Block 3710, lot 019
45 Fremont St
- City’s use
- Commercial Office
- Built
- 1978
- Stories
- 34
- Building
- 692,000 sq ft
- Lot
- 31,763 sq ft
- Zoning
- C3O
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
The 200 most recent permits filed for this property.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 20, 2026 | In progress filed Oct 2026, not yet issued | 45 Fremont St | Novo Construction Inc | 3/f, 10/f, and 11/f: anchor details for new phone booths at 3rd, 10th, 11th floor. ref arch 202510288298.Details
3/f, 10/f, and 11/f: anchor details for new phone booths at 3rd, 10th, 11th floor. ref arch 202510288298. | $3,000 |
| Sep 8, 2026 | In progress filed Sep 2026, not yet issued | 45 Fremont St | 16th floor: t.i. project for a single tenant. scope of work includes a new non-rated partition layout to create conference rooms, private offices, phone rooms, pantry space, with new ceiling, floor, and wall finishes. mep included.Details
16th floor: t.i. project for a single tenant. scope of work includes a new non-rated partition layout to create conference rooms, private offices, phone rooms, pantry space, with new ceiling, floor, and wall finishes. mep included. | $1,200,000 | |
| Sep 8, 2026 | In progress filed Sep 2026, not yet issued | 45 Fremont St | 18th floor: t.i. for single tenant. new non rated partition layout to create conference room, private offices, phone rooms. new ceiling, floor, and wall finishes. mep included.Details
18th floor: t.i. for single tenant. new non rated partition layout to create conference room, private offices, phone rooms. new ceiling, floor, and wall finishes. mep included. | $3,000,000 | |
| Sep 8, 2026 | In progress filed Sep 2026, not yet issued | 45 Fremont St | non structural demo of level 28 office spaces with the exception of e restrooms, stairs, elec rooms and mech rooms. demo of e light fixtures and new light fixtures in open office, restrooms, elevator lobby. new plumbing fixtures to be installed at restrooms. demo of secondary duct branches.Details
non structural demo of level 28 office spaces with the exception of e restrooms, stairs, elec rooms and mech rooms. demo of e light fixtures and new light fixtures in open office, restrooms, elevator lobby. new plumbing fixtures to be installed at restrooms. demo of secondary duct branches. | $900,000 | |
| Aug 12, 2026 | In progress issued Aug 2026 | 45 Fremont St | Skyline Construction | 17/f: installation of life safety and seismic requirements for (2) one-person phone booths. accessibility upgrades in the core restrooms are also included. mep and fire life safety drawings are deferred.Details
17/f: installation of life safety and seismic requirements for (2) one-person phone booths. accessibility upgrades in the core restrooms are also included. mep and fire life safety drawings are deferred. | $127,000 |
| Apr 24, 2026 | Completed final sign-off Jul 2026 | 45 Fremont St | Principal Builders Inc. | installation of phonebooths on - 4 on level 7 and 4 on level 8Details
installation of phonebooths on - 4 on level 7 and 4 on level 8 | $95,000 |
| Dec 10, 2025 | In progress issued Dec 2025 | 45 Fremont St | Novo Construction Inc | mechanical, electrical, and plumbing for t.i. work on 3rd, 10th and 11th floor. ref: 202510288298.Details
mechanical, electrical, and plumbing for t.i. work on 3rd, 10th and 11th floor. ref: 202510288298. | $25,000 |
| Nov 14, 2025 | In progress issued Dec 2025 | 45 Fremont St | Pioneer Fire Inc. | 3rd/10th/11th/fl(s) : relocate 5 pendents. ref to t.i. 202510288298Details
3rd/10th/11th/fl(s) : relocate 5 pendents. ref to t.i. 202510288298 | $1,250 |
| Oct 28, 2025 | In progress issued Nov 2025 | 45 Fremont St | Novo Construction Inc | 3rd, 10th & 11th fl: tenant improvement. demolition of non load bearing partitions, glazing. new partitions and glazing. mep, sprinkler, fire alarm under separate permit.Details
3rd, 10th & 11th fl: tenant improvement. demolition of non load bearing partitions, glazing. new partitions and glazing. mep, sprinkler, fire alarm under separate permit. | $159,191 |
| Aug 13, 2025 | In progress filed Aug 2025, not yet issued | 45 Fremont St | Honeywell International, Inc | to obtain a final inspection for work approved under pa 201404183655, 201409237005, 201108222938, 201704244694, 200906220946. all work has been completed.Details
to obtain a final inspection for work approved under pa 201404183655, 201409237005, 201108222938, 201704244694, 200906220946. all work has been completed. | |
| Apr 4, 2025 | Completed final sign-off Apr 2025 | 45 Fremont St | Gci, Inc | to obtain a final inspection for work approved under pa 201704264951. all work is complete. evac signsDetails
to obtain a final inspection for work approved under pa 201704264951. all work is complete. evac signs | |
| Feb 7, 2025 | Completed final sign-off Feb 2026 | 45 Fremont St | Honeywell International, Inc | suite # 1320 13th flr: fire alarm tenant improvement. add (1) ceiling strobe. arch reference # 2024-1231-7563.Details
suite # 1320 13th flr: fire alarm tenant improvement. add (1) ceiling strobe. arch reference # 2024-1231-7563. | $2,500 |
| Feb 3, 2025 | Completed final sign-off Mar 2025 | 45 Fremont St | Honeywell International, Inc | 33/f: ref rev (a) fire permit 202501178551 - rev (b) scope change for 33/f only: demo 1 speaker strobe, 1 control relay. add 1 new control relay. ref building permits 202410012081 and 202410022155.Details
33/f: ref rev (a) fire permit 202501178551 - rev (b) scope change for 33/f only: demo 1 speaker strobe, 1 control relay. add 1 new control relay. ref building permits 202410012081 and 202410022155. | |
| Jan 29, 2025 | Completed final sign-off Mar 2025 | 45 Fremont St | Honeywell International, Inc | 34/f: install 4 speaker/strobes, 2 duct smoke detectors, 2 dual monitor modules, 2 relayes. ref t.i. 202411064499.Details
34/f: install 4 speaker/strobes, 2 duct smoke detectors, 2 dual monitor modules, 2 relayes. ref t.i. 202411064499. | $5,000 |
| Jan 17, 2025 | Completed final sign-off May 2025 | 45 Fremont St | Honeywell International, Inc | 33/fl: demo-41 speaker strobe, 8 speakers,2 strobes,1 control relay.add: 24 new speaker strobe, 8 speakers, 3 remove&replace mps, 2 remove&replace smoke assemblies, 6 remove and replace smoke detector & base. add 12 speaker strobe, 4 strobes, 2 sd,2dd 34/fl: demo-8 cieling spkr strobe,1 relay r1b,Details
33/fl: demo-41 speaker strobe, 8 speakers,2 strobes,1 control relay.add: 24 new speaker strobe, 8 speakers, 3 remove&replace mps, 2 remove&replace smoke assemblies, 6 remove and replace smoke detector & base. add 12 speaker strobe, 4 strobes, 2 sd,2dd 34/fl: demo-8 cieling spkr strobe,1 relay r1b, | $31,367 |
