- Feb 2014 to Aug 2026
190 permits since 2000 (contractor on 190 permits, authorized agent-others on 5 permits): 123 completed, 4 in progress, 53 never finaled, 10 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 190.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 18, 2026 | In progress issued Sep 2026 | 2675 Geary Bl | Clune Construction Company L P | core and shell work to suite c-2. work includes replacement of hvac equipment, providing accessible restroom and new water connection.Details
core and shell work to suite c-2. work includes replacement of hvac equipment, providing accessible restroom and new water connection. | $46,000 |
| May 29, 2026 | Completed final sign-off Aug 2026 | 2675 Geary Bl | Clune Construction Company L P | 2/f-soft interior demo, no changes to existing life safety system or equipment. space to remain vancant until future ti submitted under separate permit.Details
2/f-soft interior demo, no changes to existing life safety system or equipment. space to remain vancant until future ti submitted under separate permit. | $65,000 |
| Apr 6, 2026 | Completed final sign-off Jun 2026 | 4 Embarcadero Center | Clune Construction Company L P | level 25. revision#: 202512302947. upgrade elevator lobby hardware. delete ada counter in bathroom. relocate power location for printer. minor ada bathroom updates.Details
level 25. revision#: 202512302947. upgrade elevator lobby hardware. delete ada counter in bathroom. relocate power location for printer. minor ada bathroom updates. | |
| Dec 30, 2025 | Completed final sign-off Jun 2026 | 4 Embarcadero Center | Clune Construction Company L P | 25/fl- suite 2500- non structural parittions, ceilings, finishes, associated mechanical and electrical workDetails
25/fl- suite 2500- non structural parittions, ceilings, finishes, associated mechanical and electrical work | $800,000 |
| Dec 18, 2025 | In progress issued Jan 2026 | 1 Market St | Clune Construction Company L P | 13th fl - hvac ti project unit the (e) base bldg hvac system; modification to the air distribution system in the tenant space to suit arc renov including install of vav boxes and fan powered terminal for tenant needs. no new fire smoke dampers. ref pa 202512111539Details
13th fl - hvac ti project unit the (e) base bldg hvac system; modification to the air distribution system in the tenant space to suit arc renov including install of vav boxes and fan powered terminal for tenant needs. no new fire smoke dampers. ref pa 202512111539 | $300,000 |
| Dec 11, 2025 | In progress issued Jan 2026 | 1 Market St | Clune Construction Company L P | 13th/f t.i. minor demo of non structural elements, construction of new 23 offices, 13 meeting rooms, break & reception area. new finishes, ceilings, lights. ref 202510238018Details
13th/f t.i. minor demo of non structural elements, construction of new 23 offices, 13 meeting rooms, break & reception area. new finishes, ceilings, lights. ref 202510238018 | $1,880,900 |
| Nov 5, 2025 | Completed final sign-off Feb 2026 | 445 Powell St | Clune Construction Company L P | ab-017: decommissioning of bank of america. removal of bank furniture, equipment, vault and other bank elements related to bofa; removal of exterior atm; deposit box. scope of work will not public right of wayDetails
ab-017: decommissioning of bank of america. removal of bank furniture, equipment, vault and other bank elements related to bofa; removal of exterior atm; deposit box. scope of work will not public right of way | $110,000 |
| Oct 22, 2025 | Completed final sign-off Dec 2025 | 345 California St | Clune Construction Company L P | 17th fl- deferred mep for pa # 2025-0626-9602Details
17th fl- deferred mep for pa # 2025-0626-9602 | |
| Sep 12, 2025 | Completed final sign-off Dec 2025 | 350 Bush St | Clune Construction Company L P | 17th fl - general suite upgrades consists of (n) doors, walls, finishes; minor demo for a new wall, a piece of millwork, and relocation of light fixtures. additionally, the project will require minor mechanical and electrical work for the av/it tenant needsDetails
17th fl - general suite upgrades consists of (n) doors, walls, finishes; minor demo for a new wall, a piece of millwork, and relocation of light fixtures. additionally, the project will require minor mechanical and electrical work for the av/it tenant needs | $180,000 |
| Jun 26, 2025 | Completed final sign-off Jan 2026 | 345 California St | Clune Construction Company L P | 17th fl- restroom upgrade-new partitions, millwork, finishes, add 2 floor drains, upgrade lighting fixtures. plumbing, electrical & fire life safety are deferred submittalsDetails
17th fl- restroom upgrade-new partitions, millwork, finishes, add 2 floor drains, upgrade lighting fixtures. plumbing, electrical & fire life safety are deferred submittals | $210,000 |
| Jun 23, 2025 | Completed final sign-off Sep 2025 | 1 Post St | Clune Construction Company L P | suite 103 and 105-ref 202505227060 ti- alteration of low side air distrubution for the basement floor cafe. (n) power and signal devices throughout the space (n) title 24 compliant lighting and controls. no change to kitchen equipment.Details
suite 103 and 105-ref 202505227060 ti- alteration of low side air distrubution for the basement floor cafe. (n) power and signal devices throughout the space (n) title 24 compliant lighting and controls. no change to kitchen equipment. | $20,000 |
