Enhao Zhang
- License
- 92778
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- engineer
- Firm
- Pape Engineered Products
- Based in
- La Verne
- On San Francisco permits
- Jan 2021 to Dec 2025
4 permits since 2000 (engineer on 4 permits): 2 completed, 1 in progress, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Big Joe California North Inc (2), Engineered Products A Pape' Company, Truebeck Construction
- Architects
- Brian Liles
- Engineers
- Carl Milsum, Craig Ristow, David Fulton, Marc Press
- Subcontractors
- Peter Goldsmith
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 4
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 23, 2025 | In progress issued Mar 2026 | 901 16th St | Engineered Products A Pape' Company | installation of 144" tall pallet racking in receiving processing room and display roomDetails
installation of 144" tall pallet racking in receiving processing room and display room | $4,000 |
| Oct 22, 2024 | Completed final sign-off Aug 2025 | 901 16th St | Big Joe California North Inc | install 195 ln ft x 18' high of storage racksDetails
install 195 ln ft x 18' high of storage racks | $18,000 |
| Oct 13, 2023 | Completed final sign-off Jan 2025 | 400 16th St | Big Joe California North Inc | install non-high piled racks top of products no more than 12' high 38 ln. ft. of racks equivalent to 240 sf area of work @ the basement area for restaurant.Details
install non-high piled racks top of products no more than 12' high 38 ln. ft. of racks equivalent to 240 sf area of work @ the basement area for restaurant. | $5,000 |
| Jan 11, 2021 | Never finaled issued Feb 2022, no final | 901 16th St | Truebeck Construction | combine two 1 story industrial warehouse buildings & the brick office structure to create one bldg on a single lot.the project has applied for a lot merger withthe city of sf.reuse of(e) structures to construct a core & shell base bldg to accomodate wholesale produce market(pdr use)Details
combine two 1 story industrial warehouse buildings & the brick office structure to create one bldg on a single lot.the project has applied for a lot merger withthe city of sf.reuse of(e) structures to construct a core & shell base bldg to accomodate wholesale produce market(pdr use) | $40,000,000 |