Block 3721, lot 089
101 02nd St
- City’s use
- Commercial Office
- Built
- 2000
- Stories
- 26
- Building
- 394,250 sq ft
- Lot
- 27,560 sq ft
- Zoning
- C3O
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
The 200 most recent permits filed for this property.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 10, 2026 | In progress issued Sep 2026 | 101 02nd St | Source Planning And Construction Inc | 8/f suite 800: deferred mep for ref pa 202607144969. electrical - office t.i retrofit: lighting with associated circuits and controls, power and signal with associated circuits and wiring. mechanical - demo of ceiling diffusers in open area. install of ductwork where required. new sidewall diffusersDetails
8/f suite 800: deferred mep for ref pa 202607144969. electrical - office t.i retrofit: lighting with associated circuits and controls, power and signal with associated circuits and wiring. mechanical - demo of ceiling diffusers in open area. install of ductwork where required. new sidewall diffusers | $92,450 |
| Jul 14, 2026 | In progress issued Jul 2026 | 101 02nd St | Source Planning And Construction Inc | 8/f suite 800: tenant improvement remodel including new partitions, office door and glazing. reference plan for restrooms #202504285316 completed 11/18/2025. mep deferred.Details
8/f suite 800: tenant improvement remodel including new partitions, office door and glazing. reference plan for restrooms #202504285316 completed 11/18/2025. mep deferred. | $324,000 |
| May 18, 2026 | In progress issued May 2026 | 101 02nd St | Source Planning And Construction Inc | suite: 350 - new power and signal throught the space, new 2025 t24 lighting and controls. ref bpa: 202603268312Details
suite: 350 - new power and signal throught the space, new 2025 t24 lighting and controls. ref bpa: 202603268312 | $70,000 |
| May 14, 2026 | In progress issued May 2026 | 101 02nd St | Source Planning And Construction Inc | unit# 350: furnish and istall one new 1-ton water source heat pump associated ductwork. piping and condensate for it room. ref 202630268312Details
unit# 350: furnish and istall one new 1-ton water source heat pump associated ductwork. piping and condensate for it room. ref 202630268312 | $54,000 |
| Apr 27, 2026 | In progress issued Apr 2026 | 101 02nd St | Source Planning And Construction Inc | (ste# 350 / 3rd floor) revision to pa# 202603268312: work includes installation of 6 phone booths.Details
(ste# 350 / 3rd floor) revision to pa# 202603268312: work includes installation of 6 phone booths. | |
| Mar 26, 2026 | In progress issued Mar 2026 | 101 02nd St | Source Planning And Construction Inc | 3/f suite 350 - work includes: new partitions, office door and glazing and mill work.Details
3/f suite 350 - work includes: new partitions, office door and glazing and mill work. | $125,000 |
| Nov 25, 2025 | Completed final sign-off Dec 2025 | 101 02nd St | 15th fl - fire sprinkler, switch 18 pendents with upright fire sprinklers ti 202510016514Details
15th fl - fire sprinkler, switch 18 pendents with upright fire sprinklers ti 202510016514 | $5,000 | |
| Nov 6, 2025 | Completed final sign-off Dec 2025 | 101 02nd St | Source Planning And Construction Inc | 15/fl: new lighting and controls for whit ebox space reference arch permit#2025-1001-6514Details
15/fl: new lighting and controls for whit ebox space reference arch permit#2025-1001-6514 | $10,000 |
| Oct 28, 2025 | Completed final sign-off Jan 2026 | 101 02nd St | Sabah International Incorporated | 15th fl new fire alarm layout in t.i areas. demolish initiating devices and notiification appliances within the scope of work. remove all abandoned wiere and conduit. ref 202510016514Details
15th fl new fire alarm layout in t.i areas. demolish initiating devices and notiification appliances within the scope of work. remove all abandoned wiere and conduit. ref 202510016514 | $12,000 |
| Oct 1, 2025 | Completed final sign-off Dec 2025 | 101 02nd St | Source Planning And Construction Inc | 15th/fl: demolition of non load bearing artitions , ceilings, light fixtures, millwork and finishes.Details
15th/fl: demolition of non load bearing artitions , ceilings, light fixtures, millwork and finishes. | $250,000 |
| Sep 26, 2025 | Completed final sign-off Oct 2025 | 101 02nd St | Golden Gate Fire Protection Inc | as built to #202504285317; relocate 1 upright in the janitor's closet on the 3rd, 4th, & 8th floors (3 uprights total)Details
as built to #202504285317; relocate 1 upright in the janitor's closet on the 3rd, 4th, & 8th floors (3 uprights total) | $750 |
| Sep 25, 2025 | Completed final sign-off Dec 2025 | 101 02nd St | Source Planning And Construction Inc | 3rd, 4th, & 8th floors: new 2022 title-24 compliant lighting and controls for janitor closets. ref pa #202508213649Details
3rd, 4th, & 8th floors: new 2022 title-24 compliant lighting and controls for janitor closets. ref pa #202508213649 | $7,500 |
| Aug 21, 2025 | Completed final sign-off Dec 2025 | 101 02nd St | Source Planning And Construction Inc | 3rd, 4th & 8th fl- modification of adding a new door to an (e) storage room at public elevator lobbyDetails
3rd, 4th & 8th fl- modification of adding a new door to an (e) storage room at public elevator lobby | $15,000 |
| Jul 1, 2025 | Completed final sign-off Dec 2025 | 101 02nd St | Matrix Hg Inc | replace (e) trane 10-ton cooling only package unit with new trane 10-tom. package unit and reconnect to existing ductwork and electrical. no work in the interior of the buildingDetails
replace (e) trane 10-ton cooling only package unit with new trane 10-tom. package unit and reconnect to existing ductwork and electrical. no work in the interior of the building | $35,524 |
| May 15, 2025 | Completed final sign-off Aug 2025 | 101 02nd St | C C I Commercial Construction & Improv | 16th fl suite 1625: selective demolition of non load bearing partitions. new office glazing, frames and new finishesDetails
16th fl suite 1625: selective demolition of non load bearing partitions. new office glazing, frames and new finishes | $19,369 |
| May 14, 2025 | Completed final sign-off May 2025 | 101 02nd St | Golden Gate Fire Protection Inc | 4th fl - fire sprinkler ti. replace 2 concealed pendents in the elevator lobby. ref ti 202503252960Details
4th fl - fire sprinkler ti. replace 2 concealed pendents in the elevator lobby. ref ti 202503252960 | $500 |
| May 5, 2025 | Completed final sign-off Nov 2025 | 101 02nd St | Source Planning And Construction Inc | hvac scope selective demo and ap install new air distribution, ductwork, relocate tstat per floor plan. air balance. elec scope: new power and signal devices throughout space and new 2022 title 24 comopliant lighting and controls ref 202502100012Details
hvac scope selective demo and ap install new air distribution, ductwork, relocate tstat per floor plan. air balance. elec scope: new power and signal devices throughout space and new 2022 title 24 comopliant lighting and controls ref 202502100012 | $152,500 |
| May 1, 2025 | In progress issued May 2025 | 101 02nd St | Sabah International Incorporated | 4th fl - provide modification of the existing fire alarm system. add 1 new smoke detector on the; add 2 new two way emergency communication call boxes ref pa 202503252960Details
4th fl - provide modification of the existing fire alarm system. add 1 new smoke detector on the; add 2 new two way emergency communication call boxes ref pa 202503252960 | $13,348 |
| Apr 28, 2025 | Completed final sign-off Nov 2025 | 101 02nd St | Source Planning And Construction Inc | 8th fl suite 825 & 850: revision to pa 2025-0210-0012 scope includes change location of the proposed drinking fountainsDetails
8th fl suite 825 & 850: revision to pa 2025-0210-0012 scope includes change location of the proposed drinking fountains | |
| Apr 28, 2025 | In progress issued Apr 2025 | 101 02nd St | Golden Gate Fire Protection Inc | 8th fl - fire sprinkler ti relocate 11 pendents, relocate 3 uprights, and delete 3 pendents. ref pa 202502100012Details
8th fl - fire sprinkler ti relocate 11 pendents, relocate 3 uprights, and delete 3 pendents. ref pa 202502100012 | $3,500 |
| Apr 24, 2025 | Completed final sign-off Nov 2025 | 101 02nd St | Source Planning And Construction Inc | 4/fl-ti 202503252960-title 24 compliant lighting and controls. new receptacles in restroomDetails
4/fl-ti 202503252960-title 24 compliant lighting and controls. new receptacles in restroom | $50,000 |
| Apr 4, 2025 | Completed final sign-off Jun 2025 | 101 02nd St | Sabah International Incorporated | 8th fl - provide new fire notification appliances under ti area of work. like for like replacement of (e) notification appliances outside the ti area with new notification appliances ref pa 202502100012Details
8th fl - provide new fire notification appliances under ti area of work. like for like replacement of (e) notification appliances outside the ti area with new notification appliances ref pa 202502100012 | $26,253 |
| Mar 31, 2025 | Completed final sign-off Feb 2026 | 101 02nd St | Prima Acquire Inc Dba Lahue And Associat | to install double faced blade sign: "cibc" 38.5" x 44.75" x 6"Details
to install double faced blade sign: "cibc" 38.5" x 44.75" x 6" | $7,295 |
| Mar 25, 2025 | Completed final sign-off Nov 2025 | 101 02nd St | Source Planning And Construction Inc | 4/f: modification of an existing elevator lobby and restrooms, including demolition and new soffit ceiling, new light fixtures, new flooring and finished. mep deferred.Details
4/f: modification of an existing elevator lobby and restrooms, including demolition and new soffit ceiling, new light fixtures, new flooring and finished. mep deferred. | $224,550 |
| Feb 10, 2025 | Completed final sign-off Nov 2025 | 101 02nd St | Source Planning And Construction Inc | 8/fl- suite 825 and 850- involves modification of (e) ti to include selective construction and demo of non load bearing partitions. modification to (e) ceiling grid and tile, light fixtures, relocation and (n) inlcuding re switching, (n) office doors, and grames, salvage and reuse of (e) selectedDetails