| May 28, 2025 | Completed final sign-off Jan 2026 | 1 California St | Clune Construction Company L P | deferred submittal for permit 2024-0611-4142. revision to approved permit 2025-0206-9815 to show head detail changes and curb shown around the building.Details
deferred submittal for permit 2024-0611-4142. revision to approved permit 2025-0206-9815 to show head detail changes and curb shown around the building. | |
| May 27, 2025 | Completed final sign-off Aug 2025 | 1 Post St | Clune Construction Company L P | suite 3000: new power and signal devices thoughout the space, new 2022 title 24 compliant lighting and controls. minor rework of tenant suite including 1 new vav box and duct distribution as required for new room layout. ref pa #202505136386Details
suite 3000: new power and signal devices thoughout the space, new 2022 title 24 compliant lighting and controls. minor rework of tenant suite including 1 new vav box and duct distribution as required for new room layout. ref pa #202505136386 | $180,000 |
| May 22, 2025 | Completed final sign-off Sep 2025 | 1 Post St | Clune Construction Company L P | (ste 105- basement level) this project involves minor renovations inlcuding combining 2 existing suites. light demolition and new light fixtures, and new finishes in suite 105. deferred electrical.Details
(ste 105- basement level) this project involves minor renovations inlcuding combining 2 existing suites. light demolition and new light fixtures, and new finishes in suite 105. deferred electrical. | $150,000 |
| May 13, 2025 | Completed final sign-off Aug 2025 | 1 Post St | Peacock Construction, Clune Construction Company L P | 30th fl suite 3000: renovation including demolition and construction of new partitions. new door frames, ceiling grid, relocated light fixtures and power/data. mechanical, electrical under separate permitDetails
30th fl suite 3000: renovation including demolition and construction of new partitions. new door frames, ceiling grid, relocated light fixtures and power/data. mechanical, electrical under separate permit | $180,000 |
| Feb 27, 2025 | In progress issued May 2025 | 1 California St | Clune Construction Company L P | deferred submittal of permit # 202406114142: replacement of the exterior curtainwall system.Details
deferred submittal of permit # 202406114142: replacement of the exterior curtainwall system. | $750,000 |
| Jan 31, 2025 | Completed final sign-off Jul 2025 | 555 California St | Clune Construction Company L P | 33rd fl - this project consists of demolition of non-structural partitions, no-plumbing renovation of the break area, millwork, lighting and finishes within a single suite. includes construction of tv niches, millwork, finishes, 2 light fixtures. there will be no change in occupancy or use.Details
33rd fl - this project consists of demolition of non-structural partitions, no-plumbing renovation of the break area, millwork, lighting and finishes within a single suite. includes construction of tv niches, millwork, finishes, 2 light fixtures. there will be no change in occupancy or use. | $493,359 |
| Dec 6, 2024 | Completed final sign-off Jan 2026 | 1 California St | Clune Construction Company L P | revision to permit 202406114142 revised restroom layout on ground and second floors. additional floor cores for low voltage stub-upsDetails
revision to permit 202406114142 revised restroom layout on ground and second floors. additional floor cores for low voltage stub-ups | $75,000 |
| Nov 5, 2024 | Completed final sign-off Oct 2025 | 2310 Fillmore St | Clune Construction Company L P | rev 202403188043- scope of work includes storefront upgrade at (e) bank branch. structural work to support storefront entrance. new slab on grade in some locations.Details
rev 202403188043- scope of work includes storefront upgrade at (e) bank branch. structural work to support storefront entrance. new slab on grade in some locations. | $10,000 |
| Oct 18, 2024 | Completed final sign-off Oct 2025 | 2310 Fillmore St | Clune Construction Company L P | new interior framing on 1st floor. no change of use, egress or occupancy. this is a revision to pa #202403188043.Details
new interior framing on 1st floor. no change of use, egress or occupancy. this is a revision to pa #202403188043. | $100,000 |
| Oct 9, 2024 | Completed final sign-off Oct 2025 | 2025 Van Ness Av | Clune Construction Company L P | structural revision to 202311130657: revision to architectural equipment, lighting, revising demo work. revision to structural framing of roof unit, show new stepped concrete, remove detail where new footing on north wall (new footing is built under wall). revise shoring post due to damaged sill plDetails
structural revision to 202311130657: revision to architectural equipment, lighting, revising demo work. revision to structural framing of roof unit, show new stepped concrete, remove detail where new footing on north wall (new footing is built under wall). revise shoring post due to damaged sill pl | |
| Aug 27, 2024 | Completed final sign-off Sep 2025 | 1 California St | Clune Construction Company L P | interior soft demo of (e) vacant tenant space. demo includes non-bearing partitions, suspended ceilings, and light fixtures, millwork fixtures, flooring and wall finishes, mech, electric, plumbing fixtures and distribution.Details