| Jan 8, 2025 | Completed final sign-off Apr 2025 | 45 Fremont St | Golden Gate Fire Protection Inc | fire sprinkler ti, relocate 68 pdendents on the 34th fl. ref permits 202410012081 and 202410022155Details
fire sprinkler ti, relocate 68 pdendents on the 34th fl. ref permits 202410012081 and 202410022155 | $17,000 |
| Jan 6, 2025 | Completed final sign-off Jan 2025 | 45 Fremont St | Golden Gate Fire Protection Inc | 34/f: fire sprinkler ti. relocate 10 pendents and 5 uprights on the 34/f. ref t.i 202411064499Details
34/f: fire sprinkler ti. relocate 10 pendents and 5 uprights on the 34/f. ref t.i 202411064499 | $4,000 |
| Dec 31, 2024 | Completed final sign-off Feb 2025 | 45 Fremont St | B N Builders Inc | 13/fl: suite 1320- ti improvement of non structural partitions and new partial height wall . addition of electrical power data throughout suite. no mep defferedDetails
13/fl: suite 1320- ti improvement of non structural partitions and new partial height wall . addition of electrical power data throughout suite. no mep deffered | $52,000 |
| Nov 6, 2024 | Completed final sign-off Jun 2025 | 45 Fremont St | Richlen Construction | 34th flr. tenant suite demising and corridor construction at the 34th flr. new non-structural partitions, mechanical, electrical, light, and finishes. minor plumbing modifications to mens restroom.Details
34th flr. tenant suite demising and corridor construction at the 34th flr. new non-structural partitions, mechanical, electrical, light, and finishes. minor plumbing modifications to mens restroom. | $350,000 |
| Oct 2, 2024 | Completed final sign-off Jun 2025 | 45 Fremont St | Skyline Construction | work on 33rd flr. demo of existing conference froom. demo of slab between 33 and 34 flr. constructino of single level stair connection. minor mepDetails
work on 33rd flr. demo of existing conference froom. demo of slab between 33 and 34 flr. constructino of single level stair connection. minor mep | $110,000 |
| Oct 1, 2024 | Completed final sign-off Jun 2025 | 45 Fremont St | Skyline Construction | 34/f partial floor - office tenant improvement. architecture and mep. new offices.Details
34/f partial floor - office tenant improvement. architecture and mep. new offices. | $375,000 |
| Jan 26, 2024 | Completed final sign-off Feb 2024 | 45 Fremont St | Johnson Controls Fire | ref pa 202310058110 26th fl provide (1) call station 2 wayDetails
ref pa 202310058110 26th fl provide (1) call station 2 way | $3,000 |
| Jan 5, 2024 | In progress issued Jan 2024 | 45 Fremont St | Honeywell International, Inc | fire alarm tenant improvement 26th fl. demo existing devices, additional being added. remove 11 sinks, 4 duct detectors, s4 pull stations, 4 speaker/strobes, 2 smokes, 1 duct detector,, 39 speaker strobes, 4 relaysDetails
fire alarm tenant improvement 26th fl. demo existing devices, additional being added. remove 11 sinks, 4 duct detectors, s4 pull stations, 4 speaker/strobes, 2 smokes, 1 duct detector,, 39 speaker strobes, 4 relays | $18,000 |
| Dec 21, 2023 | Completed final sign-off Jun 2024 | 45 Fremont St | Martin Sign Co Inc. | fabrication and installtion of acrylic evacuation maps for the 27th flDetails
fabrication and installtion of acrylic evacuation maps for the 27th fl | $970 |
| Nov 16, 2023 | Completed final sign-off Feb 2024 | 45 Fremont St | Anderson, Rowe & Buckley, Inc. | existing fire sprinkler system tenant improvements added 16, relocate 150 & 3 removed sprinklers. ref pa 2023-1005-8110Details
existing fire sprinkler system tenant improvements added 16, relocate 150 & 3 removed sprinklers. ref pa 2023-1005-8110 | $105,000 |
| Oct 5, 2023 | Completed final sign-off Oct 2024 | 45 Fremont St | Clune Construction Company L P | 26/f-suite 2600: t.i., partial shell condition, no modification to (e) rated core barriers/exterior envelope. modifications to elevator lobby, maintain smoke barrier rating.Details
26/f-suite 2600: t.i., partial shell condition, no modification to (e) rated core barriers/exterior envelope. modifications to elevator lobby, maintain smoke barrier rating. | $5,000,000 |
| Aug 18, 2023 | Completed final sign-off Mar 2025 | 45 Fremont St | Skyline Construction | to obtain final inspection for work approved under pa# 201712196915. all work is complete.Details
to obtain final inspection for work approved under pa# 201712196915. all work is complete. | |
| Jul 28, 2023 | Completed final sign-off Aug 2023 | 45 Fremont St | Richlen Construction | 28th flr: recommencement and completion of work approved under pa #201507222162.Details
28th flr: recommencement and completion of work approved under pa #201507222162. | |
| Jul 28, 2023 | Completed final sign-off Sep 2023 | 45 Fremont St | Honeywell International, Inc | 27/f: fire alarm- demo existing. replace smoke and duct detectors, adding speaker and strobesDetails
27/f: fire alarm- demo existing. replace smoke and duct detectors, adding speaker and strobes | $23,000 |
| Jun 30, 2023 | Completed final sign-off Aug 2024 | 45 Fremont St | Johnson Controls Fire | 27/f: ref pa 2023-0428-6752, add 2 rath 2-way call stationsDetails
27/f: ref pa 2023-0428-6752, add 2 rath 2-way call stations | $3,000 |
| Jun 20, 2023 | Completed final sign-off Aug 2023 | 45 Fremont St | Anderson, Rowe & Buckley, Inc. | t.i - existing fire sprinkler system.relocte 143 pendents sprinkler, relocate 30 upright sprinkers. ref pa# 202304286752Details
t.i - existing fire sprinkler system.relocte 143 pendents sprinkler, relocate 30 upright sprinkers. ref pa# 202304286752 | $108,000 |
| May 23, 2023 | Completed final sign-off Oct 2023 | 45 Fremont St | Principal Builders Inc. | deferred mep for 202304286752Details
deferred mep for 202304286752 | $1,453,000 |
| Apr 28, 2023 | Completed final sign-off Oct 2023 | 45 Fremont St | Principal Builders Inc. | 27th fl t.i. currently unoccupied. fire alarm and sprinkler and mep deferred. no exterior changes.Details
27th fl t.i. currently unoccupied. fire alarm and sprinkler and mep deferred. no exterior changes. | $4,250,000 |
| Mar 29, 2023 | Completed final sign-off Sep 2023 | 45 Fremont St | Anderson, Rowe & Buckley, Inc. | 27th fl: (e) fire sprinkler system: 6 sprinklers demo. sprinkler will be temporarly protection, turned upDetails
27th fl: (e) fire sprinkler system: 6 sprinklers demo. sprinkler will be temporarly protection, turned up | $3,600 |