8/fl- suite 825 and 850- involves modification of (e) ti to include selective construction and demo of non load bearing partitions. modification to (e) ceiling grid and tile, light fixtures, relocation and (n) inlcuding re switching, (n) office doors, and grames, salvage and reuse of (e) selected | $225,000 |
| Dec 18, 2024 | In progress issued Dec 2024 | 101 02nd St | Sabah International Incorporated | 3rd floor. this is a fire alarm tenant improvement project add (1) new booster power supply with sync module add (2) ceiling-mounted led strobes. ref#: 202410314097Details
3rd floor. this is a fire alarm tenant improvement project add (1) new booster power supply with sync module add (2) ceiling-mounted led strobes. ref#: 202410314097 | $12,590 |
| Dec 18, 2024 | Completed final sign-off Mar 2025 | 101 02nd St | Source Planning And Construction Inc | 3/fl- rev 202410314097- provide (n) lighting and branch cirutiing to (e) panel . provided (n) power signal and branch circuitng to (e) panel. provide title 24 compliance formsDetails
3/fl- rev 202410314097- provide (n) lighting and branch cirutiing to (e) panel . provided (n) power signal and branch circuitng to (e) panel. provide title 24 compliance forms | $225,000 |
| Dec 16, 2024 | Completed final sign-off Mar 2025 | 101 02nd St | Source Planning And Construction Inc | 3/f: selective demo and cap. install new cooling only vav terminal units. install new air distribution and ductwork. relocate t-stat per new floor plan. air balance area of work. ref ti permit 202410314097.Details
3/f: selective demo and cap. install new cooling only vav terminal units. install new air distribution and ductwork. relocate t-stat per new floor plan. air balance area of work. ref ti permit 202410314097. | $90,000 |
| Dec 12, 2024 | Completed final sign-off Mar 2025 | 101 02nd St | Source Planning And Construction Inc | 3rd/f revision to 202410314097: modification of drinking fountain locationDetails
3rd/f revision to 202410314097: modification of drinking fountain location | |
| Nov 8, 2024 | In progress issued Nov 2024 | 101 02nd St | Golden Gate Fire Protection Inc | 3/fl-ref ti 202410314097- fire sprinkler to relocate 30 pendants replace 19 pendants with uprights, delete 12 pendents and add 2 pendentsDetails
3/fl-ref ti 202410314097- fire sprinkler to relocate 30 pendants replace 19 pendants with uprights, delete 12 pendents and add 2 pendents | $15,750 |
| Oct 31, 2024 | Completed final sign-off Mar 2025 | 101 02nd St | Source Planning And Construction Inc | 3rd fl ti: construction of non load bearing partitions. modification of (e) ceiling grid & tile, new light fixtures & relocation. new office doors & frames, millwork, finishes & sinks. life safety sep permits. mep deferred. ref demo permit 202410152909Details
3rd fl ti: construction of non load bearing partitions. modification of (e) ceiling grid & tile, new light fixtures & relocation. new office doors & frames, millwork, finishes & sinks. life safety sep permits. mep deferred. ref demo permit 202410152909 | $750,000 |
| Oct 15, 2024 | Completed final sign-off Nov 2024 | 101 02nd St | Source Planning And Construction Inc | 3/fl- selective demo of non load bearing partitions portion of (e) ceiling grid and tile light fixture (e) millwork and finishes. demo work only. ab-017.Details
3/fl- selective demo of non load bearing partitions portion of (e) ceiling grid and tile light fixture (e) millwork and finishes. demo work only. ab-017. | $15,000 |
| May 14, 2024 | Completed final sign-off Sep 2024 | 101 02nd St | Sabah International Incorporated | fire alarm tenant improvement project. new notification appliances will be tied into new power supply as shown on drawings. exist notification appiances replaced by new will be connected to new.Details
fire alarm tenant improvement project. new notification appliances will be tied into new power supply as shown on drawings. exist notification appiances replaced by new will be connected to new. | $32,985 |
| Apr 30, 2024 | Completed final sign-off May 2024 | 101 02nd St | Pioneer Fire Inc. | ti 202403077321- 5/fl- fire only relocate (63) pendents, add (11) pendents, remove (2) pendentsDetails
ti 202403077321- 5/fl- fire only relocate (63) pendents, add (11) pendents, remove (2) pendents | $11,100 |
| Mar 26, 2024 | Completed final sign-off Nov 2024 | 101 02nd St | Source Planning And Construction Inc | 5th fl reference ti 202403077321. mech, electrical, plumbingDetails
5th fl reference ti 202403077321. mech, electrical, plumbing | $142,670 |
| Mar 7, 2024 | Completed final sign-off Nov 2024 | 101 02nd St | Source Planning And Construction Inc | 5th fl tenant improvement. mep defferredDetails
5th fl tenant improvement. mep defferred | $758,000 |
| Mar 5, 2024 | Completed final sign-off Apr 2024 | 101 02nd St | Sabah International Incorporated | 10/f: as built permit 202310037869. revised (2) wall mounted speaker strobes - 10/f. add (1) control relay - 1/f. add (1) dual input module - 1/f. add (1) riser module - 1/f.Details
10/f: as built permit 202310037869. revised (2) wall mounted speaker strobes - 10/f. add (1) control relay - 1/f. add (1) dual input module - 1/f. add (1) riser module - 1/f. | |
| Nov 20, 2023 | Completed final sign-off Dec 2023 | 585 Mission St | t.i. to (e) fire sprinkler system. relocated sprinkler 8, add sprinklers 6, remove 2. ref t.i. pa202308184774.Details
t.i. to (e) fire sprinkler system. relocated sprinkler 8, add sprinklers 6, remove 2. ref t.i. pa202308184774. | $14,000 | |
| Nov 8, 2023 | Completed final sign-off Mar 2024 | 101 02nd St | Sabah International Incorporated | ref 202302222355. provide a modification of the (e) fire alarm system. relocate (1) manuel pull station on 1st fl. demo 2 (e) speaker strobes. add 1 new booster power supply.Details
ref 202302222355. provide a modification of the (e) fire alarm system. relocate (1) manuel pull station on 1st fl. demo 2 (e) speaker strobes. add 1 new booster power supply. | $16,375 |
| Oct 4, 2023 | Completed final sign-off Nov 2023 | 101 02nd St | Maguire Inc Dba Lahue And Associates | installation of evacuation maps on level 25Details
installation of evacuation maps on level 25 | $2,000 |
| Oct 3, 2023 | Completed final sign-off Apr 2024 | 101 02nd St | Sabah International Incorporated | 10/f: provide modification of the existing fire alarm system, ref ti pa# 202309086144.Details
10/f: provide modification of the existing fire alarm system, ref ti pa# 202309086144. | $28,005 |
| Sep 8, 2023 | Completed final sign-off Nov 2023 | 101 02nd St | 10/f:t.i. improvement for the sprinkler per the new rsp and floor layout, new sprinkler head 19, delete sprinkler heads 2, relocate 43 heads, existing sprinkler 83. ref pa# 2023-0726-2989.Details
10/f:t.i. improvement for the sprinkler per the new rsp and floor layout, new sprinkler head 19, delete sprinkler heads 2, relocate 43 heads, existing sprinkler 83. ref pa# 2023-0726-2989. | $18,500 | |
| Aug 29, 2023 | Completed final sign-off Sep 2023 | 101 02nd St | Sabah International Incorporated | relocate the (e) smoke detector at the passenger elevator lobby to the high point ceiling of the passenger elevator lobby as shown on the drawings. ref 202305047064.Details
relocate the (e) smoke detector at the passenger elevator lobby to the high point ceiling of the passenger elevator lobby as shown on the drawings. ref 202305047064. | $8,080 |
| Aug 18, 2023 | Never finaled issued Sep 2023, no final | 585 Mission St | Skyline Construction | ste 100c - tenant improvement for a bank branch including new millwork for transactions done at new atm.Details
ste 100c - tenant improvement for a bank branch including new millwork for transactions done at new atm. | $250,000 |
| Aug 15, 2023 | Never finaled issued Aug 2023, no final | 101 02nd St | Sabah International Incorporated | 25/f: provide modification of existing fire alarm system, ref pa# 2023-0524-8518Details
25/f: provide modification of existing fire alarm system, ref pa# 2023-0524-8518 | $22,617 |
| Jul 26, 2023 | Completed final sign-off Jul 2024 | 101 02nd St | Skyline Construction | 10th floor: interior t.i of existing office space. consist of non structural partitons, office front glazing system, restroom finishes, mep systems.Details
10th floor: interior t.i of existing office space. consist of non structural partitons, office front glazing system, restroom finishes, mep systems. | $500,000 |
| Jul 24, 2023 | Completed final sign-off Sep 2023 | 101 02nd St | 25/f: installation of new fire sprinklers to the new proposed ceiling layout as shown on plans. ref pa# 202305248518.Details
25/f: installation of new fire sprinklers to the new proposed ceiling layout as shown on plans. ref pa# 202305248518. | $27,000 | |
| Jun 30, 2023 | Completed final sign-off Nov 2023 | 101 02nd St | Source Planning And Construction Inc | replace (e) corridor lighting and controls to be t24 completed new lighting in elevator and restroom. added power for card readersDetails
replace (e) corridor lighting and controls to be t24 completed new lighting in elevator and restroom. added power for card readers | $58,000 |
| Jun 21, 2023 | Completed final sign-off Jul 2023 | 101 02nd St | Pioneer Fire Inc. | relocate 2 pendents. t.i. pa 202305047064.Details
relocate 2 pendents. t.i. pa 202305047064. | $500 |
| May 24, 2023 | Completed final sign-off Oct 2024 | 101 02nd St | Skyline Construction | 25 floor: office tenant improvement for approximately 12000 sqft of the 25th floor, including 2 new new gender neutral restroomsDetails
25 floor: office tenant improvement for approximately 12000 sqft of the 25th floor, including 2 new new gender neutral restrooms | $1,200,000 |
| May 23, 2023 | Completed final sign-off Nov 2023 | 101 02nd St | Source Planning And Construction Inc | revision to 202302222355 revised structural detailsDetails
revision to 202302222355 revised structural details | |
| May 23, 2023 | Never finaled issued May 2023, no final | 585 Mission St | per pa #202302222355, add address to new storefront on apn 3721/089 as; 585 mission streetDetails
per pa #202302222355, add address to new storefront on apn 3721/089 as; 585 mission street | ||