interior soft demo of (e) vacant tenant space. demo includes non-bearing partitions, suspended ceilings, and light fixtures, millwork fixtures, flooring and wall finishes, mech, electric, plumbing fixtures and distribution. | $125,000 |
| Jul 18, 2024 | Completed final sign-off Jan 2026 | 1 California St | Clune Construction Company L P | tenant improvement to (e) bank including: interior demo and mezzanine demo under separate pa# 2024-0827-9534. (n) passenger elevator, elevator shaft, & interior stair, new interior non-bearing partitions & suspended ceilings, millwork, & finishes. new mep equipment & distribution.Details
tenant improvement to (e) bank including: interior demo and mezzanine demo under separate pa# 2024-0827-9534. (n) passenger elevator, elevator shaft, & interior stair, new interior non-bearing partitions & suspended ceilings, millwork, & finishes. new mep equipment & distribution. | $2,663,000 |
| Jun 5, 2024 | Completed final sign-off Jul 2025 | 101 California St | Clune Construction Company L P | 21st fl full floor ti mep upgrades includedDetails
21st fl full floor ti mep upgrades included | $8,789,816 |
| May 2, 2024 | Completed final sign-off Jun 2024 | 101 California St | Clune Construction Company L P | 21/f- soft demo to remove partitions, fixtures and finishesDetails
21/f- soft demo to remove partitions, fixtures and finishes | $125,000 |
| Mar 18, 2024 | Completed final sign-off Oct 2025 | 2310 Fillmore St | Clune Construction Company L P | interior and exterior tenant improvement of (e) building. trades include ameps. storefront remodel associated with new tenant, citibank. no change of use, sq footage, or building height. no impacts to (e) egress. this permit is associated with 2023-007557 prj/cua.Details
interior and exterior tenant improvement of (e) building. trades include ameps. storefront remodel associated with new tenant, citibank. no change of use, sq footage, or building height. no impacts to (e) egress. this permit is associated with 2023-007557 prj/cua. | $2,000,000 |
| Nov 30, 2023 | Completed final sign-off May 2024 | 2025 Van Ness Av | Clune Construction Company L P | demo of (e) ti, including interior non bearing partitions, suspended ceilings, mep fixtures, wall finishes. no exterior work.Details
demo of (e) ti, including interior non bearing partitions, suspended ceilings, mep fixtures, wall finishes. no exterior work. | $38,500 |
| Nov 13, 2023 | Completed final sign-off Oct 2025 | 2025 Van Ness Av | Clune Construction Company L P | tenant improvement of an existing commerical retail space, including: 1. exterior storefront and finishes 2. structural framing/bracing 3. interior non-bearing partitions 4. millwork and interior finishes 5. mep 6. civil - ada path of travel and parking complianceDetails
tenant improvement of an existing commerical retail space, including: 1. exterior storefront and finishes 2. structural framing/bracing 3. interior non-bearing partitions 4. millwork and interior finishes 5. mep 6. civil - ada path of travel and parking compliance | $3,400,000 |
| Oct 5, 2023 | Completed final sign-off Oct 2024 | 45 Fremont St | Clune Construction Company L P | 26/f-suite 2600: t.i., partial shell condition, no modification to (e) rated core barriers/exterior envelope. modifications to elevator lobby, maintain smoke barrier rating.Details
26/f-suite 2600: t.i., partial shell condition, no modification to (e) rated core barriers/exterior envelope. modifications to elevator lobby, maintain smoke barrier rating. | $5,000,000 |
| Aug 8, 2023 | Completed final sign-off Apr 2024 | 1 Market St | Skyline Construction, Clune Construction Company L P | 1/f: modification of (e) bank, no area or height work in scope, remove (e) exterior atms/night depository, restore windows to original condition. no change in use/occupancy/additional added building area.Details
1/f: modification of (e) bank, no area or height work in scope, remove (e) exterior atms/night depository, restore windows to original condition. no change in use/occupancy/additional added building area. | $120,000 |
| Jul 26, 2023 | Completed final sign-off Apr 2024 | 1 Market St | Skyline Construction, Clune Construction Company L P | remove existing vault and furniture. partially remove wall that encloses the exiting vault. provide new wall to its existing location. ab-017 demo. tenant space to be wentDetails
remove existing vault and furniture. partially remove wall that encloses the exiting vault. provide new wall to its existing location. ab-017 demo. tenant space to be went | $30,000 |
| Feb 14, 2023 | Completed final sign-off Dec 2023 | 1 Post St | Clune Construction Company L P | 3/f: demo/renovation of (e) multi-tenant corridors. demo finishes, lighting & ceiling. new finishes, ceiling & light fixtures.Details
3/f: demo/renovation of (e) multi-tenant corridors. demo finishes, lighting & ceiling. new finishes, ceiling & light fixtures. | $90,000 |
| Feb 9, 2023 | Expired or cancelled cancelled Jan 2026 | 345 California St | Clune Construction Company L P | 28/f: revision to bpa#202203250873, install new accessible stall @ men's restroom @ (e) locationDetails
28/f: revision to bpa#202203250873, install new accessible stall @ men's restroom @ (e) location | |
| Dec 28, 2022 | Completed final sign-off Dec 2023 | 1 Post St | Clune Construction Company L P | 3rd/flr ste #300: office expansion- interior office ti demo & construction of non-load bearing partitions, ceilings, lights & finishes. new mechanical, electrical & plumbing deferred.Details
