Permit GraphShortlistSan Francisco building permits since 2000

Block 3721, lot 089

101 02nd St

City’s use
Commercial Office
Built
2000
Stories
26
Building
394,250 sq ft
Lot
27,560 sq ft
Zoning
C3O
Construction type
A

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

The 200 most recent permits filed for this property.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Sep 10, 2026In progress
issued Sep 2026
101 02nd StSource Planning And Construction Inc8/f suite 800: deferred mep for ref pa 202607144969. electrical - office t.i retrofit: lighting with associated circuits and controls, power and signal with associated circuits and wiring. mechanical - demo of ceiling diffusers in open area. install of ductwork where required. new sidewall diffusers
Details
Permit
202609107930
Permit issued
Sep 10, 2026

8/f suite 800: deferred mep for ref pa 202607144969. electrical - office t.i retrofit: lighting with associated circuits and controls, power and signal with associated circuits and wiring. mechanical - demo of ceiling diffusers in open area. install of ductwork where required. new sidewall diffusers

Open the permit page

$92,450
Jul 14, 2026In progress
issued Jul 2026
101 02nd StSource Planning And Construction Inc8/f suite 800: tenant improvement remodel including new partitions, office door and glazing. reference plan for restrooms #202504285316 completed 11/18/2025. mep deferred.
Details
Permit
202607144969
Permit issued
Jul 17, 2026

8/f suite 800: tenant improvement remodel including new partitions, office door and glazing. reference plan for restrooms #202504285316 completed 11/18/2025. mep deferred.

Open the permit page

$324,000
May 18, 2026In progress
issued May 2026
101 02nd StSource Planning And Construction Incsuite: 350 - new power and signal throught the space, new 2025 t24 lighting and controls. ref bpa: 202603268312
Details
Permit
202605181420
Permit issued
May 18, 2026

suite: 350 - new power and signal throught the space, new 2025 t24 lighting and controls. ref bpa: 202603268312

Open the permit page

$70,000
May 14, 2026In progress
issued May 2026
101 02nd StSource Planning And Construction Incunit# 350: furnish and istall one new 1-ton water source heat pump associated ductwork. piping and condensate for it room. ref 202630268312
Details
Permit
202605141296
Permit issued
May 18, 2026

unit# 350: furnish and istall one new 1-ton water source heat pump associated ductwork. piping and condensate for it room. ref 202630268312

Open the permit page

$54,000
Apr 27, 2026In progress
issued Apr 2026
101 02nd StSource Planning And Construction Inc(ste# 350 / 3rd floor) revision to pa# 202603268312: work includes installation of 6 phone booths.
Details
Permit
202604270132
Permit issued
Apr 27, 2026

(ste# 350 / 3rd floor) revision to pa# 202603268312: work includes installation of 6 phone booths.

Open the permit page

Mar 26, 2026In progress
issued Mar 2026
101 02nd StSource Planning And Construction Inc3/f suite 350 - work includes: new partitions, office door and glazing and mill work.
Details
Permit
202603268312
Permit issued
Mar 30, 2026

3/f suite 350 - work includes: new partitions, office door and glazing and mill work.

Open the permit page

$125,000
Nov 25, 2025Completed
final sign-off Dec 2025
101 02nd St15th fl - fire sprinkler, switch 18 pendents with upright fire sprinklers ti 202510016514
Details
Permit
202511250424
Permit issued
Nov 25, 2025
Final sign-off
Dec 4, 2025

15th fl - fire sprinkler, switch 18 pendents with upright fire sprinklers ti 202510016514

Open the permit page

$5,000
Nov 6, 2025Completed
final sign-off Dec 2025
101 02nd StSource Planning And Construction Inc15/fl: new lighting and controls for whit ebox space reference arch permit#2025-1001-6514
Details
Permit
202511069100
Permit issued
Nov 6, 2025
Final sign-off
Dec 17, 2025

15/fl: new lighting and controls for whit ebox space reference arch permit#2025-1001-6514

Open the permit page

$10,000
Oct 28, 2025Completed
final sign-off Jan 2026
101 02nd StSabah International Incorporated15th fl new fire alarm layout in t.i areas. demolish initiating devices and notiification appliances within the scope of work. remove all abandoned wiere and conduit. ref 202510016514
Details
Permit
202510288274
Permit issued
Oct 28, 2025
Final sign-off
Jan 27, 2026

15th fl new fire alarm layout in t.i areas. demolish initiating devices and notiification appliances within the scope of work. remove all abandoned wiere and conduit. ref 202510016514

Open the permit page

$12,000
Oct 1, 2025Completed
final sign-off Dec 2025
101 02nd StSource Planning And Construction Inc15th/fl: demolition of non load bearing artitions , ceilings, light fixtures, millwork and finishes.
Details
Permit
202510016514
Permit issued
Oct 2, 2025
Final sign-off
Dec 17, 2025

15th/fl: demolition of non load bearing artitions , ceilings, light fixtures, millwork and finishes.

Open the permit page

$250,000
Sep 26, 2025Completed
final sign-off Oct 2025
101 02nd StGolden Gate Fire Protection Incas built to #202504285317; relocate 1 upright in the janitor's closet on the 3rd, 4th, & 8th floors (3 uprights total)
Details
Permit
202509266198
Permit issued
Oct 17, 2025
Final sign-off
Oct 27, 2025

as built to #202504285317; relocate 1 upright in the janitor's closet on the 3rd, 4th, & 8th floors (3 uprights total)

Open the permit page

$750
Sep 25, 2025Completed
final sign-off Dec 2025
101 02nd StSource Planning And Construction Inc3rd, 4th, & 8th floors: new 2022 title-24 compliant lighting and controls for janitor closets. ref pa #202508213649
Details
Permit
202509256128
Permit issued
Oct 2, 2025
Final sign-off
Dec 1, 2025

3rd, 4th, & 8th floors: new 2022 title-24 compliant lighting and controls for janitor closets. ref pa #202508213649

Open the permit page

$7,500
Aug 21, 2025Completed
final sign-off Dec 2025
101 02nd StSource Planning And Construction Inc3rd, 4th & 8th fl- modification of adding a new door to an (e) storage room at public elevator lobby
Details
Permit
202508213649
Permit issued
Aug 25, 2025
Final sign-off
Dec 1, 2025

3rd, 4th & 8th fl- modification of adding a new door to an (e) storage room at public elevator lobby

Open the permit page

$15,000
Jul 1, 2025Completed
final sign-off Dec 2025
101 02nd StMatrix Hg Increplace (e) trane 10-ton cooling only package unit with new trane 10-tom. package unit and reconnect to existing ductwork and electrical. no work in the interior of the building
Details
Permit
202507019866
Permit issued
Sep 3, 2025
Final sign-off
Dec 17, 2025

replace (e) trane 10-ton cooling only package unit with new trane 10-tom. package unit and reconnect to existing ductwork and electrical. no work in the interior of the building

Open the permit page

$35,524
May 15, 2025Completed
final sign-off Aug 2025
101 02nd StC C I Commercial Construction & Improv16th fl suite 1625: selective demolition of non load bearing partitions. new office glazing, frames and new finishes
Details
Permit
202505156522
Permit issued
May 19, 2025
Final sign-off
Aug 27, 2025

16th fl suite 1625: selective demolition of non load bearing partitions. new office glazing, frames and new finishes

Open the permit page

$19,369
May 14, 2025Completed
final sign-off May 2025
101 02nd StGolden Gate Fire Protection Inc4th fl - fire sprinkler ti. replace 2 concealed pendents in the elevator lobby. ref ti 202503252960
Details
Permit
202505146412
Permit issued
May 14, 2025
Final sign-off
May 22, 2025

4th fl - fire sprinkler ti. replace 2 concealed pendents in the elevator lobby. ref ti 202503252960

Open the permit page

$500
May 5, 2025Completed
final sign-off Nov 2025
101 02nd StSource Planning And Construction Inchvac scope selective demo and ap install new air distribution, ductwork, relocate tstat per floor plan. air balance. elec scope: new power and signal devices throughout space and new 2022 title 24 comopliant lighting and controls ref 202502100012
Details
Permit
202505055827
Permit issued
May 5, 2025
Final sign-off
Nov 18, 2025

hvac scope selective demo and ap install new air distribution, ductwork, relocate tstat per floor plan. air balance. elec scope: new power and signal devices throughout space and new 2022 title 24 comopliant lighting and controls ref 202502100012

Open the permit page

$152,500
May 1, 2025In progress
issued May 2025
101 02nd StSabah International Incorporated4th fl - provide modification of the existing fire alarm system. add 1 new smoke detector on the; add 2 new two way emergency communication call boxes ref pa 202503252960
Details
Permit
202505015584
Permit issued
May 1, 2025

4th fl - provide modification of the existing fire alarm system. add 1 new smoke detector on the; add 2 new two way emergency communication call boxes ref pa 202503252960

Open the permit page

$13,348
Apr 28, 2025Completed
final sign-off Nov 2025
101 02nd StSource Planning And Construction Inc8th fl suite 825 & 850: revision to pa 2025-0210-0012 scope includes change location of the proposed drinking fountains
Details
Permit
202504285316
Permit issued
Apr 29, 2025
Final sign-off
Nov 18, 2025

8th fl suite 825 & 850: revision to pa 2025-0210-0012 scope includes change location of the proposed drinking fountains

Open the permit page

Apr 28, 2025In progress
issued Apr 2025
101 02nd StGolden Gate Fire Protection Inc8th fl - fire sprinkler ti relocate 11 pendents, relocate 3 uprights, and delete 3 pendents. ref pa 202502100012
Details
Permit
202504285317
Permit issued
Apr 28, 2025

8th fl - fire sprinkler ti relocate 11 pendents, relocate 3 uprights, and delete 3 pendents. ref pa 202502100012

Open the permit page

$3,500
Apr 24, 2025Completed
final sign-off Nov 2025
101 02nd StSource Planning And Construction Inc4/fl-ti 202503252960-title 24 compliant lighting and controls. new receptacles in restroom
Details
Permit
202504245192
Permit issued
Apr 25, 2025
Final sign-off
Nov 18, 2025

4/fl-ti 202503252960-title 24 compliant lighting and controls. new receptacles in restroom

Open the permit page

$50,000
Apr 4, 2025Completed
final sign-off Jun 2025
101 02nd StSabah International Incorporated8th fl - provide new fire notification appliances under ti area of work. like for like replacement of (e) notification appliances outside the ti area with new notification appliances ref pa 202502100012
Details
Permit
202504043721
Permit issued
Apr 4, 2025
Final sign-off
Jun 18, 2025

8th fl - provide new fire notification appliances under ti area of work. like for like replacement of (e) notification appliances outside the ti area with new notification appliances ref pa 202502100012

Open the permit page

$26,253
Mar 31, 2025Completed
final sign-off Feb 2026
101 02nd StPrima Acquire Inc Dba Lahue And Associatto install double faced blade sign: "cibc" 38.5" x 44.75" x 6"
Details
Permit
202503313358
Permit issued
Apr 7, 2025
Final sign-off
Feb 3, 2026

to install double faced blade sign: "cibc" 38.5" x 44.75" x 6"

Open the permit page

$7,295
Mar 25, 2025Completed
final sign-off Nov 2025
101 02nd StSource Planning And Construction Inc4/f: modification of an existing elevator lobby and restrooms, including demolition and new soffit ceiling, new light fixtures, new flooring and finished. mep deferred.
Details
Permit
202503252960
Permit issued
Mar 28, 2025
Final sign-off
Nov 18, 2025

4/f: modification of an existing elevator lobby and restrooms, including demolition and new soffit ceiling, new light fixtures, new flooring and finished. mep deferred.