| May 4, 2023 | Completed final sign-off Nov 2023 | 101 02nd St | Source Planning And Construction Inc | 16th fl modification of e elevator lobby and corridor and restrooms. improvements include selective demo and construction of non load bearing partitions. new ceiling tiles in e ceiling grids. new light fix,flooring, finishesDetails
16th fl modification of e elevator lobby and corridor and restrooms. improvements include selective demo and construction of non load bearing partitions. new ceiling tiles in e ceiling grids. new light fix,flooring, finishes | $375,000 |
| Mar 20, 2023 | Completed final sign-off Apr 2023 | 101 02nd St | Sabah International Incorporated | 22/f:as-built to pa# 202208251221, changes made to system design during installtion of the 22nd flr t.i., add 1-new smoke detector (room# 22002 & 22033).Details
22/f:as-built to pa# 202208251221, changes made to system design during installtion of the 22nd flr t.i., add 1-new smoke detector (room# 22002 & 22033). | |
| Feb 23, 2023 | Completed final sign-off Mar 2023 | 101 02nd St | Pioneer Fire Inc. | 1/f suite 100 & 100c: as built fire sprinklers, ref pa# 202302091667 & t.i. 202212017495Details
1/f suite 100 & 100c: as built fire sprinklers, ref pa# 202302091667 & t.i. 202212017495 | |
| Feb 22, 2023 | Completed final sign-off Nov 2023 | 101 02nd St | Source Planning And Construction Inc | unit 100c: new recessed entry/exit alcove, new storefront on mission street, new entry door, sidelight, modificaiton to street level facade @ alcove, minor concrete flatwork & finish at alcoveDetails
unit 100c: new recessed entry/exit alcove, new storefront on mission street, new entry door, sidelight, modificaiton to street level facade @ alcove, minor concrete flatwork & finish at alcove | $250,000 |
| Feb 9, 2023 | Completed final sign-off Mar 2023 | 101 02nd St | Pioneer Fire Inc. | convert 71 pendent sprinklers to upright configuration. remove 4 pendent sprinkler heads. ref pa 2022-1201-7495Details
convert 71 pendent sprinklers to upright configuration. remove 4 pendent sprinkler heads. ref pa 2022-1201-7495 | $9,900 |
| Dec 6, 2022 | Completed final sign-off Dec 2022 | 101 02nd St | Sabah International Incorporated | ref pa# 202209202740, as-built permit.Details
ref pa# 202209202740, as-built permit. | |
| Dec 6, 2022 | Completed final sign-off May 2023 | 101 02nd St | Source Planning And Construction Inc | suite 100c: demolition of non-load bearing partitions, light fixtures and finishes. new light fixtures/switching and new finishes. mep deferred.Details
suite 100c: demolition of non-load bearing partitions, light fixtures and finishes. new light fixtures/switching and new finishes. mep deferred. | $85,000 |
| Dec 1, 2022 | Completed final sign-off May 2023 | 101 02nd St | Source Planning And Construction Inc | ste #100 a & b: work includes selective demolition of non-bearing partitions, lightings and finishes, construction of new demising partitions, new light fixtures/ switches and new finishes.Details
ste #100 a & b: work includes selective demolition of non-bearing partitions, lightings and finishes, construction of new demising partitions, new light fixtures/ switches and new finishes. | $150,000 |
| Sep 20, 2022 | Completed final sign-off Dec 2022 | 101 02nd St | Sabah International Incorporated | 21/f: provide modification of existing fa system. ref 202205124159. add (1) booster power supply, (1) constrol relays, (1) synchronization output modules, (9) ceiling speaker/strobes and 19 wall speaker/strobes.Details
21/f: provide modification of existing fa system. ref 202205124159. add (1) booster power supply, (1) constrol relays, (1) synchronization output modules, (9) ceiling speaker/strobes and 19 wall speaker/strobes. | $54,205 |
| Aug 25, 2022 | Completed final sign-off Apr 2023 | 101 02nd St | Sabah International Incorporated | provide modification of (e) fire alarm system . add booster power supply , (13) duct smoke det. (13) control relays (1) sync output modules, (1) ceiling strobe, (32) ceiling speaker/strobes and (6) wall speaker/strobes.Details
provide modification of (e) fire alarm system . add booster power supply , (13) duct smoke det. (13) control relays (1) sync output modules, (1) ceiling strobe, (32) ceiling speaker/strobes and (6) wall speaker/strobes. | $54,205 |
| Aug 25, 2022 | Completed final sign-off Oct 2022 | 101 02nd St | Sabah International Incorporated | ti ref pa 202205124159 and 202205134215. add (3) new two way emergency communication call boxes to an existing system. emergency call stations will be installed on 21st fl passenger elev. lobby and service and 22nd fl service elevator .Details
ti ref pa 202205124159 and 202205134215. add (3) new two way emergency communication call boxes to an existing system. emergency call stations will be installed on 21st fl passenger elev. lobby and service and 22nd fl service elevator . | $14,750 |
| Aug 23, 2022 | Completed final sign-off Jan 2023 | 101 02nd St | Sabah International Incorporated | 24/f: ti#202205033424. modify (e) f/a system, add (1) single signature driver controller, (1) booster power supply, (16) duct smoke detectors, (17) high power control relays, (1) sync output module, (1) led ceiling strobers, (30) led ceiling speaker/strobes, (7) led wall speaker/strobesDetails
24/f: ti#202205033424. modify (e) f/a system, add (1) single signature driver controller, (1) booster power supply, (16) duct smoke detectors, (17) high power control relays, (1) sync output module, (1) led ceiling strobers, (30) led ceiling speaker/strobes, (7) led wall speaker/strobes | $39,845 |
| Aug 23, 2022 | Expired or cancelled cancelled Jan 2026 | 101 02nd St | 2/f: non-structural demo. new non-structural partitions, door/frame/hardware, millwork, finishes. no change in occupancy, use or area. mep included in the set. life safety and sprinklers under separate permit.Details
2/f: non-structural demo. new non-structural partitions, door/frame/hardware, millwork, finishes. no change in occupancy, use or area. mep included in the set. life safety and sprinklers under separate permit. | $211,514 | |
| Aug 1, 2022 | Never finaled issued Aug 2022, no final | 101 02nd St | Golden Gate Fire Protection Inc | 24/f: relocate 111 fire sprinkler pendents, 17 concearled pendents and 2 uprights on the 24rd floor. ref t.i. pa202205033424Details
24/f: relocate 111 fire sprinkler pendents, 17 concearled pendents and 2 uprights on the 24rd floor. ref t.i. pa202205033424 | $68,250 |
| Aug 1, 2022 | Completed final sign-off Sep 2022 | 101 02nd St | Golden Gate Fire Protection Inc | 23/f: relocate 114 fire sprinkler pendents, 11 concearled pendents and 4 uprights on the 23rd floor. ref t.i. pa202205033426Details
23/f: relocate 114 fire sprinkler pendents, 11 concearled pendents and 4 uprights on the 23rd floor. ref t.i. pa202205033426 | $67,725 |
| Jul 22, 2022 | Completed final sign-off Oct 2022 | 101 02nd St | Ayoob & Peery Plumbing Co Inc | 21st & 22nd fl: add & relocate sprinklers as neccesary in accordamce with t.i.. install pipe hangers as needed for new sprinkler pipe.Details
21st & 22nd fl: add & relocate sprinklers as neccesary in accordamce with t.i.. install pipe hangers as needed for new sprinkler pipe. | $87,720 |
| Jul 21, 2022 | Completed final sign-off Jan 2023 | 101 02nd St | Sabah International Incorporated | 23/f: provide modification to (e) fire alarm system add 1 booster power supply, 17 duct detector smoke, 18 control relays, 1 sync output module, 5 ceiling strobes, 29 ceiling speakers/strobes, and 8 wall speaker/strobes add 2 new two-way emergency communcation call boxes to (e) systemDetails
23/f: provide modification to (e) fire alarm system add 1 booster power supply, 17 duct detector smoke, 18 control relays, 1 sync output module, 5 ceiling strobes, 29 ceiling speakers/strobes, and 8 wall speaker/strobes add 2 new two-way emergency communcation call boxes to (e) system | $36,395 |
| Jul 20, 2022 | Completed final sign-off Sep 2022 | 101 02nd St | Sabah International Incorporated | 2nd floor: voluntary modify extg fire alarm system. add one new control relay for access control override.Details
2nd floor: voluntary modify extg fire alarm system. add one new control relay for access control override. | $11,840 |
| Jul 11, 2022 | Never finaled issued Aug 2022, no final | 101 02nd St | Clune Construction Company L P | 23/f: revision to bpa#202205033426 to include selective demo, construction of an employee breakroom/pantry, casework, finishes, ceiling, lighting, electrical, & mechanicalDetails
23/f: revision to bpa#202205033426 to include selective demo, construction of an employee breakroom/pantry, casework, finishes, ceiling, lighting, electrical, & mechanical | |
| Jul 11, 2022 | Never finaled issued Aug 2022, no final | 101 02nd St | Clune Construction Company L P | 24/f: revision to bpa#202205033424 to include selective demo, construction of an employee breakroom/pantry, casework, finishes, ceiling, lighting, electrical, & mechanicalDetails
24/f: revision to bpa#202205033424 to include selective demo, construction of an employee breakroom/pantry, casework, finishes, ceiling, lighting, electrical, & mechanical | |
| May 19, 2022 | Completed final sign-off Jun 2022 | 101 02nd St | Sabah International Incorporated | 22nd fl: modify (e) fire system. demo 9 speaker/ strobes, 5 strobes, 7 speakers, 2 smoke detectors, 1 control relay. ref pa# 202203240808.Details
22nd fl: modify (e) fire system. demo 9 speaker/ strobes, 5 strobes, 7 speakers, 2 smoke detectors, 1 control relay. ref pa# 202203240808. | $7,000 |
| May 13, 2022 | Completed final sign-off Apr 2023 | 101 02nd St | Bcci Construction Company | 22nd fl: full floor t.i. structural work at new skyfold partitions. add 2 new fsd's.Details
22nd fl: full floor t.i. structural work at new skyfold partitions. add 2 new fsd's. | $750,000 |
| May 12, 2022 | Completed final sign-off Mar 2023 | 101 02nd St | Bcci Construction Company | 21st fl: partial floor tenant improvement. mep included. ref # 202108176536Details