3rd/flr ste #300: office expansion- interior office ti demo & construction of non-load bearing partitions, ceilings, lights & finishes. new mechanical, electrical & plumbing deferred. | $500,000 |
| Aug 12, 2022 | Never finaled issued Aug 2022, no final | 33 New Montgomery St | Clune Construction Company L P | 1/f: updating wall finishes in the atm vestibule & lobby walls. no structural work or modfidication of layout or walls. maher n/a.Details
1/f: updating wall finishes in the atm vestibule & lobby walls. no structural work or modfidication of layout or walls. maher n/a. | $500 |
| Aug 12, 2022 | Never finaled issued Aug 2022, no final | 625 Market St | Clune Construction Company L P | 1/f: updating wall finishes in the atm vestibule & lobby walls. no structural work or modfidication of layout or walls. maher n/a.Details
1/f: updating wall finishes in the atm vestibule & lobby walls. no structural work or modfidication of layout or walls. maher n/a. | $500 |
| Aug 3, 2022 | Completed final sign-off Aug 2023 | 345 California St | Clune Construction Company L P | suite 1650: tenant improvement to include selective demo and construction of non load bearing partitoins. ceiling grid and tile, new light fixtures, new office doors, frams. salvage and r euse e selected materials if practicable. new millwork, new finishes, assoc mech,ele, plumb.Details
suite 1650: tenant improvement to include selective demo and construction of non load bearing partitoins. ceiling grid and tile, new light fixtures, new office doors, frams. salvage and r euse e selected materials if practicable. new millwork, new finishes, assoc mech,ele, plumb. | $578,370 |
| Jul 11, 2022 | Never finaled issued Aug 2022, no final | 101 02nd St | Clune Construction Company L P | 24/f: revision to bpa#202205033424 to include selective demo, construction of an employee breakroom/pantry, casework, finishes, ceiling, lighting, electrical, & mechanicalDetails
24/f: revision to bpa#202205033424 to include selective demo, construction of an employee breakroom/pantry, casework, finishes, ceiling, lighting, electrical, & mechanical | |
| Jul 11, 2022 | Never finaled issued Aug 2022, no final | 101 02nd St | Clune Construction Company L P | 23/f: revision to bpa#202205033426 to include selective demo, construction of an employee breakroom/pantry, casework, finishes, ceiling, lighting, electrical, & mechanicalDetails
23/f: revision to bpa#202205033426 to include selective demo, construction of an employee breakroom/pantry, casework, finishes, ceiling, lighting, electrical, & mechanical | |
| May 3, 2022 | Completed final sign-off May 2023 | 101 02nd St | Clune Construction Company L P | 23rd fl: office tenant improvement to include selective demolition, construction of employee breakroom/pantry. new non-structural partitions, finishes, ceiling, lighting, electrical and mechanical.Details
23rd fl: office tenant improvement to include selective demolition, construction of employee breakroom/pantry. new non-structural partitions, finishes, ceiling, lighting, electrical and mechanical. | $1,670,000 |
| May 3, 2022 | Completed final sign-off May 2023 | 101 02nd St | Clune Construction Company L P | 24th fl: office tenant improvement to include selective demolition, construction of employee breakroom / panyry. new non-structural partitions, finishes, ceiling, lighting, electrical and mechanical.Details
24th fl: office tenant improvement to include selective demolition, construction of employee breakroom / panyry. new non-structural partitions, finishes, ceiling, lighting, electrical and mechanical. | $1,670,000 |
| Apr 29, 2022 | Never finaled issued May 2022, no final | 525 Market St | Clune Construction Company L P | 33/f: install fire proofing to underside of level 33 metal decking, approximately 185 sq. ft.Details
33/f: install fire proofing to underside of level 33 metal decking, approximately 185 sq. ft. | $15,000 |
| Apr 20, 2022 | Never finaled issued May 2022, no final | 2 Embarcadero Center | Clune Construction Company L P | revision to pa 202009114001 includes (n) return grilles for area on level 20x 21 (n) lighting fixtures and receptacles in various areas.Details
revision to pa 202009114001 includes (n) return grilles for area on level 20x 21 (n) lighting fixtures and receptacles in various areas. | |
| Mar 25, 2022 | Completed final sign-off Feb 2024 | 345 California St | Clune Construction Company L P | 28/f: restroom accessibility compliances upgrades: demo and construction of toilet partitions, new plumbing and new finishes. maher n/a.Details
28/f: restroom accessibility compliances upgrades: demo and construction of toilet partitions, new plumbing and new finishes. maher n/a. | $218,812 |
| Feb 22, 2022 | Never finaled issued Apr 2022, no final | 625 Market St | Clune Construction Company L P | lobby: the replace of 2 existing pendant light fixture clusters with 2 new surface mounted light fixtures to match (e) in the lobby. no change of occupancy. sprinkler under sep permit, if applic.Details
lobby: the replace of 2 existing pendant light fixture clusters with 2 new surface mounted light fixtures to match (e) in the lobby. no change of occupancy. sprinkler under sep permit, if applic. | $500 |