Open the permit page

$224,550
Feb 10, 2025Completed
final sign-off Nov 2025
101 02nd StSource Planning And Construction Inc8/fl- suite 825 and 850- involves modification of (e) ti to include selective construction and demo of non load bearing partitions. modification to (e) ceiling grid and tile, light fixtures, relocation and (n) inlcuding re switching, (n) office doors, and grames, salvage and reuse of (e) selected
Details
Permit
202502100012
Permit issued
Mar 21, 2025
Final sign-off
Nov 18, 2025

8/fl- suite 825 and 850- involves modification of (e) ti to include selective construction and demo of non load bearing partitions. modification to (e) ceiling grid and tile, light fixtures, relocation and (n) inlcuding re switching, (n) office doors, and grames, salvage and reuse of (e) selected

Open the permit page

$225,000
Dec 18, 2024In progress
issued Dec 2024
101 02nd StSabah International Incorporated3rd floor. this is a fire alarm tenant improvement project add (1) new booster power supply with sync module add (2) ceiling-mounted led strobes. ref#: 202410314097
Details
Permit
202412187053
Permit issued
Dec 18, 2024

3rd floor. this is a fire alarm tenant improvement project add (1) new booster power supply with sync module add (2) ceiling-mounted led strobes. ref#: 202410314097

Open the permit page

$12,590
Dec 18, 2024Completed
final sign-off Mar 2025
101 02nd StSource Planning And Construction Inc3/fl- rev 202410314097- provide (n) lighting and branch cirutiing to (e) panel . provided (n) power signal and branch circuitng to (e) panel. provide title 24 compliance forms
Details
Permit
202412187115
Permit issued
Dec 20, 2024
Final sign-off
Mar 17, 2025

3/fl- rev 202410314097- provide (n) lighting and branch cirutiing to (e) panel . provided (n) power signal and branch circuitng to (e) panel. provide title 24 compliance forms

Open the permit page

$225,000
Dec 16, 2024Completed
final sign-off Mar 2025
101 02nd StSource Planning And Construction Inc3/f: selective demo and cap. install new cooling only vav terminal units. install new air distribution and ductwork. relocate t-stat per new floor plan. air balance area of work. ref ti permit 202410314097.
Details
Permit
202412166923
Permit issued
Dec 18, 2024
Final sign-off
Mar 17, 2025

3/f: selective demo and cap. install new cooling only vav terminal units. install new air distribution and ductwork. relocate t-stat per new floor plan. air balance area of work. ref ti permit 202410314097.

Open the permit page

$90,000
Dec 12, 2024Completed
final sign-off Mar 2025
101 02nd StSource Planning And Construction Inc3rd/f revision to 202410314097: modification of drinking fountain location
Details
Permit
202412126677
Permit issued
Dec 16, 2024
Final sign-off
Mar 17, 2025

3rd/f revision to 202410314097: modification of drinking fountain location

Open the permit page

Nov 8, 2024In progress
issued Nov 2024
101 02nd StGolden Gate Fire Protection Inc3/fl-ref ti 202410314097- fire sprinkler to relocate 30 pendants replace 19 pendants with uprights, delete 12 pendents and add 2 pendents
Details
Permit
202411084687
Permit issued
Nov 8, 2024

3/fl-ref ti 202410314097- fire sprinkler to relocate 30 pendants replace 19 pendants with uprights, delete 12 pendents and add 2 pendents

Open the permit page

$15,750
Oct 31, 2024Completed
final sign-off Mar 2025
101 02nd StSource Planning And Construction Inc3rd fl ti: construction of non load bearing partitions. modification of (e) ceiling grid & tile, new light fixtures & relocation. new office doors & frames, millwork, finishes & sinks. life safety sep permits. mep deferred. ref demo permit 202410152909
Details
Permit
202410314097
Permit issued
Nov 4, 2024
Final sign-off
Mar 17, 2025

3rd fl ti: construction of non load bearing partitions. modification of (e) ceiling grid & tile, new light fixtures & relocation. new office doors & frames, millwork, finishes & sinks. life safety sep permits. mep deferred. ref demo permit 202410152909

Open the permit page

$750,000
Oct 15, 2024Completed
final sign-off Nov 2024
101 02nd StSource Planning And Construction Inc3/fl- selective demo of non load bearing partitions portion of (e) ceiling grid and tile light fixture (e) millwork and finishes. demo work only. ab-017.
Details
Permit
202410152909
Permit issued
Oct 23, 2024
Final sign-off
Nov 8, 2024

3/fl- selective demo of non load bearing partitions portion of (e) ceiling grid and tile light fixture (e) millwork and finishes. demo work only. ab-017.

Open the permit page

$15,000
May 14, 2024Completed
final sign-off Sep 2024
101 02nd StSabah International Incorporatedfire alarm tenant improvement project. new notification appliances will be tied into new power supply as shown on drawings. exist notification appiances replaced by new will be connected to new.
Details
Permit
202405142069
Permit issued
May 14, 2024
Final sign-off
Sep 6, 2024

fire alarm tenant improvement project. new notification appliances will be tied into new power supply as shown on drawings. exist notification appiances replaced by new will be connected to new.

Open the permit page

$32,985
Apr 30, 2024Completed
final sign-off May 2024
101 02nd StPioneer Fire Inc.ti 202403077321- 5/fl- fire only relocate (63) pendents, add (11) pendents, remove (2) pendents
Details
Permit
202404301032
Permit issued
Apr 30, 2024
Final sign-off
May 30, 2024

ti 202403077321- 5/fl- fire only relocate (63) pendents, add (11) pendents, remove (2) pendents

Open the permit page

$11,100
Mar 26, 2024Completed
final sign-off Nov 2024
101 02nd StSource Planning And Construction Inc5th fl reference ti 202403077321. mech, electrical, plumbing
Details
Permit
202403268582
Permit issued
Mar 26, 2024
Final sign-off
Nov 8, 2024

5th fl reference ti 202403077321. mech, electrical, plumbing

Open the permit page

$142,670
Mar 7, 2024Completed
final sign-off Nov 2024
101 02nd StSource Planning And Construction Inc5th fl tenant improvement. mep defferred
Details
Permit
202403077321
Permit issued
Mar 19, 2024
Final sign-off
Nov 8, 2024

5th fl tenant improvement. mep defferred

Open the permit page

$758,000
Mar 5, 2024Completed
final sign-off Apr 2024
101 02nd StSabah International Incorporated10/f: as built permit 202310037869. revised (2) wall mounted speaker strobes - 10/f. add (1) control relay - 1/f. add (1) dual input module - 1/f. add (1) riser module - 1/f.
Details
Permit
202403057080
Permit issued
Mar 5, 2024
Final sign-off
Apr 10, 2024

10/f: as built permit 202310037869. revised (2) wall mounted speaker strobes - 10/f. add (1) control relay - 1/f. add (1) dual input module - 1/f. add (1) riser module - 1/f.

Open the permit page

Nov 20, 2023Completed
final sign-off Dec 2023
585 Mission Stt.i. to (e) fire sprinkler system. relocated sprinkler 8, add sprinklers 6, remove 2. ref t.i. pa202308184774.
Details
Permit
202311201097
Permit issued
Nov 21, 2023
Final sign-off
Dec 11, 2023

t.i. to (e) fire sprinkler system. relocated sprinkler 8, add sprinklers 6, remove 2. ref t.i. pa202308184774.

Open the permit page

$14,000
Nov 8, 2023Completed
final sign-off Mar 2024
101 02nd StSabah International Incorporatedref 202302222355. provide a modification of the (e) fire alarm system. relocate (1) manuel pull station on 1st fl. demo 2 (e) speaker strobes. add 1 new booster power supply.
Details
Permit
202311080396
Permit issued
Nov 21, 2023
Final sign-off
Mar 7, 2024

ref 202302222355. provide a modification of the (e) fire alarm system. relocate (1) manuel pull station on 1st fl. demo 2 (e) speaker strobes. add 1 new booster power supply.

Open the permit page

$16,375
Oct 4, 2023Completed
final sign-off Nov 2023
101 02nd StMaguire Inc Dba Lahue And Associatesinstallation of evacuation maps on level 25
Details
Permit
202310047979
Permit issued
Oct 4, 2023
Final sign-off
Nov 21, 2023

installation of evacuation maps on level 25

Open the permit page

$2,000
Oct 3, 2023Completed
final sign-off Apr 2024
101 02nd StSabah International Incorporated10/f: provide modification of the existing fire alarm system, ref ti pa# 202309086144.
Details
Permit
202310037869
Permit issued
Nov 21, 2023
Final sign-off
Apr 10, 2024

10/f: provide modification of the existing fire alarm system, ref ti pa# 202309086144.

Open the permit page

$28,005
Sep 8, 2023Completed
final sign-off Nov 2023
101 02nd St10/f:t.i. improvement for the sprinkler per the new rsp and floor layout, new sprinkler head 19, delete sprinkler heads 2, relocate 43 heads, existing sprinkler 83. ref pa# 2023-0726-2989.
Details
Permit
202309086144
Permit issued
Sep 8, 2023
Final sign-off
Nov 1, 2023

10/f:t.i. improvement for the sprinkler per the new rsp and floor layout, new sprinkler head 19, delete sprinkler heads 2, relocate 43 heads, existing sprinkler 83. ref pa# 2023-0726-2989.

Open the permit page

$18,500
Aug 29, 2023Completed
final sign-off Sep 2023
101 02nd StSabah International Incorporatedrelocate the (e) smoke detector at the passenger elevator lobby to the high point ceiling of the passenger elevator lobby as shown on the drawings. ref 202305047064.
Details
Permit
202308295470
Permit issued
Aug 29, 2023
Final sign-off
Sep 22, 2023

relocate the (e) smoke detector at the passenger elevator lobby to the high point ceiling of the passenger elevator lobby as shown on the drawings. ref 202305047064.

Open the permit page

$8,080
Aug 18, 2023Never finaled
issued Sep 2023, no final
585 Mission StSkyline Constructionste 100c - tenant improvement for a bank branch including new millwork for transactions done at new atm.
Details
Permit
202308184774
Permit issued
Sep 7, 2023

ste 100c - tenant improvement for a bank branch including new millwork for transactions done at new atm.

Open the permit page

$250,000
Aug 15, 2023Never finaled
issued Aug 2023, no final
101 02nd StSabah International Incorporated25/f: provide modification of existing fire alarm system, ref pa# 2023-0524-8518
Details
Permit
202308154405
Permit issued
Aug 15, 2023

25/f: provide modification of existing fire alarm system, ref pa# 2023-0524-8518

Open the permit page

$22,617
Jul 26, 2023Completed
final sign-off Jul 2024
101 02nd StSkyline Construction10th floor: interior t.i of existing office space. consist of non structural partitons, office front glazing system, restroom finishes, mep systems.
Details
Permit
202307262989
Permit issued
Aug 16, 2023
Final sign-off
Jul 26, 2024

10th floor: interior t.i of existing office space. consist of non structural partitons, office front glazing system, restroom finishes, mep systems.

Open the permit page

$500,000
Jul 24, 2023Completed
final sign-off Sep 2023
101 02nd St25/f: installation of new fire sprinklers to the new proposed ceiling layout as shown on plans. ref pa# 202305248518.
Details
Permit
202307242771
Permit issued
Jul 25, 2023
Final sign-off
Sep 8, 2023

25/f: installation of new fire sprinklers to the new proposed ceiling layout as shown on plans. ref pa# 202305248518.

Open the permit page

$27,000
Jun 30, 2023Completed
final sign-off Nov 2023
101 02nd StSource Planning And Construction Increplace (e) corridor lighting and controls to be t24 completed new lighting in elevator and restroom. added power for card readers
Details
Permit
202306301336
Permit issued
Jul 3, 2023
Final sign-off
Nov 6, 2023

replace (e) corridor lighting and controls to be t24 completed new lighting in elevator and restroom. added power for card readers

Open the permit page

$58,000
Jun 21, 2023Completed
final sign-off Jul 2023
101 02nd StPioneer Fire Inc.relocate 2 pendents. t.i. pa 202305047064.
Details
Permit
202306210481
Permit issued
Jul 6, 2023
Final sign-off
Jul 26, 2023

relocate 2 pendents. t.i. pa 202305047064.

Open the permit page

$500
May 24, 2023Completed
final sign-off Oct 2024
101 02nd StSkyline Construction25 floor: office tenant improvement for approximately 12000 sqft of the 25th floor, including 2 new new gender neutral restrooms
Details
Permit
202305248518
Permit issued
Jun 23, 2023
Final sign-off
Oct 1, 2024

25 floor: office tenant improvement for approximately 12000 sqft of the 25th floor, including 2 new new gender neutral restrooms

Open the permit page

$1,200,000
May 23, 2023Completed
final sign-off Nov 2023
101 02nd StSource Planning And Construction Increvision to 202302222355 revised structural details
Details
Permit
202305238434
Permit issued
May 24, 2023
Final sign-off
Nov 7, 2023

revision to 202302222355 revised structural details

Open the permit page

May 23, 2023Never finaled
issued May 2023, no final
585 Mission Stper pa #202302222355, add address to new storefront on apn 3721/089 as; 585 mission street
Details
Permit
M1230947
Permit issued
May 23, 2023

per pa #202302222355, add address to new storefront on apn 3721/089 as; 585 mission street

Open the permit page

May 4, 2023Completed
final sign-off Nov 2023
101 02nd StSource Planning And Construction Inc16th fl modification of e elevator lobby and corridor and restrooms. improvements include selective demo and construction of non load bearing partitions. new ceiling tiles in e ceiling grids. new light fix,flooring, finishes
Details
Permit
202305047064
Permit issued
Jun 8, 2023
Final sign-off
Nov 6, 2023

16th fl modification of e elevator lobby and corridor and restrooms. improvements include selective demo and construction of non load bearing partitions. new ceiling tiles in e ceiling grids. new light fix,flooring, finishes

Open the permit page

$375,000
Mar 20, 2023Completed
final sign-off Apr 2023
101 02nd StSabah International Incorporated22/f:as-built to pa# 202208251221, changes made to system design during installtion of the 22nd flr t.i., add 1-new smoke detector (room# 22002 & 22033).
Details
Permit
202303203948
Permit issued
Mar 20, 2023
Final sign-off
Apr 3, 2023

22/f:as-built to pa# 202208251221, changes made to system design during installtion of the 22nd flr t.i., add 1-new smoke detector (room# 22002 & 22033).