21st fl: partial floor tenant improvement. mep included. ref # 202108176536 | $210,000 |
| May 3, 2022 | Completed final sign-off May 2023 | 101 02nd St | Clune Construction Company L P | 24th fl: office tenant improvement to include selective demolition, construction of employee breakroom / panyry. new non-structural partitions, finishes, ceiling, lighting, electrical and mechanical.Details
24th fl: office tenant improvement to include selective demolition, construction of employee breakroom / panyry. new non-structural partitions, finishes, ceiling, lighting, electrical and mechanical. | $1,670,000 |
| May 3, 2022 | Completed final sign-off May 2023 | 101 02nd St | Clune Construction Company L P | 23rd fl: office tenant improvement to include selective demolition, construction of employee breakroom/pantry. new non-structural partitions, finishes, ceiling, lighting, electrical and mechanical.Details
23rd fl: office tenant improvement to include selective demolition, construction of employee breakroom/pantry. new non-structural partitions, finishes, ceiling, lighting, electrical and mechanical. | $1,670,000 |
| Apr 19, 2022 | Completed final sign-off Aug 2022 | 101 02nd St | voluntary elevator modification. remove 10 (e) pendent sprinklers from low rise mech. remove 8 (e) upright sprinklers in high rise mech per sffd letter dated 2/14/2022.Details
voluntary elevator modification. remove 10 (e) pendent sprinklers from low rise mech. remove 8 (e) upright sprinklers in high rise mech per sffd letter dated 2/14/2022. | $1,000 | |
| Mar 24, 2022 | Completed final sign-off Jun 2022 | 101 02nd St | Bcci Construction Company | 21st and 22nd full floors demo only of interior office space per ab017 sprinkler permit 202203220598Details
21st and 22nd full floors demo only of interior office space per ab017 sprinkler permit 202203220598 | $50,000 |
| Mar 22, 2022 | Completed final sign-off Jun 2022 | 101 02nd St | Ayoob & Peery Plumbing Co Inc | demo 22nd flr - flip 103 sprinklers to upright per ti job 22-625.Details
demo 22nd flr - flip 103 sprinklers to upright per ti job 22-625. | $23,175 |
| Feb 25, 2022 | Completed final sign-off Apr 2022 | 101 02nd St | Golden Gate Fire Protection Inc | fire sprinkler relocate 113 upright sprinklers on the 25th floorDetails
fire sprinkler relocate 113 upright sprinklers on the 25th floor | $56,500 |
| Feb 15, 2022 | Completed final sign-off Mar 2022 | 101 02nd St | Golden Gate Fire Protection Inc | 23/f: fire sprinklers: relocate 113 upright spirnklers on 23/f floor.Details
23/f: fire sprinklers: relocate 113 upright spirnklers on 23/f floor. | $56,500 |
| Feb 4, 2022 | Completed final sign-off Mar 2022 | 101 02nd St | Source Planning And Construction Inc | 23/f: selective demolition of non-load bearing partitions ceiling, light fixtures, millwork and finishes. ab-017. building is fully sprinklered.Details
23/f: selective demolition of non-load bearing partitions ceiling, light fixtures, millwork and finishes. ab-017. building is fully sprinklered. | |
| Feb 4, 2022 | Completed final sign-off Apr 2022 | 101 02nd St | Source Planning And Construction Inc | 25/f: selective demolition of non-load bearing partitions ceiling, light fixtures, millwork and finishes. ab-017. building is fully sprinklered. bldg permit 202202258711Details
25/f: selective demolition of non-load bearing partitions ceiling, light fixtures, millwork and finishes. ab-017. building is fully sprinklered. bldg permit 202202258711 | |
| Jan 21, 2022 | Completed final sign-off Jan 2022 | 101 02nd St | Siemens Industry, Inc. | suite 200: fire only work to obrain as-built permit for the "suite 200" remodel on floor 2. 7 fuct detectors were added and 3 were relocated from initial lift safety permit pa# 202103045876Details
suite 200: fire only work to obrain as-built permit for the "suite 200" remodel on floor 2. 7 fuct detectors were added and 3 were relocated from initial lift safety permit pa# 202103045876 | $11,095 |
| Dec 23, 2021 | Completed final sign-off Dec 2021 | 101 02nd St | Siemens Industry, Inc. | fire only permit for "as-built" installation on the floor 18 "reed smith" remodel, original life safety permit ref pa #202108317443Details
fire only permit for "as-built" installation on the floor 18 "reed smith" remodel, original life safety permit ref pa #202108317443 | |
| Dec 10, 2021 | Completed final sign-off Mar 2022 | 101 02nd St | Source Planning And Construction Inc | 22nd fl restroom work, demo and construction of toilet partitions, new plumbing and finishesDetails
22nd fl restroom work, demo and construction of toilet partitions, new plumbing and finishes | $31,000 |
| Oct 13, 2021 | Completed final sign-off Apr 2022 | 101 02nd St | Sabah International Incorporated | replace (e) siemens f/a control unit w/new est-3 addressable f/a control unit. all (e) f/a initiating field devices shall be replaced like-for-like. no new cellular communicator panel provided.Details
replace (e) siemens f/a control unit w/new est-3 addressable f/a control unit. all (e) f/a initiating field devices shall be replaced like-for-like. no new cellular communicator panel provided. | $279,775 |
| Oct 8, 2021 | Never finaled issued Oct 2021, no final | 101 02nd St | Skyline Construction | install four (4) evac signage. ref #2021-0611-2248Details
install four (4) evac signage. ref #2021-0611-2248 | $750 |
| Aug 31, 2021 | Completed final sign-off Dec 2021 | 101 02nd St | Siemens Industry, Inc. | 18th floor: fire only work for reed smith remodel on floor 18, 5 speaker strobes, 1 strobe, 1 module added, relocation 1 smoket detector and module. ref 202106112248Details
18th floor: fire only work for reed smith remodel on floor 18, 5 speaker strobes, 1 strobe, 1 module added, relocation 1 smoket detector and module. ref 202106112248 | $4,500 |
| Aug 17, 2021 | Never finaled issued Aug 2021, no final | 101 02nd St | Sabah International Incorporated | 2 new two-way comm systemntrol unit at 1/f, (1) main control unit at 14/f; (1) master consle at 1/f fcc room, (1) telephone interface; (2) relay isolation module & (12) remote call stations. maher n/a.Details
2 new two-way comm systemntrol unit at 1/f, (1) main control unit at 14/f; (1) master consle at 1/f fcc room, (1) telephone interface; (2) relay isolation module & (12) remote call stations. maher n/a. | $30,000 |
| Aug 2, 2021 | Completed final sign-off Oct 2021 | 101 02nd St | Golden Gate Fire Protection Inc | fire sprinklers relocate 23 pendent sprinkers and relocate 2 uprights on 18th fl ref 202107063759 and 202106112248Details
fire sprinklers relocate 23 pendent sprinkers and relocate 2 uprights on 18th fl ref 202107063759 and 202106112248 | $13,125 |
| Jul 6, 2021 | Completed final sign-off Jan 2022 | 101 02nd St | Skyline Construction | 18th floor:revision to pa #2021-0611-2248. occupancy load change count.Details
18th floor:revision to pa #2021-0611-2248. occupancy load change count. | |
| Jun 14, 2021 | Never finaled issued Jun 2021, no final | 101 02nd St | Pioneer Fire Inc. | as-built submiital to permit #2020-0429-9601 add 1 upright sprinkler in new closet at lowrise elevator lobby.Details
as-built submiital to permit #2020-0429-9601 add 1 upright sprinkler in new closet at lowrise elevator lobby. | |
| Jun 11, 2021 | Completed final sign-off Jan 2022 | 101 02nd St | Skyline Construction | 18th flr - construction of non-structural partitions. office front glazing system. acoustical grid tile & gyp board ceilings, light fixtures, millwork restroom finishes. mep included.Details
18th flr - construction of non-structural partitions. office front glazing system. acoustical grid tile & gyp board ceilings, light fixtures, millwork restroom finishes. mep included. | |
| Apr 29, 2021 | Completed final sign-off Jul 2021 | 101 02nd St | Pioneer Fire Inc. | as built to fire permit 2021-0225-5388. add 4 concealed sprinkler heads in elevator lobby gc t!# 2021-0108-2353Details
as built to fire permit 2021-0225-5388. add 4 concealed sprinkler heads in elevator lobby gc t!# 2021-0108-2353 | |
| Apr 12, 2021 | Expired or cancelled cancelled Jan 2026 | 101 02nd St | Source Planning And Construction Inc | ste 200: revision to pa# 202101082353. new finishes, millwork & lighting in men's & women's accessible restrooms & elevator lobby.Details
ste 200: revision to pa# 202101082353. new finishes, millwork & lighting in men's & women's accessible restrooms & elevator lobby. | $150,000 |
| Mar 4, 2021 | Completed final sign-off Sep 2021 | 101 02nd St | Siemens Industry, Inc. | fire only work for the "suite 200 remodel on floor 2; additions are 4 smoke detectors, 3 duct detectors, 1 module, 2 speakers, 21 speaker/strobes, 4 strobes, and 1 strobe power supply. ref permit app # 2021 0108 2353Details
fire only work for the "suite 200 remodel on floor 2; additions are 4 smoke detectors, 3 duct detectors, 1 module, 2 speakers, 21 speaker/strobes, 4 strobes, and 1 strobe power supply. ref permit app # 2021 0108 2353 | $26,180 |
| Feb 25, 2021 | Completed final sign-off Jun 2021 | 101 02nd St | Pioneer Fire Inc. | relocate (19) pendent sprinklers, (16) upright sprinklers, (87) pendents converted to upright sprinklers, remove (30) pendents. gc ti# 2021 0108 2353Details
relocate (19) pendent sprinklers, (16) upright sprinklers, (87) pendents converted to upright sprinklers, remove (30) pendents. gc ti# 2021 0108 2353 | |
| Jan 27, 2021 | Completed final sign-off May 2021 | 101 02nd St | Skyline Construction | installation of 4 evac signs for the 17th floor.Details
installation of 4 evac signs for the 17th floor. | $1,200 |
| Jan 8, 2021 | Completed final sign-off Feb 2022 | 101 02nd St | Source Planning And Construction Inc | suite 200 - t.i. modification include selective demo & contruction of non-load partitions, new doors, frames, new ceiling grid, light fixture, millwork & finishDetails
suite 200 - t.i. modification include selective demo & contruction of non-load partitions, new doors, frames, new ceiling grid, light fixture, millwork & finish | $2,010,000 |
| Dec 24, 2020 | Completed final sign-off Apr 2021 | 101 02nd St | Bilcor Inc | fire life safety: install (2) two-way call station on 17th fl reference ti: 2020-0901-3207, 2020-1208-0529.Details