| Feb 18, 2022 | Never finaled issued Jun 2022, no final | 555 California St | Clune Construction Company L P | 22/f: new non-structural partitions. new electrical and light fixtures. new finishes. maher n/aDetails
22/f: new non-structural partitions. new electrical and light fixtures. new finishes. maher n/a | $389,215 |
| Feb 18, 2022 | Never finaled issued Jun 2022, no final | 555 California St | Clune Construction Company L P | 21/f: new non-structural partitions. new electrical and light fixtures. new finishes. maher n/aDetails
21/f: new non-structural partitions. new electrical and light fixtures. new finishes. maher n/a | $133,195 |
| Feb 9, 2022 | Never finaled issued Feb 2022, no final | 560 Mission St | Clune Construction Company L P | 23/f-revision to pa# 202105039686 & 202109299498. revision includes removal of door 0012b, adding door 0012a, updates to partition fire ratings per field verified existing conditions. scope to remove priviously approved door add 90 min door to mech roomDetails
23/f-revision to pa# 202105039686 & 202109299498. revision includes removal of door 0012b, adding door 0012a, updates to partition fire ratings per field verified existing conditions. scope to remove priviously approved door add 90 min door to mech room | |
| Feb 1, 2022 | Never finaled issued Feb 2022, no final | 2 Embarcadero Center | Clune Construction Company L P | revision to pa 2020-0911-4001 20th & 21st fl mnor revision to replace (e) non-structural partitions with new glass walls per planDetails
revision to pa 2020-0911-4001 20th & 21st fl mnor revision to replace (e) non-structural partitions with new glass walls per plan | |
| Nov 18, 2021 | Completed final sign-off Mar 2022 | 650 Townsend St | Clune Construction Company L P | revision to pa# 202011209346. ste 160 & 180. revise scope of demolition. add finishes to existing corridor. modify existing non-building steel structure.Details
revision to pa# 202011209346. ste 160 & 180. revise scope of demolition. add finishes to existing corridor. modify existing non-building steel structure. | |
| Nov 10, 2021 | Completed final sign-off Sep 2022 | 525 Market St | Clune Construction Company L P | demo only permit: removal of non-loading bearing partitions, selective demo of existing ceiling grid & tile light fixtures, millwork, electrical,plumbing,finishes & office doors.Details
demo only permit: removal of non-loading bearing partitions, selective demo of existing ceiling grid & tile light fixtures, millwork, electrical,plumbing,finishes & office doors. | $140,000 |
| Oct 14, 2021 | Completed final sign-off Dec 2021 | 1 Sansome St | Clune Construction Company L P | 23rd fl - remove mechanical scope from 2018-0926-1516Details
23rd fl - remove mechanical scope from 2018-0926-1516 | |
| Oct 8, 2021 | Completed final sign-off Jul 2022 | 1390 Market St | Clune Construction Company L P | g/f suite 109: a 2542 sq. ft. single tenant improvement for medical office. no exterior modification. tenant improvement for non-emergency medical office.Details
g/f suite 109: a 2542 sq. ft. single tenant improvement for medical office. no exterior modification. tenant improvement for non-emergency medical office. | $850,000 |
| Sep 29, 2021 | Never finaled issued Oct 2021, no final | 560 Mission St | Clune Construction Company L P | 23rd floor:revision to app#202105039686. revisions include micro kitchen layout, added 3 compartment sink and mop sink, minor updates to door and hardware schedules; wall floor and ceiling finishes, millwork,lighting and associated mep.Details
23rd floor:revision to app#202105039686. revisions include micro kitchen layout, added 3 compartment sink and mop sink, minor updates to door and hardware schedules; wall floor and ceiling finishes, millwork,lighting and associated mep. | |
| Sep 16, 2021 | Completed final sign-off Jun 2022 | 555 Mission St | Clune Construction Company L P | 19th fl: t.i. includes demo of non-structural partitions & building of (n) non-structural partitions. new or revised mep's deferrred fire protection/ sprinklers/ fire alarm if needed. building is fully sprinklered.Details
19th fl: t.i. includes demo of non-structural partitions & building of (n) non-structural partitions. new or revised mep's deferrred fire protection/ sprinklers/ fire alarm if needed. building is fully sprinklered. | $100,000 |
| Sep 16, 2021 | Completed final sign-off Jul 2022 | 150 California St | Clune Construction Company L P | 2nd fl ste 200: (e) tenant space. modifying (e) partitions, doors, ceilings, and finishes, as well as lighting, power and mechanical systems.Details
2nd fl ste 200: (e) tenant space. modifying (e) partitions, doors, ceilings, and finishes, as well as lighting, power and mechanical systems. | $888,000 |
| Sep 14, 2021 | Expired or cancelled cancelled Jan 2026 | 650 Townsend St | Clune Construction Company L P | revision to pa. 202011209346. add 1 hr rated,wall details, to existing stairwell, no changes.Details
revision to pa. 202011209346. add 1 hr rated,wall details, to existing stairwell, no changes. | $250,000 |
| Aug 10, 2021 | Completed final sign-off Feb 2022 | 128 Post St | Clune Construction Company L P | 1/f: rev to 202105210819: add waterless urinal to unisex restroom. reconfiguration of celiing clouds & lighting. no exterior changes.Details