| Mar 23, 2023 | Completed final sign-off Oct 2023 | 45 Fremont St | Principal Builders Inc. | 27/f: demo of interior restrooms: ceiling, (e) light fixtures, remove decorative light fixtures, toilet partitions, remove toilet urinal fixtures, restroom accessories, countertops, lavatories, mirrors and tile from walls and floor. no load bearing element affected. to remain vacant per ab-017Details
27/f: demo of interior restrooms: ceiling, (e) light fixtures, remove decorative light fixtures, toilet partitions, remove toilet urinal fixtures, restroom accessories, countertops, lavatories, mirrors and tile from walls and floor. no load bearing element affected. to remain vacant per ab-017 | $10,000 |
| Dec 6, 2022 | Completed final sign-off Dec 2022 | 45 Fremont St | Honeywell International, Inc | 26/f and 27/f: fls decommissioning due to architectural demo by others. these flrs will return to core shell and will be unoccupied after the demo. any new ti will be under a separate permit. no new devices will be installed. some devices will be relocated to accommodate the unoccupied space.Details
26/f and 27/f: fls decommissioning due to architectural demo by others. these flrs will return to core shell and will be unoccupied after the demo. any new ti will be under a separate permit. no new devices will be installed. some devices will be relocated to accommodate the unoccupied space. | $1,000 |
| Oct 28, 2022 | Completed final sign-off Feb 2023 | 45 Fremont St | Honeywell International, Inc | 13th fl: this is an as-built permit for the approved fire alarm pa# 202208080068. the changes in this as-built permit is to add (2) control relays and to update the device addresses.Details
13th fl: this is an as-built permit for the approved fire alarm pa# 202208080068. the changes in this as-built permit is to add (2) control relays and to update the device addresses. | $1,000 |
| Oct 18, 2022 | Completed final sign-off Jul 2024 | 45 Fremont St | Honeywell International, Inc | 29th fl: as built permit for the approved fire alarm pa# 2022-0630-7456 the changes in this as built permit is to add (1) smoke detector and to update device addressesDetails
29th fl: as built permit for the approved fire alarm pa# 2022-0630-7456 the changes in this as built permit is to add (1) smoke detector and to update device addresses | $650 |
| Oct 18, 2022 | Completed final sign-off Jul 2024 | 45 Fremont St | Honeywell International, Inc | 30th fl. this is an as built permit for the approved fire alarm pa# 2022-0630-7457, no new devices were added in ths as built the only change is to update device addressesDetails
30th fl. this is an as built permit for the approved fire alarm pa# 2022-0630-7457, no new devices were added in ths as built the only change is to update device addresses | |
| Aug 8, 2022 | Completed final sign-off Feb 2023 | 45 Fremont St | Honeywell International, Inc | ref pa# 202205265045. fls modification: add 4 door holders, 36 spkr/strobs, 2 strobes, 5 smk detectors, 6 control relays, 9 pilot relays, 2 duct detectors. replace 6 spke/strbs with new; relocate 1 duct det and 4 smk det.Details
ref pa# 202205265045. fls modification: add 4 door holders, 36 spkr/strobs, 2 strobes, 5 smk detectors, 6 control relays, 9 pilot relays, 2 duct detectors. replace 6 spke/strbs with new; relocate 1 duct det and 4 smk det. | $33,500 |
| Jul 26, 2022 | Completed final sign-off Oct 2022 | 45 Fremont St | Ayoob & Peery Plumbing Co Inc | 13th fl: add and relocate sprinklers as necessary in accordance with tenant improvement. install pipe hangers as needed for new sprinkler pipe. ref pa #202205265045.Details
13th fl: add and relocate sprinklers as necessary in accordance with tenant improvement. install pipe hangers as needed for new sprinkler pipe. ref pa #202205265045. | $28,750 |
| Jul 26, 2022 | Completed final sign-off Sep 2022 | 45 Fremont St | Golden Gate Fire Protection Inc | 30/f:relocate 133 fire sprinler pendant heads. ref ti pa202203149885.Details
30/f:relocate 133 fire sprinler pendant heads. ref ti pa202203149885. | $69,825 |
| Jul 25, 2022 | Completed final sign-off Aug 2022 | 45 Fremont St | Richlen Construction | revision to bldg pa# 2019-0411-7722. minor changes/as builts for glazing details.Details
revision to bldg pa# 2019-0411-7722. minor changes/as builts for glazing details. | $4,000 |
| Jul 11, 2022 | Completed final sign-off Sep 2022 | 45 Fremont St | True North Signs & Graphic Services | vinyl signage at storefrontDetails
vinyl signage at storefront | $2,200 |
| Jul 11, 2022 | Completed final sign-off Sep 2022 | 45 Fremont St | True North Signs & Graphic Services | sign c: vinyl sign on entry glass "store hours"Details
sign c: vinyl sign on entry glass "store hours" | $2,200 |
| Jul 11, 2022 | Completed final sign-off Sep 2022 | 45 Fremont St | True North Signs & Graphic Services | sign b: vinyl logos on entry glass "proper food"Details
sign b: vinyl logos on entry glass "proper food" | $2,200 |
| Jul 11, 2022 | Completed final sign-off Sep 2022 | 45 Fremont St | True North Signs & Graphic Services | sign d: vinyl logo on window "proper food"Details
sign d: vinyl logo on window "proper food" | $2,200 |
| Jun 30, 2022 | Completed final sign-off Oct 2022 | 45 Fremont St | Honeywell International, Inc | 29/f:ref pa 202203149889 fls mod; add (4) door holders; (1) emergency door release; (26) spearkers/strobes; (1) strobe. (14) smk detectors; (5) control relays; (5) rib relays; (2) duct detectors; replace (4) pull stations, 15 smoke detectors; (4) spk/strobs w/ new demo devices shown in sheet f6.1Details
29/f:ref pa 202203149889 fls mod; add (4) door holders; (1) emergency door release; (26) spearkers/strobes; (1) strobe. (14) smk detectors; (5) control relays; (5) rib relays; (2) duct detectors; replace (4) pull stations, 15 smoke detectors; (4) spk/strobs w/ new demo devices shown in sheet f6.1 | $30,000 |
| Jun 30, 2022 | Completed final sign-off Sep 2022 | 45 Fremont St | Golden Gate Fire Protection Inc | 29/f: fire sprinklers relocate 136 pendents on the 29th floor. ref ti pa 202203149889Details
29/f: fire sprinklers relocate 136 pendents on the 29th floor. ref ti pa 202203149889 | $71,400 |
| Jun 30, 2022 | Completed final sign-off Oct 2022 | 45 Fremont St | Honeywell International, Inc | 30/f: ref pa 202203149885, add (4) door holders; (1) emergency door release; (26) spkr/strobes (1) strb; (5) smoke detector (5) control relays; 3 rib relays; (2) duct detector; replace (4) pull station, (10) smk detectors, (4) spkr/strobes w/new. demo devices shown in sheet f6.1Details