fire life safety: install (2) two-way call station on 17th fl reference ti: 2020-0901-3207, 2020-1208-0529. | $1,320 |
| Dec 17, 2020 | Completed final sign-off Mar 2021 | 101 02nd St | Golden Gate Fire Protection Inc | fire sprinkler only. ref # 2020-0901-3207. relocate 68 pendents & 1 upright for reed smith 17th floorDetails
fire sprinkler only. ref # 2020-0901-3207. relocate 68 pendents & 1 upright for reed smith 17th floor | $34,500 |
| Dec 8, 2020 | Completed final sign-off Jun 2021 | 101 02nd St | Siemens Industry, Inc. | fire alarm work for the reed smith remodel on floor 17; additions are 5 smoke detectors, 1 strobe power supply, 3 speakers, 24 speaker/strobes, and 2 strobes. ref. permit app #2020-0901-3207.Details
fire alarm work for the reed smith remodel on floor 17; additions are 5 smoke detectors, 1 strobe power supply, 3 speakers, 24 speaker/strobes, and 2 strobes. ref. permit app #2020-0901-3207. | $23,000 |
| Sep 1, 2020 | Completed final sign-off Jun 2021 | 101 02nd St | Skyline Construction | 17/f: new non-structural partitions, office front glazing system, acoustical grid & tile and byp board ceilings, light fixtures, mikllwork, restroom finishes/partitions/fixtures & overall finishes. mep included.Details
17/f: new non-structural partitions, office front glazing system, acoustical grid & tile and byp board ceilings, light fixtures, mikllwork, restroom finishes/partitions/fixtures & overall finishes. mep included. | |
| Aug 18, 2020 | Completed final sign-off Mar 2021 | 101 02nd St | Skyline Construction | 4 evac signs for 20th flrDetails
4 evac signs for 20th flr | $1,500 |
| Aug 5, 2020 | Completed final sign-off Aug 2020 | 101 02nd St | Bilcor Inc | 20th floor: fire life safety: install 2 two way call station. ref app#202002033392Details
20th floor: fire life safety: install 2 two way call station. ref app#202002033392 | $1,320 |
| Jul 17, 2020 | Never finaled issued Aug 2020, no final | 101 02nd St | Golden Gate Fire Protection Inc | fire sprinklers: relocate 63 pendents, 17 concealed pendents and 3 upright on the 20/fDetails
fire sprinklers: relocate 63 pendents, 17 concealed pendents and 3 upright on the 20/f | $41,500 |
| Jul 16, 2020 | Completed final sign-off Aug 2020 | 101 02nd St | Siemens Industry, Inc. | fire alarm work for the "reed smith" remodel on 20/f; additions are 3 smoke detectors, 1 duct detector, 1 strobe supply, 7 speakers, 21 speaker/strobes, and 2 strobes; ref bldg pa# 202002033392.Details
fire alarm work for the "reed smith" remodel on 20/f; additions are 3 smoke detectors, 1 duct detector, 1 strobe supply, 7 speakers, 21 speaker/strobes, and 2 strobes; ref bldg pa# 202002033392. | $24,800 |
| Jun 12, 2020 | Never finaled filed Jun 2020, never issued | 101 02nd St | Bilcor Inc | 20/f: fire life safety:-install (2) two-way call stations. reference ti#: 2020-0203-3392Details
20/f: fire life safety:-install (2) two-way call stations. reference ti#: 2020-0203-3392 | $1,320 |
| May 4, 2020 | Never finaled issued May 2020, no final | 101 02nd St | Siemens Industry, Inc. | 4th floor: fire alarm additions of 2 speaker/strobes for the conference room remodels. reference pa #2020-0220-4943Details
4th floor: fire alarm additions of 2 speaker/strobes for the conference room remodels. reference pa #2020-0220-4943 | $1,270 |
| Apr 29, 2020 | Completed final sign-off Mar 2021 | 101 02nd St | Skyline Construction | emergency evacuation signage. providing the 19th floor of 101 2nd street, four (4) emergency evacuation signs.Details
emergency evacuation signage. providing the 19th floor of 101 2nd street, four (4) emergency evacuation signs. | $1,500 |
| Mar 10, 2020 | Completed final sign-off Oct 2020 | 101 02nd St | Golden Gate Fire Protection Inc | fire sprinkler only for 4th fl - relocate 2 pendents; add 1 for rocket lawyer suite #400. ref pa #202002204943.Details
fire sprinkler only for 4th fl - relocate 2 pendents; add 1 for rocket lawyer suite #400. ref pa #202002204943. | $1,500 |
| Mar 4, 2020 | Completed final sign-off May 2020 | 101 02nd St | 6th fl evacuation plan (4 total)Details
6th fl evacuation plan (4 total) | $2,000 | |
| Feb 21, 2020 | Completed final sign-off Jun 2021 | 101 02nd St | Skyline Construction | revisiion to pa#201911126952 for 19/f - reinstate card readers at elevator lobbies. two-way comm defered pa#202002194773.Details
revisiion to pa#201911126952 for 19/f - reinstate card readers at elevator lobbies. two-way comm defered pa#202002194773. | |
| Feb 20, 2020 | Never finaled issued Feb 2020, no final | 101 02nd St | Skyline Construction | revision 2010911217863 to install 2 way communication system and card readers to comply with 10101.9.13 maher not reqDetails
revision 2010911217863 to install 2 way communication system and card readers to comply with 10101.9.13 maher not req | |
| Feb 20, 2020 | Completed final sign-off Jun 2020 | 101 02nd St | Source Planning And Construction Inc | this t.i. project involves modification of an extg tenant suite to include construction of non-load bearing partitions, nw doors & frames, new lighting & controls, new millwork and new finishes.Details
this t.i. project involves modification of an extg tenant suite to include construction of non-load bearing partitions, nw doors & frames, new lighting & controls, new millwork and new finishes. | $125,000 |
| Feb 19, 2020 | Completed final sign-off Jan 2022 | 101 02nd St | Bilcor Inc | ref pa# 201911126952; fire alarm: install (2) two way call station, install 1 line fault monitor n/a maherDetails
ref pa# 201911126952; fire alarm: install (2) two way call station, install 1 line fault monitor n/a maher | $1,980 |
| Feb 19, 2020 | Expired or cancelled cancelled Jan 2026 | 101 02nd St | Matrix Hg Inc | suite 800: install water source heat pump to serve existing idf closet.Details
suite 800: install water source heat pump to serve existing idf closet. | $39,408 |
| Feb 13, 2020 | Completed final sign-off Apr 2020 | 101 02nd St | Bilcor Inc | ref pa# 201911217863; fire alarm ti: install (2) two-way call stations, install (1) line fault monitor on the 6/f elev lobby. fire alarm for monitoring call boxes under sep permit.Details
ref pa# 201911217863; fire alarm ti: install (2) two-way call stations, install (1) line fault monitor on the 6/f elev lobby. fire alarm for monitoring call boxes under sep permit. | $1,980 |
| Feb 7, 2020 | Completed final sign-off Apr 2020 | 101 02nd St | Siemens Industry, Inc. | ref pa# 201911217863; fire alarm work for the "hashicorp" remodel on floor 6; additions are 5 smoke detectors, 11 duct detectores, 1 strobe power supply, 33 speaker/strobes, and 10 speakersDetails
ref pa# 201911217863; fire alarm work for the "hashicorp" remodel on floor 6; additions are 5 smoke detectors, 11 duct detectores, 1 strobe power supply, 33 speaker/strobes, and 10 speakers | $48,630 |
| Feb 3, 2020 | Completed final sign-off May 2021 | 101 02nd St | Skyline Construction | 20/f -non-structural partitions, office front glazing system, accoustical grid & tile and gypsum boards ceilings, light fixtures, millwork, restroom finishes/partitions/fixtures and overall finishes. sprinkler, life safety, two way comm under sep permit.Details
20/f -non-structural partitions, office front glazing system, accoustical grid & tile and gypsum boards ceilings, light fixtures, millwork, restroom finishes/partitions/fixtures and overall finishes. sprinkler, life safety, two way comm under sep permit. | |
| Jan 31, 2020 | Completed final sign-off Apr 2020 | 101 02nd St | Siemens Industry, Inc. | fire alarm work for the reed smith remodel floor 19, additions are 6 smoke det, 2 duct detectors, 2 modules, 1 strobe, power supply, 6 speakers, 21 speaker strobes, 1 strobe, ref 201911126952Details
fire alarm work for the reed smith remodel floor 19, additions are 6 smoke det, 2 duct detectors, 2 modules, 1 strobe, power supply, 6 speakers, 21 speaker strobes, 1 strobe, ref 201911126952 | $26,600 |
| Jan 28, 2020 | Completed final sign-off Mar 2020 | 101 02nd St | Source Planning And Construction Inc | 24/f - selective demolition of non-load bearing partitions, ceilings, light fixtures, millwork and finishes// sprinklers on separate permit # 202001242697. ab-017 applies.Details
24/f - selective demolition of non-load bearing partitions, ceilings, light fixtures, millwork and finishes// sprinklers on separate permit # 202001242697. ab-017 applies. | $223,855 |
| Jan 24, 2020 | Completed final sign-off Apr 2020 | 101 02nd St | Pioneer Fire Inc. | return to shell conditionDetails
return to shell condition | $18,250 |
| Jan 14, 2020 | Completed final sign-off Apr 2020 | 101 02nd St | Golden Gate Fire Protection Inc | fire sprinkler only - relocate 77 pendents & relocate 4 uprights for reed smith, 19th fl.Details
fire sprinkler only - relocate 77 pendents & relocate 4 uprights for reed smith, 19th fl. | $40,000 |
| Dec 11, 2019 | Completed final sign-off Apr 2020 | 101 02nd St | Golden Gate Fire Protection Inc | 6/f: fire sprinkler only- relocate 50 pendents for hashicorp on the 6th fl. ref t.i. 201911217863. n/a maherDetails
6/f: fire sprinkler only- relocate 50 pendents for hashicorp on the 6th fl. ref t.i. 201911217863. n/a maher | $25,000 |
| Nov 21, 2019 | Completed final sign-off May 2020 | 101 02nd St | Skyline Construction | 6th floor ti: new construction includes interior partitions, ceilings, mep, caseworkDetails
6th floor ti: new construction includes interior partitions, ceilings, mep, casework | $1,100,000 |
| Nov 19, 2019 | Completed final sign-off Jun 2021 | 101 02nd St | Skyline Construction | installation of mobile file cabinet system and ups batter cabinet in server room at 19th fl. def submittal in appvd permit 201911126952Details
installation of mobile file cabinet system and ups batter cabinet in server room at 19th fl. def submittal in appvd permit 201911126952 | |
| Nov 12, 2019 | Completed final sign-off Jun 2021 | 101 02nd St | Skyline Construction | new non-structural partitons office front glazing system, accustical grid & tile & gyp board ceilings, light fixutes, millwork, restroom finishes, partion fixtures includes mep on the 19th fl. no changes to use exit stairs, egress path, elevator fire sprinkler & life safetyDetails
