 950 market st. erection of temporay tower crane. refgerence to site permit application #201602089004s.
Details
Permit
201905201173
Status
complete
Filed
May 20, 2019
Permit issued
Aug 14, 2019
Final sign-off
Aug 30, 2021
Declared cost
$206,500
Address
950 Market St

foundation for west tower crane at 950 market st. erection of temporay tower crane. refgerence to site permit application #201602089004s.

Open the permit page

$206,500
Apr 24, 2019Completed
final sign-off Oct 2021
2060 Folsom StJames E Roberts-Obayashi Corporationerection of tower crane. ref pa #201608054294. ** maher: n/a **
Details
Permit
201904248826
Status
complete
Filed
Apr 24, 2019
Permit issued
Aug 14, 2019
Final sign-off
Oct 6, 2021
Declared cost
$150,000
Address
2060 Folsom St

erection of tower crane. ref pa #201608054294. ** maher: n/a **

Open the permit page

$150,000
Feb 14, 2019Completed
final sign-off Feb 2021
1830 17th StOliver & Company Inc.temporary shoring of roof & walls to assure safety and stability during demolition and full roof replacement. work will be done concurrently with bpa #201809200887.
Details
Permit
201902142931
Status
complete
Filed
Feb 14, 2019
Permit issued
Mar 27, 2019
Final sign-off
Feb 26, 2021
Declared cost
$25,000
Address
1830 17th St

temporary shoring of roof & walls to assure safety and stability during demolition and full roof replacement. work will be done concurrently with bpa #201809200887.

Open the permit page

$25,000
Oct 22, 2018Completed
final sign-off Dec 2023
1 Avenue Of The PalmsCahill Contractors Incpriority processing.to erect 6 stories, no basement, type i-a & iii-a. 105 units apartment, office, parking, amenity spaces buidling (r-2,b,a-3,s-2). (mayor executive directive 17-02) 100% affordable housing project. maceo may apts project.
Details
Permit
201810223762
Status
complete
Filed
Oct 22, 2018
Permit issued
Apr 8, 2019
Final sign-off
Dec 28, 2023
Declared cost
$40,000,000
Address
1 Avenue Of The Palms

priority processing.to erect 6 stories, no basement, type i-a & iii-a. 105 units apartment, office, parking, amenity spaces buidling (r-2,b,a-3,s-2). (mayor executive directive 17-02) 100% affordable housing project. maceo may apts project.

Open the permit page

$40,000,000
Oct 4, 2018Expired or cancelled
cancelled Jan 2026
110 Sutter StMatrix Hg Inc2/f: installat of brf system on second floor to feed into fifth floor. ref. t.i. pa201805240048. maher n/a.
Details
Permit
201810042227
Status
cancelled
Filed
Oct 4, 2018
Declared cost
$10,000
Address
110 Sutter St

2/f: installat of brf system on second floor to feed into fifth floor. ref. t.i. pa201805240048. maher n/a.

Open the permit page

$10,000
Aug 28, 2018Completed
final sign-off Apr 2021
1169 Market StSwinerton Builderstower crane1 (rerex peiner sk415-20)- erection & dismantle reference to building application #201511203265s
Details
Permit
201808288509
Status
complete
Filed
Aug 28, 2018
Permit issued
Oct 5, 2018
Final sign-off
Apr 27, 2021
Declared cost
$70,000
Address
1169 Market St

tower crane1 (rerex peiner sk415-20)- erection & dismantle reference to building application #201511203265s

Open the permit page

$70,000
Aug 28, 2018Completed
final sign-off Apr 2021
1169 Market StSwinerton Builderstower crane#2 (terex comedil ctt 332-16)- erection & dismantle reference to application #201808288512s
Details
Permit
201808288512
Status
complete
Filed
Aug 28, 2018
Permit issued
Oct 5, 2018
Final sign-off
Apr 27, 2021
Declared cost
$50,000
Address
1169 Market St

tower crane#2 (terex comedil ctt 332-16)- erection & dismantle reference to application #201808288512s

Open the permit page

$50,000
Jun 6, 2018Completed
final sign-off Aug 2022
170 Ofarrell StSwinerton Buildersrevision to construction for ti spaces. pa#201711012866. deferred structural details for 2 metal stairs from one retail space to mezzanine floor. maher not req
Details
Permit
201806061162
Status
complete
Filed
Jun 6, 2018
Permit issued
Jun 7, 2018
Final sign-off
Aug 23, 2022
Declared cost
$46,190
Address
170 Ofarrell St

revision to construction for ti spaces. pa#201711012866. deferred structural details for 2 metal stairs from one retail space to mezzanine floor. maher not req

Open the permit page

$46,190
May 4, 2018Completed
final sign-off Aug 2024
120 Stockton StPribuss Engineering Inc, Plant Construction Co, Lpmajor alterations of an (e) building & includes the replacement of exterior wall & the addition of 4 roof amenity space. **comply w/ maher**
Details
Permit
201805048215
Status
complete
Filed
May 4, 2018
Permit issued
Nov 15, 2018
Final sign-off
Aug 21, 2024
Declared cost
$80,000,000
Address
120 Stockton St

major alterations of an (e) building & includes the replacement of exterior wall & the addition of 4 roof amenity space. **comply w/ maher**

