David Fulton
- License
- C89429
- Civil engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up C89429 at the Board for Professional Engineers
- Listed as
- engineer
- Firm
- Plan North Engineers
- On San Francisco permits
- Jan 2021 to Jan 2025
3 permits since 2000 (engineer on 3 permits): 1 completed, 1 in progress, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Rudy's Commercial Refrigeration Inc (2), Truebeck Construction
- Architects
- Brian Liles
- Engineers
- Carl Milsum, Craig Ristow, Enhao Zhang, Marc Press
- Subcontractors
- Peter Goldsmith
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 3
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 21, 2025 | Completed final sign-off Feb 2025 | 293 Bay Shore Bl | Rudy's Commercial Refrigeration Inc | install cold storage room. walk-in cooler.Details
install cold storage room. walk-in cooler. | $21,932 |
| Nov 27, 2023 | In progress issued Feb 2024 | 1325 Egbert Av | Rudy's Commercial Refrigeration Inc | install refrigerated cold rooms, cooler/freezer perfabricated construction. upgrade accessible entranceDetails
install refrigerated cold rooms, cooler/freezer perfabricated construction. upgrade accessible entrance | $82,429 |
| Jan 11, 2021 | Never finaled issued Feb 2022, no final | 901 16th St | Truebeck Construction | combine two 1 story industrial warehouse buildings & the brick office structure to create one bldg on a single lot.the project has applied for a lot merger withthe city of sf.reuse of(e) structures to construct a core & shell base bldg to accomodate wholesale produce market(pdr use)Details
combine two 1 story industrial warehouse buildings & the brick office structure to create one bldg on a single lot.the project has applied for a lot merger withthe city of sf.reuse of(e) structures to construct a core & shell base bldg to accomodate wholesale produce market(pdr use) | $40,000,000 |