30/f: ref pa 202203149885, add (4) door holders; (1) emergency door release; (26) spkr/strobes (1) strb; (5) smoke detector (5) control relays; 3 rib relays; (2) duct detector; replace (4) pull station, (10) smk detectors, (4) spkr/strobes w/new. demo devices shown in sheet f6.1 | $30,000 |
| Jun 28, 2022 | Completed final sign-off Sep 2022 | 45 Fremont St | Honeywell International, Inc | 1st/ground fl modification remove (3) sprinkler/strobbes install (4) sprinkler strobes ref pa# 2022-0505-3596.Details
1st/ground fl modification remove (3) sprinkler/strobbes install (4) sprinkler strobes ref pa# 2022-0505-3596. | $2,500 |
| Jun 28, 2022 | Completed final sign-off Jul 2022 | 45 Fremont St | Potter Fire Protection | relocate 3 fire sprinklers ref pa 2022-0505-3596Details
relocate 3 fire sprinklers ref pa 2022-0505-3596 | $2,120 |
| May 26, 2022 | Completed final sign-off Aug 2023 | 45 Fremont St | Richlen Construction | 13th fl: interior tenant improvement. full build out on 13th fl. new non-structural partitions, mechanical, plumbing, electrical, lighting and finishes.Details
13th fl: interior tenant improvement. full build out on 13th fl. new non-structural partitions, mechanical, plumbing, electrical, lighting and finishes. | $1,600,000 |
| May 5, 2022 | Completed final sign-off Jun 2022 | 45 Fremont St | Honeywell International, Inc | 34/f: as built for bpa#202203119788. new new devices installed, changes are update device addresses, replace (1) duct detector to plenum smoke det, remove (2) duct det, remove (1) control relayDetails
34/f: as built for bpa#202203119788. new new devices installed, changes are update device addresses, replace (1) duct detector to plenum smoke det, remove (2) duct det, remove (1) control relay | |
| May 5, 2022 | Completed final sign-off Sep 2022 | 45 Fremont St | Northern Sun Associates | ground floor first time tenant improvement with house of operation m-f 7am-5:30pm. improvements include (n) food service area, casework, int lighting. establishment sells food prepared & packaged off site with no requirement for additional "food preparation". no change to bldg footprint or exterior.Details
ground floor first time tenant improvement with house of operation m-f 7am-5:30pm. improvements include (n) food service area, casework, int lighting. establishment sells food prepared & packaged off site with no requirement for additional "food preparation". no change to bldg footprint or exterior. | $175,000 |
| Mar 14, 2022 | Completed final sign-off Jul 2023 | 45 Fremont St | Richlen Construction | 29/f: tenant improvement for existing office space. non-bearing partitions, millwork and suspended ceiling system throughout. area of work 16,932 sf.Details
29/f: tenant improvement for existing office space. non-bearing partitions, millwork and suspended ceiling system throughout. area of work 16,932 sf. | $761,940 |
| Mar 14, 2022 | Completed final sign-off Jul 2023 | 45 Fremont St | Richlen Construction | 30/f: tenant improvement for existing office space. non-bearing partitions, millwork and suspended ceiling system throughout. area of work 16,932 sf.Details
30/f: tenant improvement for existing office space. non-bearing partitions, millwork and suspended ceiling system throughout. area of work 16,932 sf. | $761,940 |
| Mar 11, 2022 | Completed final sign-off Jun 2022 | 45 Fremont St | Honeywell International, Inc | 34/f: ref permit 202202047403. fa addition: install 15 speakers/strobes, 4 smoke detectors, 6 rib, 3 control relays, 3 duct detector. replace 13 smoke detectors, 1 rps, 4 pull stations, 2 duct det., 1 speaker, and 5 speakers/strobes.Details
34/f: ref permit 202202047403. fa addition: install 15 speakers/strobes, 4 smoke detectors, 6 rib, 3 control relays, 3 duct detector. replace 13 smoke detectors, 1 rps, 4 pull stations, 2 duct det., 1 speaker, and 5 speakers/strobes. | $25,000 |
| Feb 18, 2022 | Completed final sign-off Apr 2022 | 45 Fremont St | Honeywell International, Inc | fire alarm, decommissioning 0n 19th,20th,21st,22nd,23rd&24th flrs due to architectural demo by others. these floors will be returned to core shell&will be unoccupied. any new and future ti will be on separate permit.no new devices provided under this permit.Details
fire alarm, decommissioning 0n 19th,20th,21st,22nd,23rd&24th flrs due to architectural demo by others. these floors will be returned to core shell&will be unoccupied. any new and future ti will be on separate permit.no new devices provided under this permit. | $6,000 |
| Feb 18, 2022 | Completed final sign-off Mar 2022 | 45 Fremont St | H & M Fire Protection, Inc. | 19/f: remove (e) pendent spirnlers due to ceiling demo and replace with new upright sprinklers to create an open shell condition. ref pa 202201075565. maher n/aDetails
19/f: remove (e) pendent spirnlers due to ceiling demo and replace with new upright sprinklers to create an open shell condition. ref pa 202201075565. maher n/a | $35,000 |
| Feb 11, 2022 | Completed final sign-off Mar 2022 | 45 Fremont St | H & M Fire Protection, Inc. | 20, 21, 22, 23 and 24th fl - remove (e) pendent ceiling sprinklers due to ceiling demo and replace with new upright sprinklers to create an open shell conditions. ref 202201115738Details
20, 21, 22, 23 and 24th fl - remove (e) pendent ceiling sprinklers due to ceiling demo and replace with new upright sprinklers to create an open shell conditions. ref 202201115738 | $135,000 |
| Feb 4, 2022 | Completed final sign-off Mar 2023 | 45 Fremont St | Richlen Construction | 34/f: demo nonstructural partitions, doors, glazing, millwork, ceiling assembly, light fixtures/electrical to warm shell condition. restroom accessibility, new lighting/finishes upgrades. new lighting/finishes in lobby & service elevator corridor extensionDetails
34/f: demo nonstructural partitions, doors, glazing, millwork, ceiling assembly, light fixtures/electrical to warm shell condition. restroom accessibility, new lighting/finishes upgrades. new lighting/finishes in lobby & service elevator corridor extension | $1,200,000 |
| Jan 12, 2022 | Completed final sign-off Aug 2023 | 45 Fremont St | Golden Gate Fire Protection Inc | 34/f: relocate 126 upright sprinlers. demo permit.Details
34/f: relocate 126 upright sprinlers. demo permit. | $63,000 |
| Jan 11, 2022 | Completed final sign-off Apr 2022 | 45 Fremont St | Truebeck Construction | floors 20-24: demo of (e) walls, celiings and mep elements for future t.i. ab-017 compliances. maher n/a. ref#2022 0211 7809Details
floors 20-24: demo of (e) walls, celiings and mep elements for future t.i. ab-017 compliances. maher n/a. ref#2022 0211 7809 | $150,000 |