Open the permit page

Feb 23, 2023Completed
final sign-off Mar 2023
101 02nd StPioneer Fire Inc.1/f suite 100 & 100c: as built fire sprinklers, ref pa# 202302091667 & t.i. 202212017495
Details
Permit
202302232438
Permit issued
Feb 23, 2023
Final sign-off
Mar 3, 2023

1/f suite 100 & 100c: as built fire sprinklers, ref pa# 202302091667 & t.i. 202212017495

Open the permit page

Feb 22, 2023Completed
final sign-off Nov 2023
101 02nd StSource Planning And Construction Incunit 100c: new recessed entry/exit alcove, new storefront on mission street, new entry door, sidelight, modificaiton to street level facade @ alcove, minor concrete flatwork & finish at alcove
Details
Permit
202302222355
Permit issued
Mar 9, 2023
Final sign-off
Nov 10, 2023

unit 100c: new recessed entry/exit alcove, new storefront on mission street, new entry door, sidelight, modificaiton to street level facade @ alcove, minor concrete flatwork & finish at alcove

Open the permit page

$250,000
Feb 9, 2023Completed
final sign-off Mar 2023
101 02nd StPioneer Fire Inc.convert 71 pendent sprinklers to upright configuration. remove 4 pendent sprinkler heads. ref pa 2022-1201-7495
Details
Permit
202302091667
Permit issued
Feb 9, 2023
Final sign-off
Mar 3, 2023

convert 71 pendent sprinklers to upright configuration. remove 4 pendent sprinkler heads. ref pa 2022-1201-7495

Open the permit page

$9,900
Dec 6, 2022Completed
final sign-off Dec 2022
101 02nd StSabah International Incorporatedref pa# 202209202740, as-built permit.
Details
Permit
202212067706
Permit issued
Dec 6, 2022
Final sign-off
Dec 19, 2022

ref pa# 202209202740, as-built permit.

Open the permit page

Dec 6, 2022Completed
final sign-off May 2023
101 02nd StSource Planning And Construction Incsuite 100c: demolition of non-load bearing partitions, light fixtures and finishes. new light fixtures/switching and new finishes. mep deferred.
Details
Permit
202212067739
Permit issued
Dec 20, 2022
Final sign-off
May 18, 2023

suite 100c: demolition of non-load bearing partitions, light fixtures and finishes. new light fixtures/switching and new finishes. mep deferred.

Open the permit page

$85,000
Dec 1, 2022Completed
final sign-off May 2023
101 02nd StSource Planning And Construction Incste #100 a & b: work includes selective demolition of non-bearing partitions, lightings and finishes, construction of new demising partitions, new light fixtures/ switches and new finishes.
Details
Permit
202212017495
Permit issued
Dec 20, 2022
Final sign-off
May 18, 2023

ste #100 a & b: work includes selective demolition of non-bearing partitions, lightings and finishes, construction of new demising partitions, new light fixtures/ switches and new finishes.

Open the permit page

$150,000
Sep 20, 2022Completed
final sign-off Dec 2022
101 02nd StSabah International Incorporated21/f: provide modification of existing fa system. ref 202205124159. add (1) booster power supply, (1) constrol relays, (1) synchronization output modules, (9) ceiling speaker/strobes and 19 wall speaker/strobes.
Details
Permit
202209202740
Permit issued
Sep 20, 2022
Final sign-off
Dec 19, 2022

21/f: provide modification of existing fa system. ref 202205124159. add (1) booster power supply, (1) constrol relays, (1) synchronization output modules, (9) ceiling speaker/strobes and 19 wall speaker/strobes.

Open the permit page

$54,205
Aug 25, 2022Completed
final sign-off Apr 2023
101 02nd StSabah International Incorporatedprovide modification of (e) fire alarm system . add booster power supply , (13) duct smoke det. (13) control relays (1) sync output modules, (1) ceiling strobe, (32) ceiling speaker/strobes and (6) wall speaker/strobes.
Details
Permit
202208251221
Permit issued
Aug 25, 2022
Final sign-off
Apr 3, 2023

provide modification of (e) fire alarm system . add booster power supply , (13) duct smoke det. (13) control relays (1) sync output modules, (1) ceiling strobe, (32) ceiling speaker/strobes and (6) wall speaker/strobes.

Open the permit page

$54,205
Aug 25, 2022Completed
final sign-off Oct 2022
101 02nd StSabah International Incorporatedti ref pa 202205124159 and 202205134215. add (3) new two way emergency communication call boxes to an existing system. emergency call stations will be installed on 21st fl passenger elev. lobby and service and 22nd fl service elevator .
Details
Permit
202208251217
Permit issued
Aug 25, 2022
Final sign-off
Oct 17, 2022

ti ref pa 202205124159 and 202205134215. add (3) new two way emergency communication call boxes to an existing system. emergency call stations will be installed on 21st fl passenger elev. lobby and service and 22nd fl service elevator .

Open the permit page

$14,750
Aug 23, 2022Completed
final sign-off Jan 2023
101 02nd StSabah International Incorporated24/f: ti#202205033424. modify (e) f/a system, add (1) single signature driver controller, (1) booster power supply, (16) duct smoke detectors, (17) high power control relays, (1) sync output module, (1) led ceiling strobers, (30) led ceiling speaker/strobes, (7) led wall speaker/strobes
Details
Permit
202208231036
Permit issued
Aug 23, 2022
Final sign-off
Jan 6, 2023

24/f: ti#202205033424. modify (e) f/a system, add (1) single signature driver controller, (1) booster power supply, (16) duct smoke detectors, (17) high power control relays, (1) sync output module, (1) led ceiling strobers, (30) led ceiling speaker/strobes, (7) led wall speaker/strobes

Open the permit page

$39,845
Aug 23, 2022Expired or cancelled
cancelled Jan 2026
101 02nd St2/f: non-structural demo. new non-structural partitions, door/frame/hardware, millwork, finishes. no change in occupancy, use or area. mep included in the set. life safety and sprinklers under separate permit.
Details
Permit
202208231073

2/f: non-structural demo. new non-structural partitions, door/frame/hardware, millwork, finishes. no change in occupancy, use or area. mep included in the set. life safety and sprinklers under separate permit.

Open the permit page

$211,514
Aug 1, 2022Never finaled
issued Aug 2022, no final
101 02nd StGolden Gate Fire Protection Inc24/f: relocate 111 fire sprinkler pendents, 17 concearled pendents and 2 uprights on the 24rd floor. ref t.i. pa202205033424
Details
Permit
202208019632
Permit issued
Aug 1, 2022

24/f: relocate 111 fire sprinkler pendents, 17 concearled pendents and 2 uprights on the 24rd floor. ref t.i. pa202205033424

Open the permit page

$68,250
Aug 1, 2022Completed
final sign-off Sep 2022
101 02nd StGolden Gate Fire Protection Inc23/f: relocate 114 fire sprinkler pendents, 11 concearled pendents and 4 uprights on the 23rd floor. ref t.i. pa202205033426
Details
Permit
202208019631
Permit issued
Aug 1, 2022
Final sign-off
Sep 13, 2022

23/f: relocate 114 fire sprinkler pendents, 11 concearled pendents and 4 uprights on the 23rd floor. ref t.i. pa202205033426

Open the permit page

$67,725
Jul 22, 2022Completed
final sign-off Oct 2022
101 02nd StAyoob & Peery Plumbing Co Inc21st & 22nd fl: add & relocate sprinklers as neccesary in accordamce with t.i.. install pipe hangers as needed for new sprinkler pipe.
Details
Permit
202207229185
Permit issued
Oct 12, 2022
Final sign-off
Oct 28, 2022

21st & 22nd fl: add & relocate sprinklers as neccesary in accordamce with t.i.. install pipe hangers as needed for new sprinkler pipe.

Open the permit page

$87,720
Jul 21, 2022Completed
final sign-off Jan 2023
101 02nd StSabah International Incorporated23/f: provide modification to (e) fire alarm system add 1 booster power supply, 17 duct detector smoke, 18 control relays, 1 sync output module, 5 ceiling strobes, 29 ceiling speakers/strobes, and 8 wall speaker/strobes add 2 new two-way emergency communcation call boxes to (e) system
Details
Permit
202207218987
Permit issued
Jul 21, 2022
Final sign-off
Jan 6, 2023

23/f: provide modification to (e) fire alarm system add 1 booster power supply, 17 duct detector smoke, 18 control relays, 1 sync output module, 5 ceiling strobes, 29 ceiling speakers/strobes, and 8 wall speaker/strobes add 2 new two-way emergency communcation call boxes to (e) system

Open the permit page

$36,395
Jul 20, 2022Completed
final sign-off Sep 2022
101 02nd StSabah International Incorporated2nd floor: voluntary modify extg fire alarm system. add one new control relay for access control override.
Details
Permit
202207208928
Permit issued
Jul 21, 2022
Final sign-off
Sep 23, 2022

2nd floor: voluntary modify extg fire alarm system. add one new control relay for access control override.

Open the permit page

$11,840
Jul 11, 2022Never finaled
issued Aug 2022, no final
101 02nd StClune Construction Company L P23/f: revision to bpa#202205033426 to include selective demo, construction of an employee breakroom/pantry, casework, finishes, ceiling, lighting, electrical, & mechanical
Details
Permit
202207118125
Permit issued
Aug 16, 2022

23/f: revision to bpa#202205033426 to include selective demo, construction of an employee breakroom/pantry, casework, finishes, ceiling, lighting, electrical, & mechanical

Open the permit page

Jul 11, 2022Never finaled
issued Aug 2022, no final
101 02nd StClune Construction Company L P24/f: revision to bpa#202205033424 to include selective demo, construction of an employee breakroom/pantry, casework, finishes, ceiling, lighting, electrical, & mechanical
Details
Permit
202207118124
Permit issued
Aug 16, 2022

24/f: revision to bpa#202205033424 to include selective demo, construction of an employee breakroom/pantry, casework, finishes, ceiling, lighting, electrical, & mechanical

Open the permit page

May 19, 2022Completed
final sign-off Jun 2022
101 02nd StSabah International Incorporated22nd fl: modify (e) fire system. demo 9 speaker/ strobes, 5 strobes, 7 speakers, 2 smoke detectors, 1 control relay. ref pa# 202203240808.
Details
Permit
202205194562
Permit issued
May 19, 2022
Final sign-off
Jun 14, 2022

22nd fl: modify (e) fire system. demo 9 speaker/ strobes, 5 strobes, 7 speakers, 2 smoke detectors, 1 control relay. ref pa# 202203240808.

Open the permit page

$7,000
May 13, 2022Completed
final sign-off Apr 2023
101 02nd StBcci Construction Company22nd fl: full floor t.i. structural work at new skyfold partitions. add 2 new fsd's.
Details
Permit
202205134215
Permit issued
Jun 1, 2022
Final sign-off
Apr 10, 2023

22nd fl: full floor t.i. structural work at new skyfold partitions. add 2 new fsd's.

Open the permit page

$750,000
May 12, 2022Completed
final sign-off Mar 2023
101 02nd StBcci Construction Company21st fl: partial floor tenant improvement. mep included. ref # 202108176536
Details
Permit
202205124159
Permit issued
Jun 1, 2022
Final sign-off
Mar 15, 2023

21st fl: partial floor tenant improvement. mep included. ref # 202108176536

Open the permit page

$210,000
May 3, 2022Completed
final sign-off May 2023
101 02nd StClune Construction Company L P24th fl: office tenant improvement to include selective demolition, construction of employee breakroom / panyry. new non-structural partitions, finishes, ceiling, lighting, electrical and mechanical.
Details
Permit
202205033424
Permit issued
Jun 15, 2022
Final sign-off
May 12, 2023

24th fl: office tenant improvement to include selective demolition, construction of employee breakroom / panyry. new non-structural partitions, finishes, ceiling, lighting, electrical and mechanical.

Open the permit page

$1,670,000
May 3, 2022Completed
final sign-off May 2023
101 02nd StClune Construction Company L P23rd fl: office tenant improvement to include selective demolition, construction of employee breakroom/pantry. new non-structural partitions, finishes, ceiling, lighting, electrical and mechanical.
Details
Permit
202205033426
Permit issued
Jun 15, 2022
Final sign-off
May 12, 2023

23rd fl: office tenant improvement to include selective demolition, construction of employee breakroom/pantry. new non-structural partitions, finishes, ceiling, lighting, electrical and mechanical.