1/f: rev to 202105210819: add waterless urinal to unisex restroom. reconfiguration of celiing clouds & lighting. no exterior changes. | $135,000 |
| Aug 9, 2021 | Completed final sign-off Dec 2022 | 560 Mission St | Clune Construction Company L P | ste 600: furniture relocation & minor work on finishes. demo of non-structural partitions & celings. mech: demo ductwork, cap duct, relocate linear diffuser,relocate fan power box. elect: power, data/signal.Details
ste 600: furniture relocation & minor work on finishes. demo of non-structural partitions & celings. mech: demo ductwork, cap duct, relocate linear diffuser,relocate fan power box. elect: power, data/signal. | $2,000,000 |
| Jul 1, 2021 | Never finaled issued Jul 2021, no final | 699 08th St | Clune Construction Company L P | deferred structural to approved permit 2020-1207-0374Details
deferred structural to approved permit 2020-1207-0374 | $50,000 |
| Jun 21, 2021 | Never finaled issued Jul 2021, no final | 699 08th St | Clune Construction Company L P | 3rd floor: revision to egress plans on app#202101132623Details
3rd floor: revision to egress plans on app#202101132623 | |
| Jun 15, 2021 | Completed final sign-off Oct 2021 | 1 Bush St | Clune Construction Company L P | mechanical, electrical, plumbing (mep) for approved permit #201912139467. full mech, electrical, plumbing for office improvement.Details
mechanical, electrical, plumbing (mep) for approved permit #201912139467. full mech, electrical, plumbing for office improvement. | |
| Jun 11, 2021 | Completed final sign-off Jul 2023 | 555 California St | Clune Construction Company L P | 42/f 45/f: tenant improvement of (e) core and shell. new non-load partitions for lobby, offices, elevator, conference rooms, maher n/a.Details
42/f 45/f: tenant improvement of (e) core and shell. new non-load partitions for lobby, offices, elevator, conference rooms, maher n/a. | $121,000 |
| Jun 10, 2021 | Completed final sign-off Jul 2022 | 560 Mission St | Clune Construction Company L P | interior tenant demo & improvement of (e) office space, new partitons, ceilings, restrooms, ducts. fire alarm and sprinkler under sep permits.Details
interior tenant demo & improvement of (e) office space, new partitons, ceilings, restrooms, ducts. fire alarm and sprinkler under sep permits. | $2,511,150 |
| May 21, 2021 | Completed final sign-off Feb 2022 | 128 Post St | Clune Construction Company L P | renovation of existing retail space ot include new partition walls, suspended ceiling clouds, new plumbing fixtures, electrical & mechanical for open retail display area, small breakroom area for staff, unisex restroom & storage room.Details
renovation of existing retail space ot include new partition walls, suspended ceiling clouds, new plumbing fixtures, electrical & mechanical for open retail display area, small breakroom area for staff, unisex restroom & storage room. | $970,000 |
| May 3, 2021 | Never finaled issued Aug 2021, no final | 560 Mission St | Clune Construction Company L P | t.i. to 18,026 sqft alterations include non-struc partitions, finishes, furniture+equipment+associated m.e.p. & smoke control system revisions, , 2-hr horizontal exit, 2-hr fire barrier, 2 zone smoke control. struc work to av supports+header for 3 large openings. expand micro kitchen for food prep.Details
t.i. to 18,026 sqft alterations include non-struc partitions, finishes, furniture+equipment+associated m.e.p. & smoke control system revisions, , 2-hr horizontal exit, 2-hr fire barrier, 2 zone smoke control. struc work to av supports+header for 3 large openings. expand micro kitchen for food prep. | $2,345,801 |
| Mar 19, 2021 | Completed final sign-off Sep 2025 | 505 Montgomery St | Clune Construction Company L P | 13-fl: deferred submittal to pa 202011138879. mechanical work: install new ducts and grills. relocate (e) thermostats. relocate and rebalance exhaust fans, vav termnal boxes. upgrade 3 pneumatic vav terminal boxes.Details
13-fl: deferred submittal to pa 202011138879. mechanical work: install new ducts and grills. relocate (e) thermostats. relocate and rebalance exhaust fans, vav termnal boxes. upgrade 3 pneumatic vav terminal boxes. | $110,000 |
| Jan 13, 2021 | Completed final sign-off Oct 2021 | 699 08th St | Clune Construction Company L P | 3/f: voluntary addition of operable fire partition at 3rd floor atrium breakroom.Details
3/f: voluntary addition of operable fire partition at 3rd floor atrium breakroom. | $100,000 |
| Dec 7, 2020 | Completed final sign-off Jul 2022 | 699 08th St | Clune Construction Company L P | concourse: interior commercial office tenant improvement. minor demolition. construction of non-bearing interior partitions.Details
concourse: interior commercial office tenant improvement. minor demolition. construction of non-bearing interior partitions. | $2,382,895 |
| Nov 20, 2020 | Completed final sign-off Feb 2022 | 650 Townsend St | Clune Construction Company L P | ste 160 & 180: demolish non-structural elements including partitions, doors, equipment & finishes. construction of demising wall. replace lights and minimal flooring. mep under separate permit. ref pa# 201912200153Details
ste 160 & 180: demolish non-structural elements including partitions, doors, equipment & finishes. construction of demising wall. replace lights and minimal flooring. mep under separate permit. ref pa# 201912200153 | $935,000 |