| Jan 7, 2022 | Completed final sign-off Apr 2022 | 45 Fremont St | Truebeck Construction | 19th fl - demo of existing walls, ceilings and mep elements from the 19th fl for future ab-017 sprinkler permit 2022 0218 8273Details
19th fl - demo of existing walls, ceilings and mep elements from the 19th fl for future ab-017 sprinkler permit 2022 0218 8273 | $35,000 |
| Jan 4, 2022 | Completed final sign-off Apr 2022 | 45 Fremont St | Richlen Construction | 29/30/f: demo of non-strutcural partitions. restroom accessibility upgrade. new lighting and finish upgradesDetails
29/30/f: demo of non-strutcural partitions. restroom accessibility upgrade. new lighting and finish upgrades | $120,000 |
| Dec 13, 2021 | Completed final sign-off Dec 2021 | 45 Fremont St | Golden Gate Fire Protection Inc | 3rd fl - fire sprinklers; relocate 6 pendent sprinklers and relocate 6 uprights, 3rd fl, ste 300. ref pa 2021-0315-6560Details
3rd fl - fire sprinklers; relocate 6 pendent sprinklers and relocate 6 uprights, 3rd fl, ste 300. ref pa 2021-0315-6560 | $2,400 |
| Nov 19, 2021 | Completed final sign-off Aug 2024 | 45 Fremont St | Honeywell International, Inc | as built permit for approved pa 2021-0607-1811 (basement, 4th, 5th, 6th, 29th, 30th and 34th. the only change is to keep 1 control relay in the basement that ws supposed to be removed in the original scope. no new device has been added.Details
as built permit for approved pa 2021-0607-1811 (basement, 4th, 5th, 6th, 29th, 30th and 34th. the only change is to keep 1 control relay in the basement that ws supposed to be removed in the original scope. no new device has been added. | |
| Oct 28, 2021 | Completed final sign-off Jan 2022 | 45 Fremont St | Honeywell International, Inc | fire alarm addition on 3/f. add (2) speaker/strobes, relocate (1) speaker/strobe. ref t.i pa# 202103156560Details
fire alarm addition on 3/f. add (2) speaker/strobes, relocate (1) speaker/strobe. ref t.i pa# 202103156560 | $1,300 |
| Oct 27, 2021 | Completed final sign-off Mar 2022 | 45 Fremont St | Richlen Construction | mep permit ref pa 202103156560Details
mep permit ref pa 202103156560 | |
| Oct 14, 2021 | Completed final sign-off Jul 2024 | 45 Fremont St | Honeywell International, Inc | lobby & basement: as built permit for the approved fire alarm as buildt permit bpa# 201/0607/1808. no new devices added in this permit. the only change is to reflect the elevator recall floors designation in the sequence of operations.Details
lobby & basement: as built permit for the approved fire alarm as buildt permit bpa# 201/0607/1808. no new devices added in this permit. the only change is to reflect the elevator recall floors designation in the sequence of operations. | |
| Sep 16, 2021 | Completed final sign-off Jul 2024 | 45 Fremont St | Honeywell International, Inc | 11/f: as built permit for approved pa# 202107164552. no new devices were added. the only change is to keep the (e) door holders.Details
11/f: as built permit for approved pa# 202107164552. no new devices were added. the only change is to keep the (e) door holders. | |
| Jul 16, 2021 | Completed final sign-off Nov 2021 | 45 Fremont St | Honeywell International, Inc | 11th floor: ref app#202104067943. f/a addition. install 1 speaker strobe; demo 2 door holders.Details
11th floor: ref app#202104067943. f/a addition. install 1 speaker strobe; demo 2 door holders. | $650 |
| Jul 6, 2021 | Completed final sign-off Aug 2021 | 45 Fremont St | fire sprinker permit. relocate 2 and add 2 sprinklers on 11th fl ti 202104067943Details
fire sprinker permit. relocate 2 and add 2 sprinklers on 11th fl ti 202104067943 | $1,500 | |
| Jun 17, 2021 | Completed final sign-off Dec 2023 | 45 Fremont St | Richlen Construction | lobby. ref bpa#201904117722. ceiling bracing drawings & calculationsDetails
lobby. ref bpa#201904117722. ceiling bracing drawings & calculations | $500,000 |
| Jun 7, 2021 | Completed final sign-off Dec 2021 | 45 Fremont St | Honeywell International, Inc | fire alarm devices demo on basement, 4, 5, 6, 29, 30 & 34 floor due to the removal of heat pumps & pre-action system by others. f/a devices were no longer in use.Details
fire alarm devices demo on basement, 4, 5, 6, 29, 30 & 34 floor due to the removal of heat pumps & pre-action system by others. f/a devices were no longer in use. | |
| Jun 7, 2021 | Completed final sign-off Aug 2024 | 45 Fremont St | Honeywell International, Inc | as-built permit for the approved fire alarm permit 2020-1014-6497 change includes to update device addresses, device locations and deleted duplicate devices.Details
as-built permit for the approved fire alarm permit 2020-1014-6497 change includes to update device addresses, device locations and deleted duplicate devices. | |
| Apr 28, 2021 | Completed final sign-off Jun 2022 | 45 Fremont St | Richlen Construction | revision to app#201904117722 to add location of epo switch for previosly approved fire pit. update in sheet ie3.01Details
revision to app#201904117722 to add location of epo switch for previosly approved fire pit. update in sheet ie3.01 | $1,000 |
| Apr 9, 2021 | Completed final sign-off May 2021 | 45 Fremont St | Honeywell International, Inc | this is an as-built permit for f/a 2020-0824-2511. the additional scope of work is to delete (1) emergency door release in the passenger elevator lobby per inspector's comments. this device is no longer required. no new device has been added.Details
this is an as-built permit for f/a 2020-0824-2511. the additional scope of work is to delete (1) emergency door release in the passenger elevator lobby per inspector's comments. this device is no longer required. no new device has been added. | |
| Apr 8, 2021 | Completed final sign-off May 2021 | 45 Fremont St | Honeywell International, Inc | this is an as-built permit for approved f/a p/a 2020-1124-9652. the additional scope of work is to delete (1) emergency door release in the passenger elevator lobby per inspector's comments. this device is no longer required. no new devices has been added.Details
this is an as-built permit for approved f/a p/a 2020-1124-9652. the additional scope of work is to delete (1) emergency door release in the passenger elevator lobby per inspector's comments. this device is no longer required. no new devices has been added. | |
| Apr 6, 2021 | Completed final sign-off Dec 2021 | 45 Fremont St | Richlen Construction | 11/f: minor demo of walls, doors and lighting, addition of a conference room and changing of an existing conference room into a recession area, some new ceilings and lighting, new systems furniture, power and data connectivity and finish modifications.Details