Open the permit page

$1,670,000
Apr 19, 2022Completed
final sign-off Aug 2022
101 02nd Stvoluntary elevator modification. remove 10 (e) pendent sprinklers from low rise mech. remove 8 (e) upright sprinklers in high rise mech per sffd letter dated 2/14/2022.
Details
Permit
202204192468
Permit issued
Apr 19, 2022
Final sign-off
Aug 9, 2022

voluntary elevator modification. remove 10 (e) pendent sprinklers from low rise mech. remove 8 (e) upright sprinklers in high rise mech per sffd letter dated 2/14/2022.

Open the permit page

$1,000
Mar 24, 2022Completed
final sign-off Jun 2022
101 02nd StBcci Construction Company21st and 22nd full floors demo only of interior office space per ab017 sprinkler permit 202203220598
Details
Permit
202203240808
Permit issued
Mar 25, 2022
Final sign-off
Jun 10, 2022

21st and 22nd full floors demo only of interior office space per ab017 sprinkler permit 202203220598

Open the permit page

$50,000
Mar 22, 2022Completed
final sign-off Jun 2022
101 02nd StAyoob & Peery Plumbing Co Incdemo 22nd flr - flip 103 sprinklers to upright per ti job 22-625.
Details
Permit
202203220598
Permit issued
Mar 22, 2022
Final sign-off
Jun 9, 2022

demo 22nd flr - flip 103 sprinklers to upright per ti job 22-625.

Open the permit page

$23,175
Feb 25, 2022Completed
final sign-off Apr 2022
101 02nd StGolden Gate Fire Protection Incfire sprinkler relocate 113 upright sprinklers on the 25th floor
Details
Permit
202202258711
Permit issued
Feb 25, 2022
Final sign-off
Apr 18, 2022

fire sprinkler relocate 113 upright sprinklers on the 25th floor

Open the permit page

$56,500
Feb 15, 2022Completed
final sign-off Mar 2022
101 02nd StGolden Gate Fire Protection Inc23/f: fire sprinklers: relocate 113 upright spirnklers on 23/f floor.
Details
Permit
202202157979
Permit issued
Feb 15, 2022
Final sign-off
Mar 29, 2022

23/f: fire sprinklers: relocate 113 upright spirnklers on 23/f floor.

Open the permit page

$56,500
Feb 4, 2022Completed
final sign-off Mar 2022
101 02nd StSource Planning And Construction Inc23/f: selective demolition of non-load bearing partitions ceiling, light fixtures, millwork and finishes. ab-017. building is fully sprinklered.
Details
Permit
202202047397
Permit issued
Feb 23, 2022
Final sign-off
Mar 28, 2022

23/f: selective demolition of non-load bearing partitions ceiling, light fixtures, millwork and finishes. ab-017. building is fully sprinklered.

Open the permit page

Feb 4, 2022Completed
final sign-off Apr 2022
101 02nd StSource Planning And Construction Inc25/f: selective demolition of non-load bearing partitions ceiling, light fixtures, millwork and finishes. ab-017. building is fully sprinklered. bldg permit 202202258711
Details
Permit
202202047399
Permit issued
Mar 4, 2022
Final sign-off
Apr 14, 2022

25/f: selective demolition of non-load bearing partitions ceiling, light fixtures, millwork and finishes. ab-017. building is fully sprinklered. bldg permit 202202258711

Open the permit page

Jan 21, 2022Completed
final sign-off Jan 2022
101 02nd StSiemens Industry, Inc.suite 200: fire only work to obrain as-built permit for the "suite 200" remodel on floor 2. 7 fuct detectors were added and 3 were relocated from initial lift safety permit pa# 202103045876
Details
Permit
202201216359
Permit issued
Jan 21, 2022
Final sign-off
Jan 27, 2022

suite 200: fire only work to obrain as-built permit for the "suite 200" remodel on floor 2. 7 fuct detectors were added and 3 were relocated from initial lift safety permit pa# 202103045876

Open the permit page

$11,095
Dec 23, 2021Completed
final sign-off Dec 2021
101 02nd StSiemens Industry, Inc.fire only permit for "as-built" installation on the floor 18 "reed smith" remodel, original life safety permit ref pa #202108317443
Details
Permit
202112234943
Permit issued
Dec 23, 2021
Final sign-off
Dec 27, 2021

fire only permit for "as-built" installation on the floor 18 "reed smith" remodel, original life safety permit ref pa #202108317443

Open the permit page

Dec 10, 2021Completed
final sign-off Mar 2022
101 02nd StSource Planning And Construction Inc22nd fl restroom work, demo and construction of toilet partitions, new plumbing and finishes
Details
Permit
202112104148
Permit issued
Dec 13, 2021
Final sign-off
Mar 17, 2022

22nd fl restroom work, demo and construction of toilet partitions, new plumbing and finishes

Open the permit page

$31,000
Oct 13, 2021Completed
final sign-off Apr 2022
101 02nd StSabah International Incorporatedreplace (e) siemens f/a control unit w/new est-3 addressable f/a control unit. all (e) f/a initiating field devices shall be replaced like-for-like. no new cellular communicator panel provided.
Details
Permit
202110130343
Permit issued
Oct 28, 2021
Final sign-off
Apr 13, 2022

replace (e) siemens f/a control unit w/new est-3 addressable f/a control unit. all (e) f/a initiating field devices shall be replaced like-for-like. no new cellular communicator panel provided.

Open the permit page

$279,775
Oct 8, 2021Never finaled
issued Oct 2021, no final
101 02nd StSkyline Constructioninstall four (4) evac signage. ref #2021-0611-2248
Details
Permit
202110080109
Permit issued
Oct 8, 2021

install four (4) evac signage. ref #2021-0611-2248

Open the permit page

$750
Aug 31, 2021Completed
final sign-off Dec 2021
101 02nd StSiemens Industry, Inc.18th floor: fire only work for reed smith remodel on floor 18, 5 speaker strobes, 1 strobe, 1 module added, relocation 1 smoket detector and module. ref 202106112248
Details
Permit
202108317443
Permit issued
Sep 7, 2021
Final sign-off
Dec 27, 2021

18th floor: fire only work for reed smith remodel on floor 18, 5 speaker strobes, 1 strobe, 1 module added, relocation 1 smoket detector and module. ref 202106112248

Open the permit page

$4,500
Aug 17, 2021Never finaled
issued Aug 2021, no final
101 02nd StSabah International Incorporated2 new two-way comm systemntrol unit at 1/f, (1) main control unit at 14/f; (1) master consle at 1/f fcc room, (1) telephone interface; (2) relay isolation module & (12) remote call stations. maher n/a.
Details
Permit
202108176536
Permit issued
Aug 26, 2021

2 new two-way comm systemntrol unit at 1/f, (1) main control unit at 14/f; (1) master consle at 1/f fcc room, (1) telephone interface; (2) relay isolation module & (12) remote call stations. maher n/a.

Open the permit page

$30,000
Aug 2, 2021Completed
final sign-off Oct 2021
101 02nd StGolden Gate Fire Protection Incfire sprinklers relocate 23 pendent sprinkers and relocate 2 uprights on 18th fl ref 202107063759 and 202106112248
Details
Permit
202108025564
Permit issued
Aug 3, 2021
Final sign-off
Oct 20, 2021

fire sprinklers relocate 23 pendent sprinkers and relocate 2 uprights on 18th fl ref 202107063759 and 202106112248

Open the permit page

$13,125
Jul 6, 2021Completed
final sign-off Jan 2022
101 02nd StSkyline Construction18th floor:revision to pa #2021-0611-2248. occupancy load change count.
Details
Permit
202107063759
Permit issued
Jul 8, 2021
Final sign-off
Jan 31, 2022

18th floor:revision to pa #2021-0611-2248. occupancy load change count.

Open the permit page

Jun 14, 2021Never finaled
issued Jun 2021, no final
101 02nd StPioneer Fire Inc.as-built submiital to permit #2020-0429-9601 add 1 upright sprinkler in new closet at lowrise elevator lobby.
Details
Permit
202106142324
Permit issued
Jun 15, 2021

as-built submiital to permit #2020-0429-9601 add 1 upright sprinkler in new closet at lowrise elevator lobby.

Open the permit page

Jun 11, 2021Completed
final sign-off Jan 2022
101 02nd StSkyline Construction18th flr - construction of non-structural partitions. office front glazing system. acoustical grid tile & gyp board ceilings, light fixtures, millwork restroom finishes. mep included.
Details
Permit
202106112248
Permit issued
Jun 16, 2021
Final sign-off
Jan 31, 2022

18th flr - construction of non-structural partitions. office front glazing system. acoustical grid tile & gyp board ceilings, light fixtures, millwork restroom finishes. mep included.

Open the permit page

Apr 29, 2021Completed
final sign-off Jul 2021
101 02nd StPioneer Fire Inc.as built to fire permit 2021-0225-5388. add 4 concealed sprinkler heads in elevator lobby gc t!# 2021-0108-2353
Details
Permit
202104299601
Permit issued
Jun 9, 2021
Final sign-off
Jul 12, 2021

as built to fire permit 2021-0225-5388. add 4 concealed sprinkler heads in elevator lobby gc t!# 2021-0108-2353

Open the permit page

Apr 12, 2021Expired or cancelled
cancelled Jan 2026
101 02nd StSource Planning And Construction Incste 200: revision to pa# 202101082353. new finishes, millwork & lighting in men's & women's accessible restrooms & elevator lobby.
Details
Permit
202104128339

ste 200: revision to pa# 202101082353. new finishes, millwork & lighting in men's & women's accessible restrooms & elevator lobby.

Open the permit page

$150,000
Mar 4, 2021Completed
final sign-off Sep 2021
101 02nd StSiemens Industry, Inc.fire only work for the "suite 200 remodel on floor 2; additions are 4 smoke detectors, 3 duct detectors, 1 module, 2 speakers, 21 speaker/strobes, 4 strobes, and 1 strobe power supply. ref permit app # 2021 0108 2353
Details
Permit
202103045876
Permit issued
Mar 30, 2021
Final sign-off
Sep 29, 2021

fire only work for the "suite 200 remodel on floor 2; additions are 4 smoke detectors, 3 duct detectors, 1 module, 2 speakers, 21 speaker/strobes, 4 strobes, and 1 strobe power supply. ref permit app # 2021 0108 2353

Open the permit page

$26,180
Feb 25, 2021Completed
final sign-off Jun 2021
101 02nd StPioneer Fire Inc.relocate (19) pendent sprinklers, (16) upright sprinklers, (87) pendents converted to upright sprinklers, remove (30) pendents. gc ti# 2021 0108 2353
Details
Permit
202102255388
Permit issued
Mar 23, 2021
Final sign-off
Jun 29, 2021

relocate (19) pendent sprinklers, (16) upright sprinklers, (87) pendents converted to upright sprinklers, remove (30) pendents. gc ti# 2021 0108 2353

Open the permit page

Jan 27, 2021Completed
final sign-off May 2021
101 02nd StSkyline Constructioninstallation of 4 evac signs for the 17th floor.
Details
Permit
202101273455
Permit issued
Mar 3, 2021
Final sign-off
May 18, 2021

installation of 4 evac signs for the 17th floor.

Open the permit page

$1,200
Jan 8, 2021Completed
final sign-off Feb 2022
101 02nd StSource Planning And Construction Incsuite 200 - t.i. modification include selective demo & contruction of non-load partitions, new doors, frames, new ceiling grid, light fixture, millwork & finish
Details
Permit
202101082353
Permit issued
Mar 29, 2021
Final sign-off
Feb 22, 2022

suite 200 - t.i. modification include selective demo & contruction of non-load partitions, new doors, frames, new ceiling grid, light fixture, millwork & finish

Open the permit page

$2,010,000
Dec 24, 2020Completed
final sign-off Apr 2021
101 02nd StBilcor Incfire life safety: install (2) two-way call station on 17th fl reference ti: 2020-0901-3207, 2020-1208-0529.
Details
Permit
202012241724
Permit issued
Feb 4, 2021
Final sign-off
Apr 14, 2021

fire life safety: install (2) two-way call station on 17th fl reference ti: 2020-0901-3207, 2020-1208-0529.