Open the permit page

$80,000,000
Mar 28, 2018Never finaled
issued Apr 2018, no final
1830 17th StOliver & Company Inc.to comply with complaint 201845721 - emergency shoring permit - work completed dec 2017 - collapsed roof truss shored to assure safety and stability. permanent repair under seperate permit.
Details
Permit
201803284813
Status
issued
Filed
Mar 28, 2018
Permit issued
Apr 5, 2018
Declared cost
$2,500
Address
1830 17th St

to comply with complaint 201845721 - emergency shoring permit - work completed dec 2017 - collapsed roof truss shored to assure safety and stability. permanent repair under seperate permit.

Open the permit page

$2,500
Feb 14, 2018Completed
final sign-off Apr 2018
2 Bryant StMatrix Hg Incremove and replace cooling tower, like for like on roof.
Details
Permit
201802141293
Status
complete
Filed
Feb 14, 2018
Permit issued
Feb 14, 2018
Final sign-off
Apr 26, 2018
Declared cost
$30,000
Address
2 Bryant St

remove and replace cooling tower, like for like on roof.

Open the permit page

$30,000
Feb 7, 2018Completed
final sign-off May 2022
160 Folsom StLend Lease (Us) Construction Inctower crane #2 foundation (ref pa #2014-0625-9481 s)
Details
Permit
201802070644
Status
complete
Filed
Feb 7, 2018
Permit issued
Apr 11, 2018
Final sign-off
May 9, 2022
Declared cost
$50,000
Address
160 Folsom St

tower crane #2 foundation (ref pa #2014-0625-9481 s)

Open the permit page

$50,000
Feb 7, 2018Completed
final sign-off May 2022
160 Folsom StLend Lease (Us) Construction Inctower crane #1 tie-in (ref pa #2014-0625-9481 s)
Details
Permit
201802070641
Status
complete
Filed
Feb 7, 2018
Permit issued
Jun 14, 2018
Final sign-off
May 9, 2022
Declared cost
$150,000
Address
160 Folsom St

tower crane #1 tie-in (ref pa #2014-0625-9481 s)

Open the permit page

$150,000
Aug 23, 2017Completed
final sign-off May 2022
160 Folsom StLend Lease (Us) Construction Inctower crane site safety permit & associated crane foundation & tie-in design for erection. tc# 1 - liebherr 550 ec# 20 litronic with 2 tie-inc. ref pa# 2014/06/25/9481-s. ** maher: n/a **
Details
Permit
201708235641
Status
complete
Filed
Aug 23, 2017
Permit issued
Dec 8, 2017
Final sign-off
May 9, 2022
Declared cost
$474,522
Address
160 Folsom St

tower crane site safety permit & associated crane foundation & tie-in design for erection. tc# 1 - liebherr 550 ec# 20 litronic with 2 tie-inc. ref pa# 2014/06/25/9481-s. ** maher: n/a **

Open the permit page

$474,522
May 10, 2017Completed
final sign-off Sep 2018
5050 Mission StJames E Roberts-Obayashi Corporationerection of tower crane. reference to building permit application no. 201006104250 s ** maher: n/a **
Details
Permit
201705106286
Status
complete
Filed
May 10, 2017
Permit issued
Jul 12, 2017
Final sign-off
Sep 24, 2018
Declared cost
$35,000
Address
5050 Mission St

erection of tower crane. reference to building permit application no. 201006104250 s ** maher: n/a **

Open the permit page

$35,000
Dec 19, 2016Never finaled
issued Dec 2016, no final
201 03rd StClune Construction Company L Ptemp shoring pemrit for partial demo of 5/f for interoconnection stairwell from 4/f to 5/f. ref pa#201611172948.
Details
Permit
201612195335
Status
issued
Filed
Dec 19, 2016
Permit issued
Dec 21, 2016
Declared cost
$10,000
Address
201 03rd St

temp shoring pemrit for partial demo of 5/f for interoconnection stairwell from 4/f to 5/f. ref pa#201611172948.

Open the permit page

$10,000
Aug 9, 2016Completed
final sign-off Oct 2016
55 Hawthorne StMatrix Hg Incroof top/penthouse- replacement of boiler & (2) pumps.
Details
Permit
201608094592
Status
complete
Filed
Aug 9, 2016
Permit issued
Aug 9, 2016
Final sign-off
Oct 6, 2016
Declared cost
$127,900
Address
55 Hawthorne St

roof top/penthouse- replacement of boiler & (2) pumps.

Open the permit page

$127,900
May 6, 2005Never finaled
issued May 2005, no final
812 Central Avfoundation repair to comply with n.o.v# 200559185.
Details
Permit
200505061795
Status
issued
Filed
May 6, 2005
Permit issued
May 6, 2005
Declared cost
$4,000
Address
812 Central Av

foundation repair to comply with n.o.v# 200559185.

Open the permit page

$4,000