11/f: minor demo of walls, doors and lighting, addition of a conference room and changing of an existing conference room into a recession area, some new ceilings and lighting, new systems furniture, power and data connectivity and finish modifications. | $105,000 |
| Mar 18, 2021 | Completed final sign-off May 2021 | 45 Fremont St | Honeywell International, Inc | fire alarm addition on 9/f: (1) control relay; (3) rib relay; (3) emergency door release to replace the previous tenants access card to the new tenants access card. new tenant will occupy the floor as is two-way comm. call station is existing (provided by others).Details
fire alarm addition on 9/f: (1) control relay; (3) rib relay; (3) emergency door release to replace the previous tenants access card to the new tenants access card. new tenant will occupy the floor as is two-way comm. call station is existing (provided by others). | $2,940 |
| Mar 15, 2021 | Completed final sign-off Mar 2022 | 45 Fremont St | Richlen Construction | 3/f t.i., suite 300: scope of work includes interior t.i. work includes: 1)partial demo of non structural interior partitions door/frames, millwork, ceilings, finishes. 2) construction of new interior partitions. fire submittals deffered. mep deffered.Details
3/f t.i., suite 300: scope of work includes interior t.i. work includes: 1)partial demo of non structural interior partitions door/frames, millwork, ceilings, finishes. 2) construction of new interior partitions. fire submittals deffered. mep deffered. | $160,000 |
| Jan 22, 2021 | Completed final sign-off Jul 2022 | 45 Fremont St | Richlen Construction | expansion of g/f lobby & load assumptions & basement repositioning project- structural calculations for facade systemDetails
expansion of g/f lobby & load assumptions & basement repositioning project- structural calculations for facade system | $1,000,000 |
| Dec 21, 2020 | Completed final sign-off Aug 2022 | 45 Fremont St | Honeywell International, Inc | basement f/a modification: add (4) control relays; (1) monitor module; (1) heat detector and (1) speaker/strobes. relocate & replace with new (1) smoke detector.Details
basement f/a modification: add (4) control relays; (1) monitor module; (1) heat detector and (1) speaker/strobes. relocate & replace with new (1) smoke detector. | $3,960 |
| Dec 21, 2020 | Completed final sign-off Mar 2022 | 45 Fremont St | Ayoob & Peery Plumbing Co Inc | basement: add thirty eight (38) and relocate seventeen (17) sprinklers. lobby: add one hundred and forty eight (148) sprinklers with mains, lines and fittings. ref # 2019-04-11-7722Details
basement: add thirty eight (38) and relocate seventeen (17) sprinklers. lobby: add one hundred and forty eight (148) sprinklers with mains, lines and fittings. ref # 2019-04-11-7722 | $101,500 |
| Dec 17, 2020 | Completed final sign-off Apr 2021 | 45 Fremont St | Principal Builders Inc. | for 7th and 8th floor exiting plan. please see pa # 2020-0221-5134 and pa #2020-0708-9840 for reference.Details
for 7th and 8th floor exiting plan. please see pa # 2020-0221-5134 and pa #2020-0708-9840 for reference. | $2,000 |
| Dec 3, 2020 | Completed final sign-off Feb 2021 | 45 Fremont St | Honeywell International, Inc | ref. mep 2020-0722-0703. 10/f f/a modification: remove (14) strobes; (25) strobes; arch 2020-0124-2766; (3) smoke detectors; (2) control modules; install (37) spkr/strbs; (2) spkrs; (13) smk det.; (2) duct detectors; (2) control relays; (9) rib relays; (3) emergency door release; (1) strb power...Details
ref. mep 2020-0722-0703. 10/f f/a modification: remove (14) strobes; (25) strobes; arch 2020-0124-2766; (3) smoke detectors; (2) control modules; install (37) spkr/strbs; (2) spkrs; (13) smk det.; (2) duct detectors; (2) control relays; (9) rib relays; (3) emergency door release; (1) strb power... | $32,160 |
| Nov 30, 2020 | Completed final sign-off Mar 2021 | 45 Fremont St | Honeywell International, Inc | f/a modification of floors b, 1, 2, 3, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 33. install (33) control relays for vav override.Details
f/a modification of floors b, 1, 2, 3, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 33. install (33) control relays for vav override. | $7,560 |
| Nov 25, 2020 | Completed final sign-off Apr 2022 | 45 Fremont St | Thomas Swan Sign Co Inc | install (2) illuminated single faced window signs: "45"Details
install (2) illuminated single faced window signs: "45" | $8,000 |
| Nov 25, 2020 | Completed final sign-off Apr 2022 | 45 Fremont St | Thomas Swan Sign Co Inc | install (4) illuminated single faced wall address signs: "45"Details
install (4) illuminated single faced wall address signs: "45" | $8,000 |
| Nov 24, 2020 | Completed final sign-off May 2021 | 45 Fremont St | Honeywell International, Inc | ref p/a mep 2020-0722-0713; 12/f f/a modification; install (28) spkr/strobes; (6) spkrs; (1) duct detector; (3) control relays; (6) pilot relays; (3) emergency door release; (1) smoke detector. "2-way call station to be provided by others."Details
ref p/a mep 2020-0722-0713; 12/f f/a modification; install (28) spkr/strobes; (6) spkrs; (1) duct detector; (3) control relays; (6) pilot relays; (3) emergency door release; (1) smoke detector. "2-way call station to be provided by others." | $25,620 |
| Nov 2, 2020 | Completed final sign-off Feb 2021 | 45 Fremont St | Honeywell International, Inc | ref. p/a 2020-0716-0323 r1. f/a modification on 13th floor; install (11) speaker/strobes; (15) smoke detectors; (4) duct detectors; (3) pilot relays; remove (25) speakers; (20) strobes; (3) smoke detectors; (1) control relay; (3) duct detectors.Details
ref. p/a 2020-0716-0323 r1. f/a modification on 13th floor; install (11) speaker/strobes; (15) smoke detectors; (4) duct detectors; (3) pilot relays; remove (25) speakers; (20) strobes; (3) smoke detectors; (1) control relay; (3) duct detectors. | $20,780 |
| Oct 24, 2020 | Completed final sign-off Feb 2021 | 45 Fremont St | Principal Builders Inc. | 7th flr - revision to bpa#202007089840. change of door hardware at doors 700 & 701 from approved permit. existing door and hardware at doors 700b and 700c are existing to remain. mech, fire alarm and sprinklers all under sep permits.Details
7th flr - revision to bpa#202007089840. change of door hardware at doors 700 & 701 from approved permit. existing door and hardware at doors 700b and 700c are existing to remain. mech, fire alarm and sprinklers all under sep permits. | |