Open the permit page

$1,320
Dec 17, 2020Completed
final sign-off Mar 2021
101 02nd StGolden Gate Fire Protection Incfire sprinkler only. ref # 2020-0901-3207. relocate 68 pendents & 1 upright for reed smith 17th floor
Details
Permit
202012171260
Permit issued
Feb 1, 2021
Final sign-off
Mar 19, 2021

fire sprinkler only. ref # 2020-0901-3207. relocate 68 pendents & 1 upright for reed smith 17th floor

Open the permit page

$34,500
Dec 8, 2020Completed
final sign-off Jun 2021
101 02nd StSiemens Industry, Inc.fire alarm work for the reed smith remodel on floor 17; additions are 5 smoke detectors, 1 strobe power supply, 3 speakers, 24 speaker/strobes, and 2 strobes. ref. permit app #2020-0901-3207.
Details
Permit
202012080529
Permit issued
Jan 15, 2021
Final sign-off
Jun 29, 2021

fire alarm work for the reed smith remodel on floor 17; additions are 5 smoke detectors, 1 strobe power supply, 3 speakers, 24 speaker/strobes, and 2 strobes. ref. permit app #2020-0901-3207.

Open the permit page

$23,000
Sep 1, 2020Completed
final sign-off Jun 2021
101 02nd StSkyline Construction17/f: new non-structural partitions, office front glazing system, acoustical grid & tile and byp board ceilings, light fixtures, mikllwork, restroom finishes/partitions/fixtures & overall finishes. mep included.
Details
Permit
202009013207
Permit issued
Sep 23, 2020
Final sign-off
Jun 8, 2021

17/f: new non-structural partitions, office front glazing system, acoustical grid & tile and byp board ceilings, light fixtures, mikllwork, restroom finishes/partitions/fixtures & overall finishes. mep included.

Open the permit page

Aug 18, 2020Completed
final sign-off Mar 2021
101 02nd StSkyline Construction4 evac signs for 20th flr
Details
Permit
202008182058
Permit issued
Aug 24, 2020
Final sign-off
Mar 1, 2021

4 evac signs for 20th flr

Open the permit page

$1,500
Aug 5, 2020Completed
final sign-off Aug 2020
101 02nd StBilcor Inc20th floor: fire life safety: install 2 two way call station. ref app#202002033392
Details
Permit
202008051188
Permit issued
Aug 14, 2020
Final sign-off
Aug 21, 2020

20th floor: fire life safety: install 2 two way call station. ref app#202002033392

Open the permit page

$1,320
Jul 17, 2020Never finaled
issued Aug 2020, no final
101 02nd StGolden Gate Fire Protection Incfire sprinklers: relocate 63 pendents, 17 concealed pendents and 3 upright on the 20/f
Details
Permit
202007170428
Permit issued
Aug 4, 2020

fire sprinklers: relocate 63 pendents, 17 concealed pendents and 3 upright on the 20/f

Open the permit page

$41,500
Jul 16, 2020Completed
final sign-off Aug 2020
101 02nd StSiemens Industry, Inc.fire alarm work for the "reed smith" remodel on 20/f; additions are 3 smoke detectors, 1 duct detector, 1 strobe supply, 7 speakers, 21 speaker/strobes, and 2 strobes; ref bldg pa# 202002033392.
Details
Permit
202007160339
Permit issued
Jul 20, 2020
Final sign-off
Aug 21, 2020

fire alarm work for the "reed smith" remodel on 20/f; additions are 3 smoke detectors, 1 duct detector, 1 strobe supply, 7 speakers, 21 speaker/strobes, and 2 strobes; ref bldg pa# 202002033392.

Open the permit page

$24,800
Jun 12, 2020Never finaled
filed Jun 2020, never issued
101 02nd StBilcor Inc20/f: fire life safety:-install (2) two-way call stations. reference ti#: 2020-0203-3392
Details
Permit
202006128596

20/f: fire life safety:-install (2) two-way call stations. reference ti#: 2020-0203-3392

Open the permit page

$1,320
May 4, 2020Never finaled
issued May 2020, no final
101 02nd StSiemens Industry, Inc.4th floor: fire alarm additions of 2 speaker/strobes for the conference room remodels. reference pa #2020-0220-4943
Details
Permit
202005047292
Permit issued
May 29, 2020

4th floor: fire alarm additions of 2 speaker/strobes for the conference room remodels. reference pa #2020-0220-4943

Open the permit page

$1,270
Apr 29, 2020Completed
final sign-off Mar 2021
101 02nd StSkyline Constructionemergency evacuation signage. providing the 19th floor of 101 2nd street, four (4) emergency evacuation signs.
Details
Permit
202004297266
Permit issued
Jul 20, 2020
Final sign-off
Mar 1, 2021

emergency evacuation signage. providing the 19th floor of 101 2nd street, four (4) emergency evacuation signs.

Open the permit page

$1,500
Mar 10, 2020Completed
final sign-off Oct 2020
101 02nd StGolden Gate Fire Protection Incfire sprinkler only for 4th fl - relocate 2 pendents; add 1 for rocket lawyer suite #400. ref pa #202002204943.
Details
Permit
202003106586
Permit issued
Mar 10, 2020
Final sign-off
Oct 15, 2020

fire sprinkler only for 4th fl - relocate 2 pendents; add 1 for rocket lawyer suite #400. ref pa #202002204943.

Open the permit page

$1,500
Mar 4, 2020Completed
final sign-off May 2020
101 02nd St6th fl evacuation plan (4 total)
Details
Permit
202003046118
Permit issued
Mar 4, 2020
Final sign-off
May 14, 2020

6th fl evacuation plan (4 total)

Open the permit page

$2,000
Feb 21, 2020Completed
final sign-off Jun 2021
101 02nd StSkyline Constructionrevisiion to pa#201911126952 for 19/f - reinstate card readers at elevator lobbies. two-way comm defered pa#202002194773.
Details
Permit
202002215092
Permit issued
Feb 24, 2020
Final sign-off
Jun 9, 2021

revisiion to pa#201911126952 for 19/f - reinstate card readers at elevator lobbies. two-way comm defered pa#202002194773.

Open the permit page

Feb 20, 2020Never finaled
issued Feb 2020, no final
101 02nd StSkyline Constructionrevision 2010911217863 to install 2 way communication system and card readers to comply with 10101.9.13 maher not req
Details
Permit
202002204951
Permit issued
Feb 24, 2020

revision 2010911217863 to install 2 way communication system and card readers to comply with 10101.9.13 maher not req

Open the permit page

Feb 20, 2020Completed
final sign-off Jun 2020
101 02nd StSource Planning And Construction Incthis t.i. project involves modification of an extg tenant suite to include construction of non-load bearing partitions, nw doors & frames, new lighting & controls, new millwork and new finishes.
Details
Permit
202002204943
Permit issued
Feb 21, 2020
Final sign-off
Jun 2, 2020

this t.i. project involves modification of an extg tenant suite to include construction of non-load bearing partitions, nw doors & frames, new lighting & controls, new millwork and new finishes.

Open the permit page

$125,000
Feb 19, 2020Completed
final sign-off Jan 2022
101 02nd StBilcor Incref pa# 201911126952; fire alarm: install (2) two way call station, install 1 line fault monitor n/a maher
Details
Permit
202002194773
Permit issued
Feb 19, 2020
Final sign-off
Jan 6, 2022

ref pa# 201911126952; fire alarm: install (2) two way call station, install 1 line fault monitor n/a maher

Open the permit page

$1,980
Feb 19, 2020Expired or cancelled
cancelled Jan 2026
101 02nd StMatrix Hg Incsuite 800: install water source heat pump to serve existing idf closet.
Details
Permit
202002194824

suite 800: install water source heat pump to serve existing idf closet.

Open the permit page

$39,408
Feb 13, 2020Completed
final sign-off Apr 2020
101 02nd StBilcor Incref pa# 201911217863; fire alarm ti: install (2) two-way call stations, install (1) line fault monitor on the 6/f elev lobby. fire alarm for monitoring call boxes under sep permit.
Details
Permit
202002134343
Permit issued
Feb 13, 2020
Final sign-off
Apr 30, 2020

ref pa# 201911217863; fire alarm ti: install (2) two-way call stations, install (1) line fault monitor on the 6/f elev lobby. fire alarm for monitoring call boxes under sep permit.

Open the permit page

$1,980
Feb 7, 2020Completed
final sign-off Apr 2020
101 02nd StSiemens Industry, Inc.ref pa# 201911217863; fire alarm work for the "hashicorp" remodel on floor 6; additions are 5 smoke detectors, 11 duct detectores, 1 strobe power supply, 33 speaker/strobes, and 10 speakers
Details
Permit
202002073802
Permit issued
Feb 7, 2020
Final sign-off
Apr 30, 2020

ref pa# 201911217863; fire alarm work for the "hashicorp" remodel on floor 6; additions are 5 smoke detectors, 11 duct detectores, 1 strobe power supply, 33 speaker/strobes, and 10 speakers

Open the permit page

$48,630
Feb 3, 2020Completed
final sign-off May 2021
101 02nd StSkyline Construction20/f -non-structural partitions, office front glazing system, accoustical grid & tile and gypsum boards ceilings, light fixtures, millwork, restroom finishes/partitions/fixtures and overall finishes. sprinkler, life safety, two way comm under sep permit.
Details
Permit
202002033392
Permit issued
Feb 7, 2020
Final sign-off
May 20, 2021

20/f -non-structural partitions, office front glazing system, accoustical grid & tile and gypsum boards ceilings, light fixtures, millwork, restroom finishes/partitions/fixtures and overall finishes. sprinkler, life safety, two way comm under sep permit.

Open the permit page

Jan 31, 2020Completed
final sign-off Apr 2020
101 02nd StSiemens Industry, Inc.fire alarm work for the reed smith remodel floor 19, additions are 6 smoke det, 2 duct detectors, 2 modules, 1 strobe, power supply, 6 speakers, 21 speaker strobes, 1 strobe, ref 201911126952
Details
Permit
202001313216
Permit issued
Jan 31, 2020
Final sign-off
Apr 30, 2020

fire alarm work for the reed smith remodel floor 19, additions are 6 smoke det, 2 duct detectors, 2 modules, 1 strobe, power supply, 6 speakers, 21 speaker strobes, 1 strobe, ref 201911126952

Open the permit page

$26,600
Jan 28, 2020Completed
final sign-off Mar 2020
101 02nd StSource Planning And Construction Inc24/f - selective demolition of non-load bearing partitions, ceilings, light fixtures, millwork and finishes// sprinklers on separate permit # 202001242697. ab-017 applies.
Details
Permit
202001282921
Permit issued
Feb 4, 2020
Final sign-off
Mar 3, 2020

24/f - selective demolition of non-load bearing partitions, ceilings, light fixtures, millwork and finishes// sprinklers on separate permit # 202001242697. ab-017 applies.

Open the permit page

$223,855
Jan 24, 2020Completed
final sign-off Apr 2020
101 02nd StPioneer Fire Inc.return to shell condition
Details
Permit
202001242697
Permit issued
Jan 24, 2020
Final sign-off
Apr 30, 2020

return to shell condition

Open the permit page

$18,250
Jan 14, 2020Completed
final sign-off Apr 2020
101 02nd StGolden Gate Fire Protection Incfire sprinkler only - relocate 77 pendents & relocate 4 uprights for reed smith, 19th fl.
Details
Permit
202001141826
Permit issued
Jan 14, 2020
Final sign-off
Apr 30, 2020

fire sprinkler only - relocate 77 pendents & relocate 4 uprights for reed smith, 19th fl.