new non-structural partitons office front glazing system, accustical grid & tile & gyp board ceilings, light fixutes, millwork, restroom finishes, partion fixtures includes mep on the 19th fl. no changes to use exit stairs, egress path, elevator fire sprinkler & life safety | $8,250,000 |
| Nov 7, 2019 | Never finaled issued Nov 2019, no final | 101 02nd St | Skyline Construction | interior demo only. demo of non load beraing partitions, doors, millwork, finishes, ceilings & lighting. no exterior work. no hazmat. no structuralDetails
interior demo only. demo of non load beraing partitions, doors, millwork, finishes, ceilings & lighting. no exterior work. no hazmat. no structural | $75,600 |
| Nov 1, 2019 | Expired or cancelled cancelled Dec 2019 | 101 02nd St | Golden Gate Fire Protection Inc | 6th fl. demo plan for 101 2nd st. relocate pendants to uprights 124 countDetails
6th fl. demo plan for 101 2nd st. relocate pendants to uprights 124 count | $62,000 |
| Oct 17, 2019 | Completed final sign-off Oct 2019 | 101 02nd St | Ayoob & Peery Plumbing Co Inc | 8th fl as-built for pa#201909242550Details
8th fl as-built for pa#201909242550 | |
| Oct 4, 2019 | Completed final sign-off Oct 2019 | 101 02nd St | Siemens Industry, Inc. | fire alarm work for the "suite 850" remodel on floor 8; additions are 1 speaker/strobe as well as relocation of a speaker and speaker/strobe. maher naDetails
fire alarm work for the "suite 850" remodel on floor 8; additions are 1 speaker/strobe as well as relocation of a speaker and speaker/strobe. maher na | $1,270 |
| Oct 2, 2019 | Completed final sign-off Oct 2019 | 101 02nd St | C B 2 Builders Incorporated | mep only . ref 201909111311 arch.Details
mep only . ref 201909111311 arch. | $5,000 |
| Sep 24, 2019 | Completed final sign-off Oct 2019 | 101 02nd St | Ayoob & Peery Plumbing Co Inc | 8th fl - add 3, relocate 8 and plug 2 sprinklers in order to conform with the new wall and ceiling layout of the tiDetails
8th fl - add 3, relocate 8 and plug 2 sprinklers in order to conform with the new wall and ceiling layout of the ti | $3,375 |
| Sep 11, 2019 | Never finaled issued Sep 2019, no final | 101 02nd St | C B 2 Builders Incorporated | this project involves modification to include selective demolition & construction of non-load bearing partition, new door & frame, & new finishesDetails
this project involves modification to include selective demolition & construction of non-load bearing partition, new door & frame, & new finishes | $150,000 |
| Jun 5, 2019 | Completed final sign-off Jul 2019 | 101 02nd St | Siemens Industry, Inc. | fire alarm work for the restrooms remodel on floor 8 additions are 2 speaker/strobes. ref pa#201903226016. n/a for maherDetails
fire alarm work for the restrooms remodel on floor 8 additions are 2 speaker/strobes. ref pa#201903226016. n/a for maher | $1,270 |
| Jun 5, 2019 | Completed final sign-off Jul 2019 | 101 02nd St | Siemens Industry, Inc. | fire alarm for the corridor restrooms remodel on floor 5, additions and replacements are 10 speaker/strobes ref 201806262913. n/a for maher.Details
fire alarm for the corridor restrooms remodel on floor 5, additions and replacements are 10 speaker/strobes ref 201806262913. n/a for maher. | $6,340 |
| May 20, 2019 | Never finaled issued May 2019, no final | 101 02nd St | Source Planning And Construction Inc | 8th fl: electrical for 201903226016.Details
8th fl: electrical for 201903226016. | |
| May 20, 2019 | Never finaled issued May 2019, no final | 101 02nd St | Source Planning And Construction Inc | 5th fl: electrical for 201806262913.Details
5th fl: electrical for 201806262913. | |
| Apr 25, 2019 | Completed final sign-off May 2019 | 101 02nd St | Anderson, Rowe & Buckley, Inc. | 5th floor: existing fire sprinkler system- t.i. relocate 2 sprinklers.Details
5th floor: existing fire sprinkler system- t.i. relocate 2 sprinklers. | $1,000 |
| Mar 22, 2019 | Completed final sign-off Jul 2019 | 101 02nd St | Source Planning And Construction Inc | restroom scope involves demolition and construction of toilet partitions, new plumbing, new accessorie and new finishes. salvage & reuse of (e) materials if practicalDetails
restroom scope involves demolition and construction of toilet partitions, new plumbing, new accessorie and new finishes. salvage & reuse of (e) materials if practical | $143,262 |
| Jan 23, 2019 | Expired or cancelled cancelled Jan 2026 | 101 02nd St | Truebeck Construction | ref pa# 201811206402; ad da check list, scope of work, add fisish plan notes note #14, accessible restrooms men's & women's elevations & mounting height elevations, construction plan drinking fountainDetails
ref pa# 201811206402; ad da check list, scope of work, add fisish plan notes note #14, accessible restrooms men's & women's elevations & mounting height elevations, construction plan drinking fountain | $155,000 |
| Jan 22, 2019 | Never finaled issued Jan 2019, no final | 101 02nd St | Siemens Industry, Inc. | suite 800, 8th fl - fire alarm work for the "suite 800" remodel. additions are 2 speaker/strobes. as well as the relocation of 1 speaker/strobe. ref pa 2018-1120-6402Details
suite 800, 8th fl - fire alarm work for the "suite 800" remodel. additions are 2 speaker/strobes. as well as the relocation of 1 speaker/strobe. ref pa 2018-1120-6402 | $1,270 |
| Jan 18, 2019 | Completed final sign-off Feb 2019 | 101 02nd St | Golden Gate Fire Protection Inc | ref pa# 201811206402; fire sprinkler; relocate 9 pendent sprinklers on the 8th fl. suite 800Details
ref pa# 201811206402; fire sprinkler; relocate 9 pendent sprinklers on the 8th fl. suite 800 | $4,725 |
| Jan 4, 2019 | Completed final sign-off Dec 2019 | 101 02nd St | Acco Engineered Systems Inc. Dba Acco En | #800: relocate linear plenums & rebalance. ref 201811206402Details
#800: relocate linear plenums & rebalance. ref 201811206402 | $10,000 |
| Nov 20, 2018 | Completed final sign-off Dec 2019 | 101 02nd St | Truebeck Construction | suite 800. modification of (e) t.i incl selective demo, construction on non-load bearing partitions, (e) mods to ceiling grid & tile, light fixture relocation w/ (n) re-switching, (n) office doors and frames, (n) finishesDetails
suite 800. modification of (e) t.i incl selective demo, construction on non-load bearing partitions, (e) mods to ceiling grid & tile, light fixture relocation w/ (n) re-switching, (n) office doors and frames, (n) finishes | $155,000 |
| Nov 1, 2018 | Never finaled issued Nov 2018, no final | 101 02nd St | Siemens Industry, Inc. | fire alarm work for the "elevator lobby/corridor" areas on floor 3; additions and replacements of 9 speakers/strobes. ref pa 2018-0911-9688Details
fire alarm work for the "elevator lobby/corridor" areas on floor 3; additions and replacements of 9 speakers/strobes. ref pa 2018-0911-9688 | $5,700 |
| Oct 16, 2018 | Never finaled issued Oct 2018, no final | 101 02nd St | Source Planning And Construction Inc | electrical work for ti. new lighting and controls. ref pa 2018-0911-9688Details
electrical work for ti. new lighting and controls. ref pa 2018-0911-9688 | |
| Oct 4, 2018 | Completed final sign-off Jul 2019 | 101 02nd St | Source Planning And Construction Inc | 12th fl - restroom scope involves demolition and construction of toilet partitions, new plumbing, new accessories and new finishes, salvage & reuise existing selectred materials if practicalDetails
12th fl - restroom scope involves demolition and construction of toilet partitions, new plumbing, new accessories and new finishes, salvage & reuise existing selectred materials if practical | $187,609 |
| Sep 11, 2018 | Completed final sign-off Jul 2019 | 101 02nd St | Source Planning And Construction Inc | modification of e multi tenant elevator lobby and corridor improvements to include selective construction of non load bearing partitions, (e) modification to ceiling new light fixtures and relocate new switching and new finishes. fire and mep under separate permit(s).Details
modification of e multi tenant elevator lobby and corridor improvements to include selective construction of non load bearing partitions, (e) modification to ceiling new light fixtures and relocate new switching and new finishes. fire and mep under separate permit(s). | $177,640 |
| Jul 18, 2018 | Never finaled issued Jul 2018, no final | 101 02nd St | Source Planning And Construction Inc | suite 700: electrical work for ti to consist new lighting, power & signal, wiring, lighting & controls. ref pa #201805048233. maher naDetails
suite 700: electrical work for ti to consist new lighting, power & signal, wiring, lighting & controls. ref pa #201805048233. maher na | $20,000 |
| Jul 17, 2018 | Never finaled issued Jul 2018, no final | 101 02nd St | Siemens Industry, Inc. | 7th fl - fire alarm work for the "hashcrop" remodel; additions are 2 speakers, 1 speaker/strobes, and the relocation of 2 speaker/strobes. ref pa 2018-0504-8233. n/a for maher.Details
7th fl - fire alarm work for the "hashcrop" remodel; additions are 2 speakers, 1 speaker/strobes, and the relocation of 2 speaker/strobes. ref pa 2018-0504-8233. n/a for maher. | $2,500 |
| Jul 11, 2018 | Completed final sign-off Jul 2018 | 101 02nd St | 7th flr. fire sprinklers, relocate 2, add 1 and delete 5Details
7th flr. fire sprinklers, relocate 2, add 1 and delete 5 | $1,500 | |
| Jun 26, 2018 | Completed final sign-off Jul 2019 | 101 02nd St | Source Planning And Construction Inc | 5th flr - ti for (e) multi tenant elevator lobby/corridor. selective const of non load bearing partitions, (e) ceiling, new light fixture and relocation and new switching, new finishes. restrm - demo/construction of toilet partitions/plm/accessories & finishes. fire/mep under sep permitsDetails
5th flr - ti for (e) multi tenant elevator lobby/corridor. selective const of non load bearing partitions, (e) ceiling, new light fixture and relocation and new switching, new finishes. restrm - demo/construction of toilet partitions/plm/accessories & finishes. fire/mep under sep permits | $398,000 |