| Oct 14, 2020 | Completed final sign-off Aug 2024 | 45 Fremont St | Honeywell International, Inc | fire alarm ti lobby & basement, ref 2019-0411-7722. install 67 spkr/str, 4 spkr, 20 smoke, 39 duct, 38 pilot relay, 13 control relay, 2 strobe pwr supply; remove 3 spkr/str, 12 spkr, 8 str, 2 smoke, 2 duct, 4 door holders, 2 cntrl relays, 1 strobe power supplyDetails
fire alarm ti lobby & basement, ref 2019-0411-7722. install 67 spkr/str, 4 spkr, 20 smoke, 39 duct, 38 pilot relay, 13 control relay, 2 strobe pwr supply; remove 3 spkr/str, 12 spkr, 8 str, 2 smoke, 2 duct, 4 door holders, 2 cntrl relays, 1 strobe power supply | $138,520 |
| Sep 29, 2020 | Completed final sign-off Dec 2020 | 45 Fremont St | Ayoob & Peery Plumbing Co Inc | 13th floor: add (8), relocate(12) & change out (102) sprinklers per t.i. ref# 2020/0716/0323.Details
13th floor: add (8), relocate(12) & change out (102) sprinklers per t.i. ref# 2020/0716/0323. | $29,000 |
| Sep 28, 2020 | Completed final sign-off Jun 2022 | 45 Fremont St | Thomas Swan Sign Co Inc | 16 evacuation plan maps. floors 3,10,11,12 for fire review only.Details
16 evacuation plan maps. floors 3,10,11,12 for fire review only. | $6,400 |
| Sep 28, 2020 | Completed final sign-off Feb 2021 | 45 Fremont St | Honeywell International, Inc | 3rd floor: f/a modification to install 29 spker/strobes, 8 spkrs, 1 smoke detector, 1 duct detector, 3 control relays, 4 pilot relays, replace 4 pull stations with new. remove 2 spkrs.ref app#201911258068 and mep 202006309395Details
3rd floor: f/a modification to install 29 spker/strobes, 8 spkrs, 1 smoke detector, 1 duct detector, 3 control relays, 4 pilot relays, replace 4 pull stations with new. remove 2 spkrs.ref app#201911258068 and mep 202006309395 | $29,160 |
| Sep 25, 2020 | Completed final sign-off Jun 2022 | 45 Fremont St | Thomas Swan Sign Co Inc | (7) evacuation maps. basement & level 1.Details
(7) evacuation maps. basement & level 1. | $2,800 |
| Sep 21, 2020 | Completed final sign-off Nov 2020 | 45 Fremont St | 7/f: upgrade of (e) f/s system due to t.i.: 41 relocated pendent f/s, 9 additional pendent f/s. 63 deleted pendent f/s. 14 relocated upright f/s, 87 additional upright f/s. t.i. pa202007089840. maher n/a.Details
7/f: upgrade of (e) f/s system due to t.i.: 41 relocated pendent f/s, 9 additional pendent f/s. 63 deleted pendent f/s. 14 relocated upright f/s, 87 additional upright f/s. t.i. pa202007089840. maher n/a. | $39,800 | |
| Sep 1, 2020 | Completed final sign-off Oct 2020 | 45 Fremont St | Honeywell International, Inc | fire alarm on 7th fl: install (45) speaker/strobes, (9) speakers, (1) smoke detector, replace (1) strobe, power supplyDetails
fire alarm on 7th fl: install (45) speaker/strobes, (9) speakers, (1) smoke detector, replace (1) strobe, power supply | $35,440 |
| Aug 24, 2020 | Completed final sign-off May 2021 | 45 Fremont St | Honeywell International, Inc | ref pa# 202001242765 (mep)/202007079765 (arch); fire alarm modification on 11th fl. install (38)speakers/strobes; (8)speakers; (15)smoke detectors; (7)pilot relays; (3)control relay; (3)emergency door release. replace (4) manual pull stations with new; replace (1) strobe power supply.Details
ref pa# 202001242765 (mep)/202007079765 (arch); fire alarm modification on 11th fl. install (38)speakers/strobes; (8)speakers; (15)smoke detectors; (7)pilot relays; (3)control relay; (3)emergency door release. replace (4) manual pull stations with new; replace (1) strobe power supply. | $43,520 |
| Aug 21, 2020 | Never finaled issued Aug 2020, no final | 45 Fremont St | Johnson Controls Fire | modify extg emergency communicator system provide install 1 call station and 1 terminal box on 7th floor.Details
modify extg emergency communicator system provide install 1 call station and 1 terminal box on 7th floor. | $1,500 |
| Aug 8, 2020 | Completed final sign-off Sep 2021 | 45 Fremont St | Principal Builders Inc. | 7th fl - deferred mep to approved pa #2020 0708 9840. demo ductwork, reconfigure ductwork, hvac, power & data, lighting & controls.Details
7th fl - deferred mep to approved pa #2020 0708 9840. demo ductwork, reconfigure ductwork, hvac, power & data, lighting & controls. | |
| Aug 8, 2020 | Completed final sign-off Aug 2023 | 45 Fremont St | Principal Builders Inc. | 8th fl - deferred mep to approved pa #2020 0221 5134. demo ductwork, reconfigure ductwork, hvac, power & data, lighting & controls.Details
8th fl - deferred mep to approved pa #2020 0221 5134. demo ductwork, reconfigure ductwork, hvac, power & data, lighting & controls. | |
| Aug 5, 2020 | Never finaled issued Aug 2020, no final | 45 Fremont St | street space | ||
| Jul 22, 2020 | Completed final sign-off Jun 2021 | 45 Fremont St | Richlen Construction | 12/f: modifications of quantity of fire smoke dampers, ref pa#201912300901 & 202001242696Details
12/f: modifications of quantity of fire smoke dampers, ref pa#201912300901 & 202001242696 | $5,000 |
| Jul 22, 2020 | Completed final sign-off Apr 2021 | 45 Fremont St | Richlen Construction | 10/f: modifications of quantity of fire smoke dampers, ref pa# 202001242766Details
10/f: modifications of quantity of fire smoke dampers, ref pa# 202001242766 | $10,000 |
| Jul 16, 2020 | Completed final sign-off Mar 2021 | 45 Fremont St | Richlen Construction | 13/f: demolition of non structural partitions, doors, glazing, millwork & electrical to warm shell condition. new restroom finishes & upgrades.Details
13/f: demolition of non structural partitions, doors, glazing, millwork & electrical to warm shell condition. new restroom finishes & upgrades. | $400,000 |
| Jul 14, 2020 | Completed final sign-off Oct 2020 | 45 Fremont St | Honeywell International, Inc | 8/f fire alarm: install 48 speaker/stroes, 6 speakers, 1 smoke detector, 3 duct detectors, 3 pilot relays, 1 control relay, replace 4 manual pull stations w/new, replace 1 strobe power supply. ref pa#202002215134Details
8/f fire alarm: install 48 speaker/stroes, 6 speakers, 1 smoke detector, 3 duct detectors, 3 pilot relays, 1 control relay, replace 4 manual pull stations w/new, replace 1 strobe power supply. ref pa#202002215134 | $43,500 |
| Jul 8, 2020 | Completed final sign-off Feb 2021 | 45 Fremont St | Principal Builders Inc. | 7/f -demo and construction of non-load bearing partitions, doors, millwork, glazing, ceiling, finishes, restrooms and stowers. mep, fire sprinklers and fire alarms under seperate permit.Details
7/f -demo and construction of non-load bearing partitions, doors, millwork, glazing, ceiling, finishes, restrooms and stowers. mep, fire sprinklers and fire alarms under seperate permit. | $1,498,500 |
