Permit GraphShortlistSan Francisco building permits since 2000

Rudy's Commercial Refrigeration Inc

Contractor license
641418
State license record
Based in
San Pablo
On San Francisco permits
Jan 2012 to Jan 2025
Last 24 months
1 permit filed

5 permits since 2000: 2 completed, 1 in progress, 2 never finaled.

Of the 2 never-finaled permits, 2 are 5 to 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Most recent permits

All
FiledOutcomeAddressWork described on the permitDeclared cost
Jan 21, 2025Completed
final sign-off Feb 2025
293 Bay Shore Blinstall cold storage room. walk-in cooler.
Details
Permit
202501218687
Status
complete
Filed
Jan 21, 2025
Permit issued
Jan 27, 2025
Final sign-off
Feb 14, 2025
Declared cost
$21,932
Address
293 Bay Shore Bl

install cold storage room. walk-in cooler.

Open the permit page

$21,932
Nov 27, 2023In progress
issued Feb 2024
1325 Egbert Avinstall refrigerated cold rooms, cooler/freezer perfabricated construction. upgrade accessible entrance
Details
Permit
202311271381
Status
issued
Filed
Nov 27, 2023
Permit issued
Feb 13, 2024
Declared cost
$82,429
Address
1325 Egbert Av

install refrigerated cold rooms, cooler/freezer perfabricated construction. upgrade accessible entrance

Open the permit page

$82,429
Jul 22, 2019Never finaled
issued Jul 2019, no final
1096 South Van Ness Avremove (e) walk-in freezer/replace new prefab freezer using (e) mechanical
Details
Permit
201907226492
Status
issued
Filed
Jul 22, 2019
Permit issued
Jul 22, 2019
Declared cost
$15,911
Address
1096 South Van Ness Av

remove (e) walk-in freezer/replace new prefab freezer using (e) mechanical

Open the permit page

$15,911
Jul 7, 2017Never finaled
issued Aug 2017, no final
600 Stockton Streplace existing cold rooms with same foot print using prefab factor manufactured modular equipment. mechanical is pre charged systems top mount not to exceed 400 lbs. per cut. 4 boxes @ 592 sf. n/a for maher.
Details
Permit
201707071216
Status
issued
Filed
Jul 7, 2017
Permit issued
Aug 18, 2017
Declared cost
$140,000
Address
600 Stockton St

replace existing cold rooms with same foot print using prefab factor manufactured modular equipment. mechanical is pre charged systems top mount not to exceed 400 lbs. per cut. 4 boxes @ 592 sf. n/a for maher.

Open the permit page

$140,000
Jan 31, 2012Completed
final sign-off Apr 2013
500 04th Streplace extg keg cooler with new keg cooler and upgrade of front entry door to full ada compliance, new door to match existing
Details
Permit
201201313244
Status
complete
Filed
Jan 31, 2012
Permit issued
Feb 7, 2012
Final sign-off
Apr 3, 2013
Declared cost
$10,000
Address
500 04th St

replace extg keg cooler with new keg cooler and upgrade of front entry door to full ada compliance, new door to match existing

Open the permit page

$10,000