Brandon Stevens
- License
- C36718
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- Firm
- Smithgroup
- Based in
- San Francisco
- On San Francisco permits
- Apr 2019 to Mar 2022
11 permits since 2000 (architect on 11 permits): 8 completed, 3 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Clune Construction Company L P (4), Gci, Inc (2), Skyline Construction (2), Field Construction Inc., M C S Construction Services
- Engineers
- Amit Wadhwa, Levi G. Abarte
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 11
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 17, 2022 | Completed final sign-off Aug 2022 | 4 Embarcadero Center | M C S Construction Services | 36/f suite 3660: interior ti. new construction includes new interior partitions, ceilings, mechanical, electrical, lighting, millwork. life safety, fire sprinkler, and mep deferred. no exterior work, no hazmat, no structural.Details
36/f suite 3660: interior ti. new construction includes new interior partitions, ceilings, mechanical, electrical, lighting, millwork. life safety, fire sprinkler, and mep deferred. no exterior work, no hazmat, no structural. | $125,000 |
| Oct 7, 2021 | Completed final sign-off Jun 2022 | 301 Battery St | Field Construction Inc. | 3/f: demolition, partitions, doors, millwork, finishes, ceilings, lighting, electrical a hvac. ref. sprinkler permit 202108116207Details
3/f: demolition, partitions, doors, millwork, finishes, ceilings, lighting, electrical a hvac. ref. sprinkler permit 202108116207 | $290,000 |
| Nov 21, 2019 | Completed final sign-off May 2020 | 101 02nd St | Skyline Construction | 6th floor ti: new construction includes interior partitions, ceilings, mep, caseworkDetails
6th floor ti: new construction includes interior partitions, ceilings, mep, casework | $1,100,000 |
| Nov 7, 2019 | Never finaled issued Nov 2019, no final | 101 02nd St | Skyline Construction | interior demo only. demo of non load beraing partitions, doors, millwork, finishes, ceilings & lighting. no exterior work. no hazmat. no structuralDetails
interior demo only. demo of non load beraing partitions, doors, millwork, finishes, ceilings & lighting. no exterior work. no hazmat. no structural | $75,600 |
| Sep 19, 2019 | Completed final sign-off Feb 2020 | 343 Sansome St | Clune Construction Company L P | 10/f: rev to pa#201905241605: misc changes to include door schedules, card readers, ceiling plans as indicated per plans. maher n/a.Details
10/f: rev to pa#201905241605: misc changes to include door schedules, card readers, ceiling plans as indicated per plans. maher n/a. | |
| Sep 16, 2019 | Completed final sign-off Aug 2020 | 1 California St | Gci, Inc | 22/f: interior ti new interior partitions, ceilings, light fixtures, casework doors maher not reqDetails
22/f: interior ti new interior partitions, ceilings, light fixtures, casework doors maher not req | $600,000 |
| Sep 10, 2019 | Completed final sign-off Aug 2020 | 1 California St | Gci, Inc | 22nd floor: interior demolition only. demolition of non-load bearing partitions, doors, millwork, finishes, ceilings, & lighting. n/a for maherDetails
22nd floor: interior demolition only. demolition of non-load bearing partitions, doors, millwork, finishes, ceilings, & lighting. n/a for maher | $30,000 |
| May 24, 2019 | Completed final sign-off Jun 2020 | 343 Sansome St | Clune Construction Company L P | 10th flr - interior ti, new partition, lights, doors and finishes, ceilings. maher naDetails
10th flr - interior ti, new partition, lights, doors and finishes, ceilings. maher na | $611,000 |
| May 3, 2019 | Never finaled issued Aug 2020, no final | 1663 Market St | administrative change of use. change of use on the first flr from personal services(massage) to (m) retail & (b) institutional office.**maher n/a**Details
administrative change of use. change of use on the first flr from personal services(massage) to (m) retail & (b) institutional office.**maher n/a** | ||
| Apr 11, 2019 | Never finaled issued Apr 2019, no final | 343 Sansome St | Clune Construction Company L P | interior demolition only. demoltion of non load bearing partitions. doors. millwork, finishes, ceilings, lightingDetails
interior demolition only. demoltion of non load bearing partitions. doors. millwork, finishes, ceilings, lighting | $30,000 |
| Apr 11, 2019 | Completed final sign-off Feb 2020 | 343 Sansome St | Clune Construction Company L P | 12/f: ti new construction of one new interior partition, one relocated or new door. new exit signageDetails
12/f: ti new construction of one new interior partition, one relocated or new door. new exit signage | $8,000 |