Open the permit page

$40,000
Dec 11, 2019Completed
final sign-off Apr 2020
101 02nd StGolden Gate Fire Protection Inc6/f: fire sprinkler only- relocate 50 pendents for hashicorp on the 6th fl. ref t.i. 201911217863. n/a maher
Details
Permit
201912119209
Permit issued
Dec 12, 2019
Final sign-off
Apr 9, 2020

6/f: fire sprinkler only- relocate 50 pendents for hashicorp on the 6th fl. ref t.i. 201911217863. n/a maher

Open the permit page

$25,000
Nov 21, 2019Completed
final sign-off May 2020
101 02nd StSkyline Construction6th floor ti: new construction includes interior partitions, ceilings, mep, casework
Details
Permit
201911217863
Permit issued
Dec 9, 2019
Final sign-off
May 15, 2020

6th floor ti: new construction includes interior partitions, ceilings, mep, casework

Open the permit page

$1,100,000
Nov 19, 2019Completed
final sign-off Jun 2021
101 02nd StSkyline Constructioninstallation of mobile file cabinet system and ups batter cabinet in server room at 19th fl. def submittal in appvd permit 201911126952
Details
Permit
201911197667
Permit issued
Jan 14, 2020
Final sign-off
Jun 8, 2021

installation of mobile file cabinet system and ups batter cabinet in server room at 19th fl. def submittal in appvd permit 201911126952

Open the permit page

Nov 12, 2019Completed
final sign-off Jun 2021
101 02nd StSkyline Constructionnew non-structural partitons office front glazing system, accustical grid & tile & gyp board ceilings, light fixutes, millwork, restroom finishes, partion fixtures includes mep on the 19th fl. no changes to use exit stairs, egress path, elevator fire sprinkler & life safety
Details
Permit
201911126952
Permit issued
Nov 14, 2019
Final sign-off
Jun 9, 2021

new non-structural partitons office front glazing system, accustical grid & tile & gyp board ceilings, light fixutes, millwork, restroom finishes, partion fixtures includes mep on the 19th fl. no changes to use exit stairs, egress path, elevator fire sprinkler & life safety

Open the permit page

$8,250,000
Nov 7, 2019Never finaled
issued Nov 2019, no final
101 02nd StSkyline Constructioninterior demo only. demo of non load beraing partitions, doors, millwork, finishes, ceilings & lighting. no exterior work. no hazmat. no structural
Details
Permit
201911076698
Permit issued
Nov 18, 2019

interior demo only. demo of non load beraing partitions, doors, millwork, finishes, ceilings & lighting. no exterior work. no hazmat. no structural

Open the permit page

$75,600
Nov 1, 2019Expired or cancelled
cancelled Dec 2019
101 02nd StGolden Gate Fire Protection Inc6th fl. demo plan for 101 2nd st. relocate pendants to uprights 124 count
Details
Permit
201911016221
Permit issued
Nov 4, 2019

6th fl. demo plan for 101 2nd st. relocate pendants to uprights 124 count

Open the permit page

$62,000
Oct 17, 2019Completed
final sign-off Oct 2019
101 02nd StAyoob & Peery Plumbing Co Inc8th fl as-built for pa#201909242550
Details
Permit
201910174855
Permit issued
Oct 18, 2019
Final sign-off
Oct 22, 2019

8th fl as-built for pa#201909242550

Open the permit page

Oct 4, 2019Completed
final sign-off Oct 2019
101 02nd StSiemens Industry, Inc.fire alarm work for the "suite 850" remodel on floor 8; additions are 1 speaker/strobe as well as relocation of a speaker and speaker/strobe. maher na
Details
Permit
201910043539
Permit issued
Oct 4, 2019
Final sign-off
Oct 25, 2019

fire alarm work for the "suite 850" remodel on floor 8; additions are 1 speaker/strobe as well as relocation of a speaker and speaker/strobe. maher na

Open the permit page

$1,270
Oct 2, 2019Completed
final sign-off Oct 2019
101 02nd StC B 2 Builders Incorporatedmep only . ref 201909111311 arch.
Details
Permit
201910023350
Permit issued
Oct 2, 2019
Final sign-off
Oct 31, 2019

mep only . ref 201909111311 arch.

Open the permit page

$5,000
Sep 24, 2019Completed
final sign-off Oct 2019
101 02nd StAyoob & Peery Plumbing Co Inc8th fl - add 3, relocate 8 and plug 2 sprinklers in order to conform with the new wall and ceiling layout of the ti
Details
Permit
201909242550
Permit issued
Sep 30, 2019
Final sign-off
Oct 22, 2019

8th fl - add 3, relocate 8 and plug 2 sprinklers in order to conform with the new wall and ceiling layout of the ti

Open the permit page

$3,375
Sep 11, 2019Never finaled
issued Sep 2019, no final
101 02nd StC B 2 Builders Incorporatedthis project involves modification to include selective demolition & construction of non-load bearing partition, new door & frame, & new finishes
Details
Permit
201909111311
Permit issued
Sep 19, 2019

this project involves modification to include selective demolition & construction of non-load bearing partition, new door & frame, & new finishes

Open the permit page

$150,000
Jun 5, 2019Completed
final sign-off Jul 2019
101 02nd StSiemens Industry, Inc.fire alarm work for the restrooms remodel on floor 8 additions are 2 speaker/strobes. ref pa#201903226016. n/a for maher
Details
Permit
201906052505
Permit issued
Jun 5, 2019
Final sign-off
Jul 8, 2019

fire alarm work for the restrooms remodel on floor 8 additions are 2 speaker/strobes. ref pa#201903226016. n/a for maher

Open the permit page

$1,270
Jun 5, 2019Completed
final sign-off Jul 2019
101 02nd StSiemens Industry, Inc.fire alarm for the corridor restrooms remodel on floor 5, additions and replacements are 10 speaker/strobes ref 201806262913. n/a for maher.
Details
Permit
201906052503
Permit issued
Jun 5, 2019
Final sign-off
Jul 8, 2019

fire alarm for the corridor restrooms remodel on floor 5, additions and replacements are 10 speaker/strobes ref 201806262913. n/a for maher.

Open the permit page

$6,340
May 20, 2019Never finaled
issued May 2019, no final
101 02nd StSource Planning And Construction Inc8th fl: electrical for 201903226016.
Details
Permit
201905201072
Permit issued
May 21, 2019

8th fl: electrical for 201903226016.

Open the permit page

May 20, 2019Never finaled
issued May 2019, no final
101 02nd StSource Planning And Construction Inc5th fl: electrical for 201806262913.
Details
Permit
201905201075
Permit issued
May 21, 2019

5th fl: electrical for 201806262913.

Open the permit page

Apr 25, 2019Completed
final sign-off May 2019
101 02nd StAnderson, Rowe & Buckley, Inc.5th floor: existing fire sprinkler system- t.i. relocate 2 sprinklers.
Details
Permit
201904258908
Permit issued
Apr 26, 2019
Final sign-off
May 28, 2019

5th floor: existing fire sprinkler system- t.i. relocate 2 sprinklers.

Open the permit page

$1,000
Mar 22, 2019Completed
final sign-off Jul 2019
101 02nd StSource Planning And Construction Increstroom scope involves demolition and construction of toilet partitions, new plumbing, new accessorie and new finishes. salvage & reuse of (e) materials if practical
Details
Permit
201903226016
Permit issued
Mar 29, 2019
Final sign-off
Jul 25, 2019

restroom scope involves demolition and construction of toilet partitions, new plumbing, new accessorie and new finishes. salvage & reuse of (e) materials if practical

Open the permit page

$143,262
Jan 23, 2019Expired or cancelled
cancelled Jan 2026
101 02nd StTruebeck Constructionref pa# 201811206402; ad da check list, scope of work, add fisish plan notes note #14, accessible restrooms men's & women's elevations & mounting height elevations, construction plan drinking fountain
Details
Permit
201901230976

ref pa# 201811206402; ad da check list, scope of work, add fisish plan notes note #14, accessible restrooms men's & women's elevations & mounting height elevations, construction plan drinking fountain

Open the permit page

$155,000
Jan 22, 2019Never finaled
issued Jan 2019, no final
101 02nd StSiemens Industry, Inc.suite 800, 8th fl - fire alarm work for the "suite 800" remodel. additions are 2 speaker/strobes. as well as the relocation of 1 speaker/strobe. ref pa 2018-1120-6402
Details
Permit
201901220814
Permit issued
Jan 22, 2019

suite 800, 8th fl - fire alarm work for the "suite 800" remodel. additions are 2 speaker/strobes. as well as the relocation of 1 speaker/strobe. ref pa 2018-1120-6402

Open the permit page

$1,270
Jan 18, 2019Completed
final sign-off Feb 2019
101 02nd StGolden Gate Fire Protection Incref pa# 201811206402; fire sprinkler; relocate 9 pendent sprinklers on the 8th fl. suite 800
Details
Permit
201901180685
Permit issued
Jan 18, 2019
Final sign-off
Feb 4, 2019

ref pa# 201811206402; fire sprinkler; relocate 9 pendent sprinklers on the 8th fl. suite 800

Open the permit page

$4,725
Jan 4, 2019Completed
final sign-off Dec 2019
101 02nd StAcco Engineered Systems Inc. Dba Acco En#800: relocate linear plenums & rebalance. ref 201811206402
Details
Permit
201901049623
Permit issued
Jan 4, 2019
Final sign-off
Dec 26, 2019

#800: relocate linear plenums & rebalance. ref 201811206402

Open the permit page

$10,000
Nov 20, 2018Completed
final sign-off Dec 2019
101 02nd StTruebeck Constructionsuite 800. modification of (e) t.i incl selective demo, construction on non-load bearing partitions, (e) mods to ceiling grid & tile, light fixture relocation w/ (n) re-switching, (n) office doors and frames, (n) finishes
Details
Permit
201811206402
Permit issued
Jan 7, 2019
Final sign-off
Dec 26, 2019

suite 800. modification of (e) t.i incl selective demo, construction on non-load bearing partitions, (e) mods to ceiling grid & tile, light fixture relocation w/ (n) re-switching, (n) office doors and frames, (n) finishes

Open the permit page

$155,000
Nov 1, 2018Never finaled
issued Nov 2018, no final
101 02nd StSiemens Industry, Inc.fire alarm work for the "elevator lobby/corridor" areas on floor 3; additions and replacements of 9 speakers/strobes. ref pa 2018-0911-9688
Details
Permit
201811014688
Permit issued
Nov 16, 2018

fire alarm work for the "elevator lobby/corridor" areas on floor 3; additions and replacements of 9 speakers/strobes. ref pa 2018-0911-9688

Open the permit page

$5,700
Oct 16, 2018Never finaled
issued Oct 2018, no final
101 02nd StSource Planning And Construction Incelectrical work for ti. new lighting and controls. ref pa 2018-0911-9688
Details
Permit
201810163356
Permit issued
Oct 18, 2018

electrical work for ti. new lighting and controls. ref pa 2018-0911-9688

Open the permit page

Oct 4, 2018Completed
final sign-off Jul 2019
101 02nd StSource Planning And Construction Inc12th fl - restroom scope involves demolition and construction of toilet partitions, new plumbing, new accessories and new finishes, salvage & reuise existing selectred materials if practical
Details
Permit
201810042272
Permit issued
Oct 5, 2018
Final sign-off
Jul 15, 2019

12th fl - restroom scope involves demolition and construction of toilet partitions, new plumbing, new accessories and new finishes, salvage & reuise existing selectred materials if practical

Open the permit page

$187,609
Sep 11, 2018Completed
final sign-off Jul 2019
101 02nd StSource Planning And Construction Incmodification of e multi tenant elevator lobby and corridor improvements to include selective construction of non load bearing partitions, (e) modification to ceiling new light fixtures and relocate new switching and new finishes. fire and mep under separate permit(s).
Details
Permit
201809119688
Permit issued
Sep 14, 2018
Final sign-off
Jul 15, 2019

modification of e multi tenant elevator lobby and corridor improvements to include selective construction of non load bearing partitions, (e) modification to ceiling new light fixtures and relocate new switching and new finishes. fire and mep under separate permit(s).

Open the permit page

$177,640
Jul 18, 2018Never finaled
issued Jul 2018, no final
101 02nd StSource Planning And Construction Incsuite 700: electrical work for ti to consist new lighting, power & signal, wiring, lighting & controls. ref pa #201805048233. maher na
Details
Permit
201807184809
Permit issued
Jul 18, 2018

suite 700: electrical work for ti to consist new lighting, power & signal, wiring, lighting & controls. ref pa #201805048233. maher na

Open the permit page

$20,000
Jul 17, 2018Never finaled
issued Jul 2018, no final
101 02nd StSiemens Industry, Inc.7th fl - fire alarm work for the "hashcrop" remodel; additions are 2 speakers, 1 speaker/strobes, and the relocation of 2 speaker/strobes. ref pa 2018-0504-8233. n/a for maher.
Details
Permit
201807174693
Permit issued
Jul 17, 2018

7th fl - fire alarm work for the "hashcrop" remodel; additions are 2 speakers, 1 speaker/strobes, and the relocation of 2 speaker/strobes. ref pa 2018-0504-8233. n/a for maher.

Open the permit page

$2,500
Jul 11, 2018Completed
final sign-off Jul 2018
101 02nd St7th flr. fire sprinklers, relocate 2, add 1 and delete 5
Details
Permit
201807114316
Permit issued
Jul 16, 2018
Final sign-off
Jul 29, 2018

7th flr. fire sprinklers, relocate 2, add 1 and delete 5

Open the permit page

$1,500
Jun 26, 2018Completed
final sign-off Jul 2019
101 02nd StSource Planning And Construction Inc5th flr - ti for (e) multi tenant elevator lobby/corridor. selective const of non load bearing partitions, (e) ceiling, new light fixture and relocation and new switching, new finishes. restrm - demo/construction of toilet partitions/plm/accessories & finishes. fire/mep under sep permits
Details
Permit
201806262913
Permit issued
Jul 11, 2018
Final sign-off
Jul 25, 2019

5th flr - ti for (e) multi tenant elevator lobby/corridor. selective const of non load bearing partitions, (e) ceiling, new light fixture and relocation and new switching, new finishes. restrm - demo/construction of toilet partitions/plm/accessories & finishes. fire/mep under sep permits

Open the permit page

$398,000
May 4, 2018Never finaled
issued May 2018, no final
101 02nd StSource Planning And Construction Inc7/f: modification of an (e) ti - selective demo and contruction of non-load bearing partitions, new office doors nad frames, salvage and reuse of (e) selected materials if practical, millwork and new finishes
Details
Permit
201805048233
Permit issued
May 14, 2018

7/f: modification of an (e) ti - selective demo and contruction of non-load bearing partitions, new office doors nad frames, salvage and reuse of (e) selected materials if practical, millwork and new finishes

Open the permit page

$128,442
Feb 22, 2018Completed
final sign-off Jul 2018
101 02nd StGolden Gate Fire Protection Incfire sprinkler only, relocate 16 pendents, relocate 25 uprights, sutie 1200, 12th fl. n/a for maher.
Details
Permit
201802221956
Permit issued
Feb 23, 2018
Final sign-off
Jul 11, 2018

fire sprinkler only, relocate 16 pendents, relocate 25 uprights, sutie 1200, 12th fl. n/a for maher.