| May 4, 2018 | Never finaled issued May 2018, no final | 101 02nd St | Source Planning And Construction Inc | 7/f: modification of an (e) ti - selective demo and contruction of non-load bearing partitions, new office doors nad frames, salvage and reuse of (e) selected materials if practical, millwork and new finishesDetails
7/f: modification of an (e) ti - selective demo and contruction of non-load bearing partitions, new office doors nad frames, salvage and reuse of (e) selected materials if practical, millwork and new finishes | $128,442 |
| Feb 22, 2018 | Completed final sign-off Jul 2018 | 101 02nd St | Golden Gate Fire Protection Inc | fire sprinkler only, relocate 16 pendents, relocate 25 uprights, sutie 1200, 12th fl. n/a for maher.Details
fire sprinkler only, relocate 16 pendents, relocate 25 uprights, sutie 1200, 12th fl. n/a for maher. | $8,650 |
| Feb 21, 2018 | Completed final sign-off Jul 2018 | 101 02nd St | Golden Gate Fire Protection Inc | 12th fl fire sprinkler only: relocate 6 pendents. relocate 12 uprights. for suite #1275. ref # 201712186753. maher naDetails
12th fl fire sprinkler only: relocate 6 pendents. relocate 12 uprights. for suite #1275. ref # 201712186753. maher na | $4,500 |
| Feb 20, 2018 | Completed final sign-off Mar 2018 | 101 02nd St | Siemens Industry, Inc. | 12th flr: fire alarm work - add 18 speaker/strobes and 5 strobes. maher na. ref pa# 201712186753Details
12th flr: fire alarm work - add 18 speaker/strobes and 5 strobes. maher na. ref pa# 201712186753 | $13,800 |
| Feb 20, 2018 | Completed final sign-off Jun 2018 | 101 02nd St | Source Planning And Construction Inc | 12th fl suites 1200/1275 mech and electrical permit 201712186753Details
12th fl suites 1200/1275 mech and electrical permit 201712186753 | $300,000 |
| Dec 18, 2017 | Completed final sign-off Jun 2018 | 101 02nd St | Source Planning And Construction Inc | ste. #1200 & #1275: demo and construction of non load bearing walls, new ceiling grid, light fixtures, new millwork, finishesDetails
ste. #1200 & #1275: demo and construction of non load bearing walls, new ceiling grid, light fixtures, new millwork, finishes | $279,042 |
| Nov 2, 2017 | Completed final sign-off Dec 2017 | 101 02nd St | 12/f- fire sprinklers ti 5 relcated pendents, 2 added, ref 201709138056 maher not reqDetails
12/f- fire sprinklers ti 5 relcated pendents, 2 added, ref 201709138056 maher not req | $3,539 | |
| Oct 17, 2017 | Completed final sign-off Apr 2018 | 101 02nd St | Siemens Industry, Inc. | f/a work for "suite 12mp", remodel on the 12th fl; additions are 6 duct detectors & 2 speaker/strobes. ref pa #201709138056. maher naDetails
f/a work for "suite 12mp", remodel on the 12th fl; additions are 6 duct detectors & 2 speaker/strobes. ref pa #201709138056. maher na | $4,680 |
| Oct 12, 2017 | Expired or cancelled cancelled Jan 2026 | 575 Mission St | demo & construction of accessible restrooms for full bldg, mech, plumbing and electrical & accessibility compliance. modification of (e) tenant improvement to include selective demo & construction of non-load bearing partitions, new doors, frames, (n) plumbing fixtures, new finishes and salvage (e)Details
demo & construction of accessible restrooms for full bldg, mech, plumbing and electrical & accessibility compliance. modification of (e) tenant improvement to include selective demo & construction of non-load bearing partitions, new doors, frames, (n) plumbing fixtures, new finishes and salvage (e) | $191,000 | |
| Sep 14, 2017 | Completed final sign-off Jun 2018 | 101 02nd St | Truebeck Construction | demo curtain wall system and install nana wall system. new guardrail and wooden deck pavers on new occupiable roof deck and multipurpose room, (n) elevator lobby s-doors configuration and (n) panic hardware on exit stairs. mp room ref pa 201709138056 ** maher: n/a **Details
demo curtain wall system and install nana wall system. new guardrail and wooden deck pavers on new occupiable roof deck and multipurpose room, (n) elevator lobby s-doors configuration and (n) panic hardware on exit stairs. mp room ref pa 201709138056 ** maher: n/a ** | $120,450 |
| Sep 13, 2017 | Completed final sign-off Aug 2018 | 101 02nd St | Truebeck Construction | 12th fl - demo partitions, new stairs, ramp, kitchenette tieing into existing meps for renovation. all new interior finishes. roof deck, curtain wall, fire alarm, and sprinklers on separate submittals.Details
12th fl - demo partitions, new stairs, ramp, kitchenette tieing into existing meps for renovation. all new interior finishes. roof deck, curtain wall, fire alarm, and sprinklers on separate submittals. | $425,050 |
| Sep 1, 2017 | Completed final sign-off Sep 2017 | 101 02nd St | Golden Gate Fire Protection Inc | 5/f suite 570: fire sprinkler only: relocate 12 pendents. n/a maherDetails
5/f suite 570: fire sprinkler only: relocate 12 pendents. n/a maher | $3,000 |
| Jun 20, 2017 | Completed final sign-off Oct 2017 | 101 02nd St | Rossi Builders Inc. | 14/f- revision to 201704254811: remove signage on (e) toilet rooms and replace with signs indicating location of the accessible all gender toilet rooms.Details
14/f- revision to 201704254811: remove signage on (e) toilet rooms and replace with signs indicating location of the accessible all gender toilet rooms. | |
| Jun 6, 2017 | Completed final sign-off Jul 2017 | 101 02nd St | Siemens Industry, Inc. | fire alarm work for the "service now" remodel on floor 14; additions are 5 smoke detectors, 14 duct detectors, 1 strobe power supply module, 6 speakers, 27 speaker/strobs and 8 strobes. ref pa 2017-0425-4811. n/a for maher.Details
fire alarm work for the "service now" remodel on floor 14; additions are 5 smoke detectors, 14 duct detectors, 1 strobe power supply module, 6 speakers, 27 speaker/strobs and 8 strobes. ref pa 2017-0425-4811. n/a for maher. | $34,540 |
| Jun 2, 2017 | Completed final sign-off Jul 2017 | 101 02nd St | Golden Gate Fire Protection Inc | 14th floor fire sprinkler only. relocate 19 pendents; add 2 uprights; relocate 39 pendents for service now. ref #201704133933. n/a maher ordinanceDetails
14th floor fire sprinkler only. relocate 19 pendents; add 2 uprights; relocate 39 pendents for service now. ref #201704133933. n/a maher ordinance | $15,000 |
| Apr 25, 2017 | Completed final sign-off Sep 2017 | 101 02nd St | Rossi Builders Inc. | construction of new tentant layout, construction of partitoins, doors, ceilings, millwork, and plumbing fixtures. demo under 201704133933 mep includedDetails
construction of new tentant layout, construction of partitoins, doors, ceilings, millwork, and plumbing fixtures. demo under 201704133933 mep included | $1,013,115 |
| Apr 17, 2017 | Never finaled issued Apr 2017, no final | 101 02nd St | Golden Gate Fire Protection Inc | 14th fl: fire sprinkler; relocate 111 upright sprinklers for demo permit. n/a for maherDetails
14th fl: fire sprinkler; relocate 111 upright sprinklers for demo permit. n/a for maher | $58,275 |
| Apr 13, 2017 | Completed final sign-off Oct 2017 | 101 02nd St | Rossi Builders Inc. | 14th floor - scope id selective demo of existing non-structural partitions, doors, ceiling, millwork, & fixtures. ref sprinkler pa#201704174076. n/a for maher.Details
14th floor - scope id selective demo of existing non-structural partitions, doors, ceiling, millwork, & fixtures. ref sprinkler pa#201704174076. n/a for maher. | $45,000 |
| Apr 4, 2017 | Completed final sign-off Jun 2017 | 101 02nd St | Siemens Industry, Inc. | fire alarm work for the "suite 225" remodel on 12th flr: fire alarm - add 2 smoke detectors and 4 speaker/strobes maher na. ref pa # 201703080931Details
fire alarm work for the "suite 225" remodel on 12th flr: fire alarm - add 2 smoke detectors and 4 speaker/strobes maher na. ref pa # 201703080931 | $3,260 |
| Mar 21, 2017 | Completed final sign-off Apr 2017 | 101 02nd St | 12th floor suite 1225: fire sprinkler permit - relocate 13, add 4 & delete 2 pendent sprinklers. relocate 7 upright sprinklers. ref t.i. #201703080931. n/a maher ordinanceDetails
12th floor suite 1225: fire sprinkler permit - relocate 13, add 4 & delete 2 pendent sprinklers. relocate 7 upright sprinklers. ref t.i. #201703080931. n/a maher ordinance | $6,500 | |
| Mar 10, 2017 | Completed final sign-off Nov 2017 | 101 02nd St | Source Planning And Construction Inc | 12/f- electrical for 201703080931. n/a ordinance #155-13Details
12/f- electrical for 201703080931. n/a ordinance #155-13 | $55,000 |
| Mar 8, 2017 | Completed final sign-off Nov 2017 | 101 02nd St | Source Planning And Construction Inc | 12th flr: selective demo and construction modification of (e) suite & multi-tenant corridor with new light fixtures, finishes, millwork, electrical doors & hardware maher na. mep, life safety deferred.Details
12th flr: selective demo and construction modification of (e) suite & multi-tenant corridor with new light fixtures, finishes, millwork, electrical doors & hardware maher na. mep, life safety deferred. | $189,703 |
| Jan 20, 2017 | Completed final sign-off Mar 2017 | 101 02nd St | Golden Gate Fire Protection Inc | 3rd floor: fire sprinkler only: relocate 9 uprights heads, remove 1 pendent for suite #375. n/a for maher. ref app#201612064283Details
3rd floor: fire sprinkler only: relocate 9 uprights heads, remove 1 pendent for suite #375. n/a for maher. ref app#201612064283 | $2,250 |
| Dec 6, 2016 | Expired or cancelled cancelled Jan 2026 | 101 02nd St | suite 375: modification of extg tenant suite to include selective demolition & construction of non-load bearing partitions, new lighting, controls, new millwork and new finishes. all work shall comply with federal state and local codes including sf bldg code, vav title 24 and federal ada regulationsDetails
suite 375: modification of extg tenant suite to include selective demolition & construction of non-load bearing partitions, new lighting, controls, new millwork and new finishes. all work shall comply with federal state and local codes including sf bldg code, vav title 24 and federal ada regulations | $90,635 | |