| Nov 13, 2020 | Completed final sign-off Aug 2021 | 505 Montgomery St | Clune Construction Company L P | 13/f: tenant improvement - construction includes non-structural partitions, millwork, and finishes. mep, f/a and sprinklers will be under separate permitDetails
13/f: tenant improvement - construction includes non-structural partitions, millwork, and finishes. mep, f/a and sprinklers will be under separate permit | $1,132,800 |
| Nov 5, 2020 | Completed final sign-off Sep 2025 | 505 Montgomery St | Clune Construction Company L P | 13th fl: demo of existing non structural, partitions, doors & frames, millwork, finishes, electrical and portion of ceiling and lighting. accessibility per ab-017 deferral. sprinkler permit under pa# 2020-1120-9421.Details
13th fl: demo of existing non structural, partitions, doors & frames, millwork, finishes, electrical and portion of ceiling and lighting. accessibility per ab-017 deferral. sprinkler permit under pa# 2020-1120-9421. | $100,000 |
| Sep 20, 2020 | Completed final sign-off Jan 2022 | 201 03rd St | Clune Construction Company L P | infill a staircase opening from the 4th to 5th floor. maher n/a.Details
infill a staircase opening from the 4th to 5th floor. maher n/a. | $500,000 |
| Aug 18, 2020 | Completed final sign-off Mar 2021 | 699 08th St | Clune Construction Company L P | mechanical deferred submittal to 2019.1030.5929 1. re-use existing vav boxes and ductwork as shown 2. provide new duct, vav boxes, and grilles as required 3. air balance area of workDetails
mechanical deferred submittal to 2019.1030.5929 1. re-use existing vav boxes and ductwork as shown 2. provide new duct, vav boxes, and grilles as required 3. air balance area of work | $500,000 |
| Aug 18, 2020 | Never finaled issued Oct 2020, no final | 699 08th St | Clune Construction Company L P | deferred structural submittal to 2019.1030.5929 structural support system for modernfold door systemDetails
deferred structural submittal to 2019.1030.5929 structural support system for modernfold door system | $10,000 |
| Aug 10, 2020 | Completed final sign-off Mar 2021 | 555 California St | Clune Construction Company L P | 14th fl: new non-structural partitions, new electrical, new ceiling with new light fixtures, & new finishes. mep included. maher naDetails
14th fl: new non-structural partitions, new electrical, new ceiling with new light fixtures, & new finishes. mep included. maher na | $712,000 |
| Jun 26, 2020 | Never finaled issued Sep 2020, no final | 3251 20th Av | Clune Construction Company L P | suite 242a: t.i., on g/f: selective demolition, new non-load bearing partitions, celings, ffe, millwork, mechanical, and plumbing.Details
suite 242a: t.i., on g/f: selective demolition, new non-load bearing partitions, celings, ffe, millwork, mechanical, and plumbing. | $471,000 |
| Jun 26, 2020 | Completed final sign-off Dec 2020 | 345 Spear St | Clune Construction Company L P | suite 120: tenant improvement-2800 sf medical abulatory care facility.Details
suite 120: tenant improvement-2800 sf medical abulatory care facility. | $922,900 |
| Feb 18, 2020 | Completed final sign-off Feb 2021 | 699 08th St | Clune Construction Company L P | bakery relocation - minor demolition of non-bearing interior partitions.Details
bakery relocation - minor demolition of non-bearing interior partitions. | $235,302 |
| Jan 16, 2020 | Never finaled issued Jan 2020, no final | 22 04th St | Clune Construction Company L P | 7th fl: minor demo to non-bearing wall per ab-017.Details
7th fl: minor demo to non-bearing wall per ab-017. | $10,000 |
| Dec 30, 2019 | Completed final sign-off Mar 2021 | 650 Townsend St | Clune Construction Company L P | install one 24/7 cooling only dx spot systemDetails
install one 24/7 cooling only dx spot system | $60,000 |
| Dec 30, 2019 | Completed final sign-off Oct 2020 | 699 08th St | Clune Construction Company L P | 4th floor: add one single all gender restroom. demo & partition permit under separate pa# 2019-0516-0883 & 2019-0610-3001Details
4th floor: add one single all gender restroom. demo & partition permit under separate pa# 2019-0516-0883 & 2019-0610-3001 | $50,000 |
| Dec 30, 2019 | Completed final sign-off Oct 2020 | 699 08th St | Clune Construction Company L P | 3rd floor: add one single all gneder restroom. demo & construction under separate pa# 2019-0516-0883 & 2019-0610-2944Details
3rd floor: add one single all gneder restroom. demo & construction under separate pa# 2019-0516-0883 & 2019-0610-2944 | $50,000 |
| Dec 27, 2019 | Completed final sign-off Apr 2021 | 245 Market St | Clune Construction Company L P | rev to pa# 201711022935; relocate power door actuators, provide level landing to door activators. n/a maherDetails
rev to pa# 201711022935; relocate power door actuators, provide level landing to door activators. n/a maher | $20,000 |
| Dec 13, 2019 | Completed final sign-off Oct 2021 | 1 Bush St | Clune Construction Company L P | 4th fl: partial ti consisting of new non-load bearing partitions, glazing, doors, millwork, lighting, electrical, a/v, telecom, plumbing, and mechanical. no structural. mep, fire life safety deferred.Details
4th fl: partial ti consisting of new non-load bearing partitions, glazing, doors, millwork, lighting, electrical, a/v, telecom, plumbing, and mechanical. no structural. mep, fire life safety deferred. | $1,200,000 |