Open the permit page

$8,650
Feb 21, 2018Completed
final sign-off Jul 2018
101 02nd StGolden Gate Fire Protection Inc12th fl fire sprinkler only: relocate 6 pendents. relocate 12 uprights. for suite #1275. ref # 201712186753. maher na
Details
Permit
201802211807
Permit issued
Feb 22, 2018
Final sign-off
Jul 13, 2018

12th fl fire sprinkler only: relocate 6 pendents. relocate 12 uprights. for suite #1275. ref # 201712186753. maher na

Open the permit page

$4,500
Feb 20, 2018Completed
final sign-off Mar 2018
101 02nd StSiemens Industry, Inc.12th flr: fire alarm work - add 18 speaker/strobes and 5 strobes. maher na. ref pa# 201712186753
Details
Permit
201802201622
Permit issued
Feb 20, 2018
Final sign-off
Mar 29, 2018

12th flr: fire alarm work - add 18 speaker/strobes and 5 strobes. maher na. ref pa# 201712186753

Open the permit page

$13,800
Feb 20, 2018Completed
final sign-off Jun 2018
101 02nd StSource Planning And Construction Inc12th fl suites 1200/1275 mech and electrical permit 201712186753
Details
Permit
201802201639
Permit issued
Feb 21, 2018
Final sign-off
Jun 13, 2018

12th fl suites 1200/1275 mech and electrical permit 201712186753

Open the permit page

$300,000
Dec 18, 2017Completed
final sign-off Jun 2018
101 02nd StSource Planning And Construction Incste. #1200 & #1275: demo and construction of non load bearing walls, new ceiling grid, light fixtures, new millwork, finishes
Details
Permit
201712186753
Permit issued
Jan 10, 2018
Final sign-off
Jun 13, 2018

ste. #1200 & #1275: demo and construction of non load bearing walls, new ceiling grid, light fixtures, new millwork, finishes

Open the permit page

$279,042
Nov 2, 2017Completed
final sign-off Dec 2017
101 02nd St12/f- fire sprinklers ti 5 relcated pendents, 2 added, ref 201709138056 maher not req
Details
Permit
201711022992
Permit issued
Nov 2, 2017
Final sign-off
Dec 4, 2017

12/f- fire sprinklers ti 5 relcated pendents, 2 added, ref 201709138056 maher not req

Open the permit page

$3,539
Oct 17, 2017Completed
final sign-off Apr 2018
101 02nd StSiemens Industry, Inc.f/a work for "suite 12mp", remodel on the 12th fl; additions are 6 duct detectors & 2 speaker/strobes. ref pa #201709138056. maher na
Details
Permit
201710171394
Permit issued
Oct 18, 2017
Final sign-off
Apr 20, 2018

f/a work for "suite 12mp", remodel on the 12th fl; additions are 6 duct detectors & 2 speaker/strobes. ref pa #201709138056. maher na

Open the permit page

$4,680
Oct 12, 2017Expired or cancelled
cancelled Jan 2026
575 Mission Stdemo & construction of accessible restrooms for full bldg, mech, plumbing and electrical & accessibility compliance. modification of (e) tenant improvement to include selective demo & construction of non-load bearing partitions, new doors, frames, (n) plumbing fixtures, new finishes and salvage (e)
Details
Permit
201710121155

demo & construction of accessible restrooms for full bldg, mech, plumbing and electrical & accessibility compliance. modification of (e) tenant improvement to include selective demo & construction of non-load bearing partitions, new doors, frames, (n) plumbing fixtures, new finishes and salvage (e)

Open the permit page

$191,000
Sep 14, 2017Completed
final sign-off Jun 2018
101 02nd StTruebeck Constructiondemo curtain wall system and install nana wall system. new guardrail and wooden deck pavers on new occupiable roof deck and multipurpose room, (n) elevator lobby s-doors configuration and (n) panic hardware on exit stairs. mp room ref pa 201709138056 ** maher: n/a **
Details
Permit
201709148263
Permit issued
Feb 2, 2018
Final sign-off
Jun 8, 2018

demo curtain wall system and install nana wall system. new guardrail and wooden deck pavers on new occupiable roof deck and multipurpose room, (n) elevator lobby s-doors configuration and (n) panic hardware on exit stairs. mp room ref pa 201709138056 ** maher: n/a **

Open the permit page

$120,450
Sep 13, 2017Completed
final sign-off Aug 2018
101 02nd StTruebeck Construction12th fl - demo partitions, new stairs, ramp, kitchenette tieing into existing meps for renovation. all new interior finishes. roof deck, curtain wall, fire alarm, and sprinklers on separate submittals.
Details
Permit
201709138056
Permit issued
Sep 20, 2017
Final sign-off
Aug 7, 2018

12th fl - demo partitions, new stairs, ramp, kitchenette tieing into existing meps for renovation. all new interior finishes. roof deck, curtain wall, fire alarm, and sprinklers on separate submittals.

Open the permit page

$425,050
Sep 1, 2017Completed
final sign-off Sep 2017
101 02nd StGolden Gate Fire Protection Inc5/f suite 570: fire sprinkler only: relocate 12 pendents. n/a maher
Details
Permit
201709016717
Permit issued
Sep 5, 2017
Final sign-off
Sep 14, 2017

5/f suite 570: fire sprinkler only: relocate 12 pendents. n/a maher

Open the permit page

$3,000
Jun 20, 2017Completed
final sign-off Oct 2017
101 02nd StRossi Builders Inc.14/f- revision to 201704254811: remove signage on (e) toilet rooms and replace with signs indicating location of the accessible all gender toilet rooms.
Details
Permit
201706209833
Permit issued
Jun 23, 2017
Final sign-off
Oct 12, 2017

14/f- revision to 201704254811: remove signage on (e) toilet rooms and replace with signs indicating location of the accessible all gender toilet rooms.

Open the permit page

Jun 6, 2017Completed
final sign-off Jul 2017
101 02nd StSiemens Industry, Inc.fire alarm work for the "service now" remodel on floor 14; additions are 5 smoke detectors, 14 duct detectors, 1 strobe power supply module, 6 speakers, 27 speaker/strobs and 8 strobes. ref pa 2017-0425-4811. n/a for maher.
Details
Permit
201706068499
Permit issued
Jun 6, 2017
Final sign-off
Jul 27, 2017

fire alarm work for the "service now" remodel on floor 14; additions are 5 smoke detectors, 14 duct detectors, 1 strobe power supply module, 6 speakers, 27 speaker/strobs and 8 strobes. ref pa 2017-0425-4811. n/a for maher.

Open the permit page

$34,540
Jun 2, 2017Completed
final sign-off Jul 2017
101 02nd StGolden Gate Fire Protection Inc14th floor fire sprinkler only. relocate 19 pendents; add 2 uprights; relocate 39 pendents for service now. ref #201704133933. n/a maher ordinance
Details
Permit
201706028243
Permit issued
Jun 2, 2017
Final sign-off
Jul 10, 2017

14th floor fire sprinkler only. relocate 19 pendents; add 2 uprights; relocate 39 pendents for service now. ref #201704133933. n/a maher ordinance

Open the permit page

$15,000
Apr 25, 2017Completed
final sign-off Sep 2017
101 02nd StRossi Builders Inc.construction of new tentant layout, construction of partitoins, doors, ceilings, millwork, and plumbing fixtures. demo under 201704133933 mep included
Details
Permit
201704254811
Permit issued
Apr 28, 2017
Final sign-off
Sep 20, 2017

construction of new tentant layout, construction of partitoins, doors, ceilings, millwork, and plumbing fixtures. demo under 201704133933 mep included

Open the permit page

$1,013,115
Apr 17, 2017Never finaled
issued Apr 2017, no final
101 02nd StGolden Gate Fire Protection Inc14th fl: fire sprinkler; relocate 111 upright sprinklers for demo permit. n/a for maher
Details
Permit
201704174076
Permit issued
Apr 17, 2017

14th fl: fire sprinkler; relocate 111 upright sprinklers for demo permit. n/a for maher

Open the permit page

$58,275
Apr 13, 2017Completed
final sign-off Oct 2017
101 02nd StRossi Builders Inc.14th floor - scope id selective demo of existing non-structural partitions, doors, ceiling, millwork, & fixtures. ref sprinkler pa#201704174076. n/a for maher.
Details
Permit
201704133933
Permit issued
Apr 17, 2017
Final sign-off
Oct 12, 2017

14th floor - scope id selective demo of existing non-structural partitions, doors, ceiling, millwork, & fixtures. ref sprinkler pa#201704174076. n/a for maher.

Open the permit page

$45,000
Apr 4, 2017Completed
final sign-off Jun 2017
101 02nd StSiemens Industry, Inc.fire alarm work for the "suite 225" remodel on 12th flr: fire alarm - add 2 smoke detectors and 4 speaker/strobes maher na. ref pa # 201703080931
Details
Permit
201704043066
Permit issued
Apr 4, 2017
Final sign-off
Jun 5, 2017

fire alarm work for the "suite 225" remodel on 12th flr: fire alarm - add 2 smoke detectors and 4 speaker/strobes maher na. ref pa # 201703080931

Open the permit page

$3,260
Mar 21, 2017Completed
final sign-off Apr 2017
101 02nd St12th floor suite 1225: fire sprinkler permit - relocate 13, add 4 & delete 2 pendent sprinklers. relocate 7 upright sprinklers. ref t.i. #201703080931. n/a maher ordinance
Details
Permit
201703211925
Permit issued
Mar 21, 2017
Final sign-off
Apr 13, 2017

12th floor suite 1225: fire sprinkler permit - relocate 13, add 4 & delete 2 pendent sprinklers. relocate 7 upright sprinklers. ref t.i. #201703080931. n/a maher ordinance

Open the permit page

$6,500
Mar 10, 2017Completed
final sign-off Nov 2017
101 02nd StSource Planning And Construction Inc12/f- electrical for 201703080931. n/a ordinance #155-13
Details
Permit
201703101195
Permit issued
Mar 16, 2017
Final sign-off
Nov 7, 2017

12/f- electrical for 201703080931. n/a ordinance #155-13

Open the permit page

$55,000
Mar 8, 2017Completed
final sign-off Nov 2017
101 02nd StSource Planning And Construction Inc12th flr: selective demo and construction modification of (e) suite & multi-tenant corridor with new light fixtures, finishes, millwork, electrical doors & hardware maher na. mep, life safety deferred.
Details
Permit
201703080931
Permit issued
Mar 16, 2017
Final sign-off
Nov 7, 2017

12th flr: selective demo and construction modification of (e) suite & multi-tenant corridor with new light fixtures, finishes, millwork, electrical doors & hardware maher na. mep, life safety deferred.