| Jun 14, 2016 | Completed final sign-off Nov 2016 | 101 02nd St | 11th floor: evac maps 4 maher naDetails
11th floor: evac maps 4 maher na | $1,800 | |
| May 17, 2016 | Completed final sign-off Nov 2016 | 101 02nd St | Skyline Construction | 11th floor: structural work for new nana folding door for ref pa 2016 0323 2806. maher naDetails
11th floor: structural work for new nana folding door for ref pa 2016 0323 2806. maher na | $3,000 |
| May 10, 2016 | Completed final sign-off Jun 2016 | 101 02nd St | Siemens Industry, Inc. | 0n floor 11 -fire alarm work for the "colliers" ti remode; additions are 5 smoke detectors, 1 strobe power supply, 8 speakers, 23 speaker/strobes, and 7 strobes. ref pa 2016-0323-2806. maher naDetails
0n floor 11 -fire alarm work for the "colliers" ti remode; additions are 5 smoke detectors, 1 strobe power supply, 8 speakers, 23 speaker/strobes, and 7 strobes. ref pa 2016-0323-2806. maher na | $24,460 |
| Apr 18, 2016 | Completed final sign-off May 2016 | 101 02nd St | Golden Gate Fire Protection Inc | fire sprinkler only- relocate 39 pendents, add 14 pendents, relocate 6 uprights, plug 4 uprights, plug 4 for colliers 11/f. total 63 heads. t.i. pa#201603232806. n/a ordinance #155-13Details
fire sprinkler only- relocate 39 pendents, add 14 pendents, relocate 6 uprights, plug 4 uprights, plug 4 for colliers 11/f. total 63 heads. t.i. pa#201603232806. n/a ordinance #155-13 | $31,500 |
| Apr 13, 2016 | Completed final sign-off Apr 2016 | 101 02nd St | Siemens Industry, Inc. | fire alarm for the "suite 350" ti remodel on floor 3; additions are 1 smoke detector, 2 speakers, 12 speaker/strobes, and 2 strobes. ref pa 2016-0303-1061, maher naDetails
fire alarm for the "suite 350" ti remodel on floor 3; additions are 1 smoke detector, 2 speakers, 12 speaker/strobes, and 2 strobes. ref pa 2016-0303-1061, maher na | $8,800 |
| Apr 11, 2016 | Never finaled issued Apr 2016, no final | 101 02nd St | Skyline Construction | suite 350 - mechanical & electrical work for tenant improvement. ref #201603031061. n/a maher ordinanceDetails
suite 350 - mechanical & electrical work for tenant improvement. ref #201603031061. n/a maher ordinance | $55,000 |
| Apr 1, 2016 | Never finaled issued Apr 2016, no final | 101 02nd St | Siemens Industry, Inc. | 15th floor: fire alarm for the "nokia" ref pa 2016-0303-1145: add 5 smoke detectors, 4 duct detectors, 1 strobe power supply, 8 speakers, 27 speaker/strobes, 7 strobes, 4 door holders. maher naDetails
15th floor: fire alarm for the "nokia" ref pa 2016-0303-1145: add 5 smoke detectors, 4 duct detectors, 1 strobe power supply, 8 speakers, 27 speaker/strobes, 7 strobes, 4 door holders. maher na | $31,000 |
| Mar 23, 2016 | Completed final sign-off Nov 2016 | 101 02nd St | Skyline Construction | 11th floor t.i. & renovations on the vacant, non-occupied which include demo non-structural partitions, millwork, doors, ceiling, lighting, elec, finishes & construct non-structural partitions, doors glazing, ceiling,light fixtures,millwork & finishes. mep under same permit. l/s under separate bpaDetails
11th floor t.i. & renovations on the vacant, non-occupied which include demo non-structural partitions, millwork, doors, ceiling, lighting, elec, finishes & construct non-structural partitions, doors glazing, ceiling,light fixtures,millwork & finishes. mep under same permit. l/s under separate bpa | $1,727,040 |
| Mar 21, 2016 | Completed final sign-off Apr 2016 | 101 02nd St | Golden Gate Fire Protection Inc | #350- fire sprinkler only, relocate 3 pendents, add 1 pendent (4 total) for informa. t.i. pa#201603031061. n/a ordinance #155-13Details
#350- fire sprinkler only, relocate 3 pendents, add 1 pendent (4 total) for informa. t.i. pa#201603031061. n/a ordinance #155-13 | $2,000 |
| Mar 9, 2016 | Completed final sign-off May 2016 | 101 02nd St | Principal Builders Inc. | 15th flr: mep to install new equipment and fixtures. ref pa 2015 0303 1145Details
15th flr: mep to install new equipment and fixtures. ref pa 2015 0303 1145 | $473,000 |
| Mar 8, 2016 | Completed final sign-off Nov 2016 | 101 02nd St | Skyline Construction | 11th floor:scope of this permit includes the following :per ab-17 selective demolition on the vancant, unoccupied of an extg non-structural partitions, doors/frames, ceiling grid/tile, lighting, power & finishes. there is no new construction under this demolition permit application. n/a 155-13Details
11th floor:scope of this permit includes the following :per ab-17 selective demolition on the vancant, unoccupied of an extg non-structural partitions, doors/frames, ceiling grid/tile, lighting, power & finishes. there is no new construction under this demolition permit application. n/a 155-13 | $72,000 |
| Mar 3, 2016 | Never finaled issued Mar 2016, no final | 101 02nd St | Skyline Construction | suite 350 - modification of (e) bldg improvements to include selective demo & construction of non-load bearing partitions, new door & frame & sidelight, new millwork & new finishes. l/s under separate permit.Details
suite 350 - modification of (e) bldg improvements to include selective demo & construction of non-load bearing partitions, new door & frame & sidelight, new millwork & new finishes. l/s under separate permit. | $518,609 |
| Mar 3, 2016 | Completed final sign-off Apr 2016 | 101 02nd St | Skyline Construction | suite 2250 - modification of (e) bldg improvements to include selective demo & construction of non-load bearing partitions, new door & frame & sidelight, new millwork & new finishes. mep, l/s under separate. n/a maher ordinanceDetails
suite 2250 - modification of (e) bldg improvements to include selective demo & construction of non-load bearing partitions, new door & frame & sidelight, new millwork & new finishes. mep, l/s under separate. n/a maher ordinance | $79,019 |
| Mar 3, 2016 | Completed final sign-off May 2016 | 101 02nd St | Principal Builders Inc. | 15/f- t. i. to construct new partitions, doors, finishes, ceilings & millwork. mep, fire protection and life safety to follow under seperate permit. n/a ordinance #155-13Details
15/f- t. i. to construct new partitions, doors, finishes, ceilings & millwork. mep, fire protection and life safety to follow under seperate permit. n/a ordinance #155-13 | $889,119 |
| Feb 29, 2016 | Completed final sign-off May 2016 | 101 02nd St | Anderson, Rowe & Buckley, Inc. | 15th floor: extg fire sprinkler system. t.i. 17 relocated sprinklers and 105 add sprinklers. ref app#201512094563 n/a for maher.Details
15th floor: extg fire sprinkler system. t.i. 17 relocated sprinklers and 105 add sprinklers. ref app#201512094563 n/a for maher. | $61,000 |
| Dec 9, 2015 | Never finaled issued Dec 2015, no final | 101 02nd St | Principal Builders Inc. | 15th floor:demolition of partitions and doors, millwork, cieling finishes. all ada will be provided on future t.i. per ab-017. elevator lobby doors and cure to remain.Details
15th floor:demolition of partitions and doors, millwork, cieling finishes. all ada will be provided on future t.i. per ab-017. elevator lobby doors and cure to remain. | $85,000 |
| Sep 25, 2015 | Completed final sign-off Oct 2015 | 101 02nd St | Anderson, Rowe & Buckley, Inc. | 8th flr: fire sprinklers - relocate 2 heads, add (1) branch line retraint. ref pa 2015 0723 2313 maher naDetails
8th flr: fire sprinklers - relocate 2 heads, add (1) branch line retraint. ref pa 2015 0723 2313 maher na | $1,036 |
| Sep 8, 2015 | Completed final sign-off Oct 2015 | 101 02nd St | Siemens Industry, Inc. | 8th floor: fire alarm for the "hff" t.i. remodel: additions are 2 speaker/strobes. ref app#2015-0827-5409.Details
8th floor: fire alarm for the "hff" t.i. remodel: additions are 2 speaker/strobes. ref app#2015-0827-5409. | $1,000 |
| Aug 27, 2015 | Completed final sign-off Nov 2015 | 101 02nd St | Commercial Interior Builders Inc | 8th floor: remodel of lobby/breakroom, new finishes & copy room. mep/fire/life safety under sep permit. maher naDetails
8th floor: remodel of lobby/breakroom, new finishes & copy room. mep/fire/life safety under sep permit. maher na | $70,000 |
| Jul 23, 2015 | Completed final sign-off May 2016 | 101 02nd St | Source Planning And Construction Inc | modification of e multi tenant elevator lobby and corridor improvements to include e ceiling modification, light fixture relocation, reswitching and finishesDetails
modification of e multi tenant elevator lobby and corridor improvements to include e ceiling modification, light fixture relocation, reswitching and finishes | $100,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Source Planning And Construction Inc (49), Golden Gate Fire Protection Inc (24), Siemens Industry, Inc. (23), Skyline Construction (23), Sabah International Incorporated (21), Pioneer Fire Inc. (8), Bilcor Inc (5), Ayoob & Peery Plumbing Co Inc (4), Clune Construction Company L P (4), Truebeck Construction (4), Anderson, Rowe & Buckley, Inc. (3), Bcci Construction Company (3), Principal Builders Inc. (3), Rossi Builders Inc. (3), C B 2 Builders Incorporated (2), Matrix Hg Inc (2), Acco Engineered Systems Inc. Dba Acco En, C C I Commercial Construction & Improv, Commercial Interior Builders Inc, Maguire Inc Dba Lahue And Associates, Prima Acquire Inc Dba Lahue And Associat
- Architects
- Ashley Miller (18), Daniel Pamperin (4), Donnie Lam (4), Amir Kakavand (3), George Soskin (3), Michael Castro (3), Walt Thomas (3), Brandon Stevens (2), Craig James Almeleh (2), Sharon Russo (2), Douglas Zucker, Jesus Cabellon Jr., William Hadinger
- Engineers
- Aaron J. Strauch (9), Bradley Hollub (5), Stephen Shaffer (5), Alexander Pacheco (2), Pablo Orozco (2), Sherry Chaumpluke (2), Steven Lew (2), Alexander Joseph Pacheco, Ashley Miller, Carl Milsum, Christopher Jordan Malabed, Craig W. Ristow, Dean Macy, Dennis Cheung, Edward Rivera, Jesus Cabellon Jr., Xuong Quach
- Authorized agents
- Edith Posadas (2), Kendra Curtis (2), Edgar Garcia
- Designers
- Golden Gate Fire Protection (2), R L H Fire Protection Inc (2), Aldi Gunawan Chris Hamilton, Sabah International Inc.
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.