| Nov 21, 2019 | Expired or cancelled cancelled Jan 2026 | 44 Montgomery St | Clune Construction Company L P | 41st floor: install new split system ac system for suppemental cooling to server closet with new louver at window.Details
41st floor: install new split system ac system for suppemental cooling to server closet with new louver at window. | $90,000 |
| Oct 30, 2019 | Completed final sign-off Mar 2021 | 699 08th St | Clune Construction Company L P | 2nd floor: minor demolition and construction of non-bearing interior partitions in currently vacant suite for new open office and meeting rooms and add one single use all gender restroom. n/a for maherDetails
2nd floor: minor demolition and construction of non-bearing interior partitions in currently vacant suite for new open office and meeting rooms and add one single use all gender restroom. n/a for maher | $1,500,000 |
| Oct 22, 2019 | Never finaled issued Nov 2019, no final | 560 Mission St | Clune Construction Company L P | revision to pa 201902273940 for rooms 31-043 & 31-044 of suite 3100 to be designated as training rooms w/ complete exit analysisDetails
revision to pa 201902273940 for rooms 31-043 & 31-044 of suite 3100 to be designated as training rooms w/ complete exit analysis | |
| Oct 1, 2019 | Expired or cancelled cancelled Feb 2020 | 500 Folsom St | Clune Construction Company L P | revision to app#201902072310. atm vestibule revision per ocii. revise rcp at atm vestibule with new ve light fixtures. change light, weight concrete to foam for raised floor. n/a for maherDetails
revision to app#201902072310. atm vestibule revision per ocii. revise rcp at atm vestibule with new ve light fixtures. change light, weight concrete to foam for raised floor. n/a for maher | $7,000 |
| Sep 19, 2019 | Completed final sign-off Feb 2020 | 343 Sansome St | Clune Construction Company L P | 10/f: rev to pa#201905241605: misc changes to include door schedules, card readers, ceiling plans as indicated per plans. maher n/a.Details
10/f: rev to pa#201905241605: misc changes to include door schedules, card readers, ceiling plans as indicated per plans. maher n/a. | |
| Aug 23, 2019 | Completed final sign-off Apr 2021 | 650 Townsend St | Clune Construction Company L P | mep to permits 201906102944 & 201906103001Details
mep to permits 201906102944 & 201906103001 | |
| Aug 9, 2019 | Never finaled issued Sep 2019, no final | 560 Mission St | Clune Construction Company L P | suite 3100 - revision to 201902273940 the structural scope of work is limited to provide support steel for a leaf wall on 31st floorDetails
suite 3100 - revision to 201902273940 the structural scope of work is limited to provide support steel for a leaf wall on 31st floor | |
| Jun 24, 2019 | Completed final sign-off Oct 2020 | 699 08th St | Clune Construction Company L P | upgrade to existing lobby that includes and not limited to new reception desk, new paint, new flooring, new lighting maher not reqDetails
upgrade to existing lobby that includes and not limited to new reception desk, new paint, new flooring, new lighting maher not req | $41,000 |
| Jun 10, 2019 | Completed final sign-off Oct 2020 | 699 08th St | Clune Construction Company L P | 4th fl - minor demo pa 2019-0516-0883 construction of non-bearing interior partitions in vacant suite for new open and meeting roomsDetails
4th fl - minor demo pa 2019-0516-0883 construction of non-bearing interior partitions in vacant suite for new open and meeting rooms | $5,000,000 |
| Jun 10, 2019 | Completed final sign-off Oct 2020 | 699 08th St | Clune Construction Company L P | 3rd flr - minor demo - construction of non bearing interior partitions in vacant suite for new opn office and meeting roomsDetails
3rd flr - minor demo - construction of non bearing interior partitions in vacant suite for new opn office and meeting rooms | $4,250,112 |
| Jun 4, 2019 | Completed final sign-off Dec 2019 | 560 Mission St | Clune Construction Company L P | 22/f: rev to pa201809049073 to general partition layout and passenger elevator exiting. maher n/a.Details
22/f: rev to pa201809049073 to general partition layout and passenger elevator exiting. maher n/a. | $1,000 |
| May 24, 2019 | Completed final sign-off Jun 2020 | 343 Sansome St | Clune Construction Company L P | 10th flr - interior ti, new partition, lights, doors and finishes, ceilings. maher naDetails
10th flr - interior ti, new partition, lights, doors and finishes, ceilings. maher na | $611,000 |
| May 16, 2019 | Completed final sign-off Mar 2021 | 699 08th St | Clune Construction Company L P | 1st flr, 3rd flr & 4th flr. minor demo of non-load bearing interior partitions in vacant suite.Details
1st flr, 3rd flr & 4th flr. minor demo of non-load bearing interior partitions in vacant suite. | $100,000 |
| May 13, 2019 | Never finaled issued Jun 2019, no final | 944 Stockton St | Clune Construction Company L P | install a new atm surround. replace old atm surround exterior. (ref 2019-0207-2345 landing & railing permit)Details
install a new atm surround. replace old atm surround exterior. (ref 2019-0207-2345 landing & railing permit) | $38,679 |
| Apr 11, 2019 | Completed final sign-off Feb 2020 | 343 Sansome St | Clune Construction Company L P | 12/f: ti new construction of one new interior partition, one relocated or new door. new exit signageDetails
12/f: ti new construction of one new interior partition, one relocated or new door. new exit signage | $8,000 |