Open the permit page

$189,703
Jan 20, 2017Completed
final sign-off Mar 2017
101 02nd StGolden Gate Fire Protection Inc3rd floor: fire sprinkler only: relocate 9 uprights heads, remove 1 pendent for suite #375. n/a for maher. ref app#201612064283
Details
Permit
201701207533
Permit issued
Jan 20, 2017
Final sign-off
Mar 14, 2017

3rd floor: fire sprinkler only: relocate 9 uprights heads, remove 1 pendent for suite #375. n/a for maher. ref app#201612064283

Open the permit page

$2,250
Dec 6, 2016Expired or cancelled
cancelled Jan 2026
101 02nd Stsuite 375: modification of extg tenant suite to include selective demolition & construction of non-load bearing partitions, new lighting, controls, new millwork and new finishes. all work shall comply with federal state and local codes including sf bldg code, vav title 24 and federal ada regulations
Details
Permit
201612064283

suite 375: modification of extg tenant suite to include selective demolition & construction of non-load bearing partitions, new lighting, controls, new millwork and new finishes. all work shall comply with federal state and local codes including sf bldg code, vav title 24 and federal ada regulations

Open the permit page

$90,635
Jun 14, 2016Completed
final sign-off Nov 2016
101 02nd St11th floor: evac maps 4 maher na
Details
Permit
201606149885
Permit issued
Jun 14, 2016
Final sign-off
Nov 3, 2016

11th floor: evac maps 4 maher na

Open the permit page

$1,800
May 17, 2016Completed
final sign-off Nov 2016
101 02nd StSkyline Construction11th floor: structural work for new nana folding door for ref pa 2016 0323 2806. maher na
Details
Permit
201605177587
Permit issued
May 17, 2016
Final sign-off
Nov 7, 2016

11th floor: structural work for new nana folding door for ref pa 2016 0323 2806. maher na

Open the permit page

$3,000
May 10, 2016Completed
final sign-off Jun 2016
101 02nd StSiemens Industry, Inc.0n floor 11 -fire alarm work for the "colliers" ti remode; additions are 5 smoke detectors, 1 strobe power supply, 8 speakers, 23 speaker/strobes, and 7 strobes. ref pa 2016-0323-2806. maher na
Details
Permit
201605106992
Permit issued
May 10, 2016
Final sign-off
Jun 21, 2016

0n floor 11 -fire alarm work for the "colliers" ti remode; additions are 5 smoke detectors, 1 strobe power supply, 8 speakers, 23 speaker/strobes, and 7 strobes. ref pa 2016-0323-2806. maher na

Open the permit page

$24,460
Apr 18, 2016Completed
final sign-off May 2016
101 02nd StGolden Gate Fire Protection Incfire sprinkler only- relocate 39 pendents, add 14 pendents, relocate 6 uprights, plug 4 uprights, plug 4 for colliers 11/f. total 63 heads. t.i. pa#201603232806. n/a ordinance #155-13
Details
Permit
201604184972
Permit issued
Apr 18, 2016
Final sign-off
May 16, 2016

fire sprinkler only- relocate 39 pendents, add 14 pendents, relocate 6 uprights, plug 4 uprights, plug 4 for colliers 11/f. total 63 heads. t.i. pa#201603232806. n/a ordinance #155-13

Open the permit page

$31,500
Apr 13, 2016Completed
final sign-off Apr 2016
101 02nd StSiemens Industry, Inc.fire alarm for the "suite 350" ti remodel on floor 3; additions are 1 smoke detector, 2 speakers, 12 speaker/strobes, and 2 strobes. ref pa 2016-0303-1061, maher na
Details
Permit
201604134622
Permit issued
Apr 13, 2016
Final sign-off
Apr 28, 2016

fire alarm for the "suite 350" ti remodel on floor 3; additions are 1 smoke detector, 2 speakers, 12 speaker/strobes, and 2 strobes. ref pa 2016-0303-1061, maher na

Open the permit page

$8,800
Apr 11, 2016Never finaled
issued Apr 2016, no final
101 02nd StSkyline Constructionsuite 350 - mechanical & electrical work for tenant improvement. ref #201603031061. n/a maher ordinance
Details
Permit
201604114431
Permit issued
Apr 14, 2016

suite 350 - mechanical & electrical work for tenant improvement. ref #201603031061. n/a maher ordinance

Open the permit page

$55,000
Apr 1, 2016Never finaled
issued Apr 2016, no final
101 02nd StSiemens Industry, Inc.15th floor: fire alarm for the "nokia" ref pa 2016-0303-1145: add 5 smoke detectors, 4 duct detectors, 1 strobe power supply, 8 speakers, 27 speaker/strobes, 7 strobes, 4 door holders. maher na
Details
Permit
201604013675
Permit issued
Apr 1, 2016

15th floor: fire alarm for the "nokia" ref pa 2016-0303-1145: add 5 smoke detectors, 4 duct detectors, 1 strobe power supply, 8 speakers, 27 speaker/strobes, 7 strobes, 4 door holders. maher na

Open the permit page

$31,000
Mar 23, 2016Completed
final sign-off Nov 2016
101 02nd StSkyline Construction11th floor t.i. & renovations on the vacant, non-occupied which include demo non-structural partitions, millwork, doors, ceiling, lighting, elec, finishes & construct non-structural partitions, doors glazing, ceiling,light fixtures,millwork & finishes. mep under same permit. l/s under separate bpa
Details
Permit
201603232806
Permit issued
Apr 6, 2016
Final sign-off
Nov 7, 2016

11th floor t.i. & renovations on the vacant, non-occupied which include demo non-structural partitions, millwork, doors, ceiling, lighting, elec, finishes & construct non-structural partitions, doors glazing, ceiling,light fixtures,millwork & finishes. mep under same permit. l/s under separate bpa

Open the permit page

$1,727,040
Mar 21, 2016Completed
final sign-off Apr 2016
101 02nd StGolden Gate Fire Protection Inc#350- fire sprinkler only, relocate 3 pendents, add 1 pendent (4 total) for informa. t.i. pa#201603031061. n/a ordinance #155-13
Details
Permit
201603212534
Permit issued
Mar 21, 2016
Final sign-off
Apr 4, 2016

#350- fire sprinkler only, relocate 3 pendents, add 1 pendent (4 total) for informa. t.i. pa#201603031061. n/a ordinance #155-13

Open the permit page

$2,000
Mar 9, 2016Completed
final sign-off May 2016
101 02nd StPrincipal Builders Inc.15th flr: mep to install new equipment and fixtures. ref pa 2015 0303 1145
Details
Permit
201603091613
Permit issued
Apr 1, 2016
Final sign-off
May 24, 2016

15th flr: mep to install new equipment and fixtures. ref pa 2015 0303 1145

Open the permit page

$473,000
Mar 8, 2016Completed
final sign-off Nov 2016
101 02nd StSkyline Construction11th floor:scope of this permit includes the following :per ab-17 selective demolition on the vancant, unoccupied of an extg non-structural partitions, doors/frames, ceiling grid/tile, lighting, power & finishes. there is no new construction under this demolition permit application. n/a 155-13
Details
Permit
201603081417
Permit issued
Mar 15, 2016
Final sign-off
Nov 7, 2016

11th floor:scope of this permit includes the following :per ab-17 selective demolition on the vancant, unoccupied of an extg non-structural partitions, doors/frames, ceiling grid/tile, lighting, power & finishes. there is no new construction under this demolition permit application. n/a 155-13

Open the permit page

$72,000
Mar 3, 2016Never finaled
issued Mar 2016, no final
101 02nd StSkyline Constructionsuite 350 - modification of (e) bldg improvements to include selective demo & construction of non-load bearing partitions, new door & frame & sidelight, new millwork & new finishes. l/s under separate permit.
Details
Permit
201603031061
Permit issued
Mar 8, 2016

suite 350 - modification of (e) bldg improvements to include selective demo & construction of non-load bearing partitions, new door & frame & sidelight, new millwork & new finishes. l/s under separate permit.

Open the permit page

$518,609
Mar 3, 2016Completed
final sign-off Apr 2016
101 02nd StSkyline Constructionsuite 2250 - modification of (e) bldg improvements to include selective demo & construction of non-load bearing partitions, new door & frame & sidelight, new millwork & new finishes. mep, l/s under separate. n/a maher ordinance
Details
Permit
201603031067
Permit issued
Mar 8, 2016
Final sign-off
Apr 18, 2016

suite 2250 - modification of (e) bldg improvements to include selective demo & construction of non-load bearing partitions, new door & frame & sidelight, new millwork & new finishes. mep, l/s under separate. n/a maher ordinance

Open the permit page

$79,019
Mar 3, 2016Completed
final sign-off May 2016
101 02nd StPrincipal Builders Inc.15/f- t. i. to construct new partitions, doors, finishes, ceilings & millwork. mep, fire protection and life safety to follow under seperate permit. n/a ordinance #155-13
Details
Permit
201603031145
Permit issued
Mar 7, 2016
Final sign-off
May 24, 2016

15/f- t. i. to construct new partitions, doors, finishes, ceilings & millwork. mep, fire protection and life safety to follow under seperate permit. n/a ordinance #155-13

Open the permit page

$889,119
Feb 29, 2016Completed
final sign-off May 2016
101 02nd StAnderson, Rowe & Buckley, Inc.15th floor: extg fire sprinkler system. t.i. 17 relocated sprinklers and 105 add sprinklers. ref app#201512094563 n/a for maher.
Details
Permit
201602290788
Permit issued
Mar 2, 2016
Final sign-off
May 16, 2016

15th floor: extg fire sprinkler system. t.i. 17 relocated sprinklers and 105 add sprinklers. ref app#201512094563 n/a for maher.

Open the permit page

$61,000
Dec 9, 2015Never finaled
issued Dec 2015, no final
101 02nd StPrincipal Builders Inc.15th floor:demolition of partitions and doors, millwork, cieling finishes. all ada will be provided on future t.i. per ab-017. elevator lobby doors and cure to remain.
Details
Permit
201512094563
Permit issued
Dec 9, 2015

15th floor:demolition of partitions and doors, millwork, cieling finishes. all ada will be provided on future t.i. per ab-017. elevator lobby doors and cure to remain.

Open the permit page

$85,000
Sep 25, 2015Completed
final sign-off Oct 2015
101 02nd StAnderson, Rowe & Buckley, Inc.8th flr: fire sprinklers - relocate 2 heads, add (1) branch line retraint. ref pa 2015 0723 2313 maher na
Details
Permit
201509258042
Permit issued
Sep 25, 2015
Final sign-off
Oct 30, 2015

8th flr: fire sprinklers - relocate 2 heads, add (1) branch line retraint. ref pa 2015 0723 2313 maher na

Open the permit page

$1,036
Sep 8, 2015Completed
final sign-off Oct 2015
101 02nd StSiemens Industry, Inc.8th floor: fire alarm for the "hff" t.i. remodel: additions are 2 speaker/strobes. ref app#2015-0827-5409.
Details
Permit
201509086413
Permit issued
Sep 8, 2015
Final sign-off
Oct 30, 2015

8th floor: fire alarm for the "hff" t.i. remodel: additions are 2 speaker/strobes. ref app#2015-0827-5409.

Open the permit page

$1,000
Aug 27, 2015Completed
final sign-off Nov 2015
101 02nd StCommercial Interior Builders Inc8th floor: remodel of lobby/breakroom, new finishes & copy room. mep/fire/life safety under sep permit. maher na
Details
Permit
201508275409
Permit issued
Sep 1, 2015
Final sign-off
Nov 6, 2015

8th floor: remodel of lobby/breakroom, new finishes & copy room. mep/fire/life safety under sep permit. maher na

Open the permit page

$70,000
Jul 23, 2015Completed
final sign-off May 2016
101 02nd StSource Planning And Construction Incmodification of e multi tenant elevator lobby and corridor improvements to include e ceiling modification, light fixture relocation, reswitching and finishes
Details
Permit
201507232313
Permit issued
Aug 20, 2015
Final sign-off
May 31, 2016

modification of e multi tenant elevator lobby and corridor improvements to include e ceiling modification, light fixture relocation, reswitching and finishes

Open the permit page

$100,000

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Source Planning And Construction Inc (49), Golden Gate Fire Protection Inc (24), Siemens Industry, Inc. (23), Skyline Construction (23), Sabah International Incorporated (21), Pioneer Fire Inc. (8), Bilcor Inc (5), Ayoob & Peery Plumbing Co Inc (4), Clune Construction Company L P (4), Truebeck Construction (4), Anderson, Rowe & Buckley, Inc. (3), Bcci Construction Company (3), Principal Builders Inc. (3), Rossi Builders Inc. (3), C B 2 Builders Incorporated (2), Matrix Hg Inc (2), Acco Engineered Systems Inc. Dba Acco En, C C I Commercial Construction & Improv, Commercial Interior Builders Inc, Maguire Inc Dba Lahue And Associates, Prima Acquire Inc Dba Lahue And Associat
Architects
Ashley Miller (18), Daniel Pamperin (4), Donnie Lam (4), Amir Kakavand (3), George Soskin (3), Michael Castro (3), Walt Thomas (3), Brandon Stevens (2), Craig James Almeleh (2), Sharon Russo (2), Douglas Zucker, Jesus Cabellon Jr., William Hadinger
Engineers
Aaron J. Strauch (9), Bradley Hollub (5), Stephen Shaffer (5), Alexander Pacheco (2), Pablo Orozco (2), Sherry Chaumpluke (2), Steven Lew (2), Alexander Joseph Pacheco, Ashley Miller, Carl Milsum, Christopher Jordan Malabed, Craig W. Ristow, Dean Macy, Dennis Cheung, Edward Rivera, Jesus Cabellon Jr., Xuong Quach
Authorized agents
Edith Posadas (2), Kendra Curtis (2), Edgar Garcia
Designers
Golden Gate Fire Protection (2), R L H Fire Protection Inc (2), Aldi Gunawan Chris Hamilton, Sabah International Inc.

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.