| Jul 7, 2020 | Completed final sign-off Jun 2021 | 45 Fremont St | Richlen Construction | modify quantity of smoke dampers. ref 201911258073Details
modify quantity of smoke dampers. ref 201911258073 | $10,000 |
| Jun 30, 2020 | Completed final sign-off May 2021 | 45 Fremont St | Richlen Construction | 3rd floor: change in mep with quantity change of fire smoke dampers. ref app#201911258068Details
3rd floor: change in mep with quantity change of fire smoke dampers. ref app#201911258068 | $30,000 |
| May 22, 2020 | Completed final sign-off Oct 2020 | 45 Fremont St | 10/f: upgrade of (e) fire sprinklers system. relocate 26 pendent sprinklres, add 6 pendent spirnklers, remove 80 pendent sprinklres, relocate 26 upright sprpinklers, add 89 upright sprinklers. ref t.i. 202001242766.maher n/a.Details
10/f: upgrade of (e) fire sprinklers system. relocate 26 pendent sprinklres, add 6 pendent spirnklers, remove 80 pendent sprinklres, relocate 26 upright sprpinklers, add 89 upright sprinklers. ref t.i. 202001242766.maher n/a. | $38,900 | |
| May 22, 2020 | Completed final sign-off Nov 2020 | 45 Fremont St | 11/f: upgrade of (e) fire sprinklers system. relocate 24 pendent sprinklres, add 13 pendent spirnklers, remove 59 pendent sprinklres, relocate 54 upright sprpinklers, add 74 upright sprinklers. ref t.i. pa202001242765 & 201911258073. maher n/a.Details
11/f: upgrade of (e) fire sprinklers system. relocate 24 pendent sprinklres, add 13 pendent spirnklers, remove 59 pendent sprinklres, relocate 54 upright sprpinklers, add 74 upright sprinklers. ref t.i. pa202001242765 & 201911258073. maher n/a. | $41,700 | |
| May 22, 2020 | Completed final sign-off Oct 2020 | 45 Fremont St | 8/f: upgrade of (e) fire sprinkler system. 42 relocated pendent spirnklers, 20 added pendent sprinklers, 49 delated pendent sprinklers. 19 relocate upright sprinklers. 84 added upright sprinklers.Details
8/f: upgrade of (e) fire sprinkler system. 42 relocated pendent spirnklers, 20 added pendent sprinklers, 49 delated pendent sprinklers. 19 relocate upright sprinklers. 84 added upright sprinklers. | $43,400 | |
| Mar 11, 2020 | Completed final sign-off Aug 2020 | 45 Fremont St | 3rd fl: ti upgrade of the existing fire sprinkler system: 1 relocate pendent sprinklers, 42 additional pendent sprinklers, 29 relocate uprights sprinklers, 2 additional upright sprinklers, 25 deletec upright sprinklers. ref pa #201911258068Details
3rd fl: ti upgrade of the existing fire sprinkler system: 1 relocate pendent sprinklers, 42 additional pendent sprinklers, 29 relocate uprights sprinklers, 2 additional upright sprinklers, 25 deletec upright sprinklers. ref pa #201911258068 | $16,800 | |
| Mar 11, 2020 | Completed final sign-off Oct 2020 | 45 Fremont St | 12th fl: ti upgrade the existing fire sprinkler system: 1 relocated pendent sprinklers, 44 additional pendent sprinklers, 10 relocate upright sprinklers, 20 additional upright sprinklers, 24 deleted upright sprinklers. ref pa #201912300901Details
12th fl: ti upgrade the existing fire sprinkler system: 1 relocated pendent sprinklers, 44 additional pendent sprinklers, 10 relocate upright sprinklers, 20 additional upright sprinklers, 24 deleted upright sprinklers. ref pa #201912300901 | $21,400 | |
| Feb 21, 2020 | Completed final sign-off Nov 2020 | 45 Fremont St | Principal Builders Inc. | tenant improvement on 8th fl to demo and construct partitions, doors, millwork, glazing, ceilings, and finishes. mep, life safety as fire alarms on separate permit. breakroom/pantry non food service or storageDetails
tenant improvement on 8th fl to demo and construct partitions, doors, millwork, glazing, ceilings, and finishes. mep, life safety as fire alarms on separate permit. breakroom/pantry non food service or storage | $1,498,500 |
| Jan 24, 2020 | Completed final sign-off Jun 2021 | 45 Fremont St | Richlen Construction | mep deferred submittal of pa #2019-1230-0901Details
mep deferred submittal of pa #2019-1230-0901 | $600,000 |
| Jan 24, 2020 | Completed final sign-off May 2021 | 45 Fremont St | Richlen Construction | 10 th floor: revision to app#201911258072. includes layout changes and meps.Details
10 th floor: revision to app#201911258072. includes layout changes and meps. | |
| Jan 24, 2020 | Completed final sign-off Jun 2021 | 45 Fremont St | Richlen Construction | 11th floor: revision to app#201911258073 includes layout changes and meps.Details
11th floor: revision to app#201911258073 includes layout changes and meps. | |
| Jan 22, 2020 | Completed final sign-off Aug 2023 | 45 Fremont St | Principal Builders Inc. | 8th floor: interior demo of partitions, millwork, finishes, doors. under ab017. ada will be shown in future t.i.Details
8th floor: interior demo of partitions, millwork, finishes, doors. under ab017. ada will be shown in future t.i. | $129,500 |
| Jan 13, 2020 | Never finaled issued Jan 2020, no final | 45 Fremont St | street space | ||
| Dec 30, 2019 | Completed final sign-off Jun 2021 | 45 Fremont St | Richlen Construction | full floor ti new non load bearing partitions, floor finishes, furningh ceiling lighting work. mep deferredDetails
full floor ti new non load bearing partitions, floor finishes, furningh ceiling lighting work. mep deferred | $500,000 |
| Dec 17, 2019 | Expired or cancelled withdrawn Feb 2024 | 45 Fremont St | Sc Builders, Inc | 24th fl-change of occupancy from b to a-2, place of assembly demolition of no structural, partitons, ceilings & finishes, addition of horizontal exit, construction of non-structural partitions, doors/frames, hardware, millwork, drywall & acoustic ceiling, mechanical, electrical, plumbing n/a maher.Details
24th fl-change of occupancy from b to a-2, place of assembly demolition of no structural, partitons, ceilings & finishes, addition of horizontal exit, construction of non-structural partitions, doors/frames, hardware, millwork, drywall & acoustic ceiling, mechanical, electrical, plumbing n/a maher. | $3,500,000 |
| Nov 25, 2019 | Completed final sign-off May 2021 | 45 Fremont St | Richlen Construction | 10th flr. interior demo & ti including mepDetails
10th flr. interior demo & ti including mep | $2,500,000 |
| Nov 25, 2019 | Completed final sign-off Jun 2021 | 45 Fremont St | Richlen Construction | interior demo & ti including mepDetails
interior demo & ti including mep | $2,500,000 |
| Nov 25, 2019 | Completed final sign-off May 2021 | 45 Fremont St | Richlen Construction | 3rd fl - interior demo & ti including mepDetails
3rd fl - interior demo & ti including mep | $2,000,000 |
| Nov 19, 2019 | Completed final sign-off Apr 2025 | 45 Fremont St | Sc Builders, Inc | evacuation signage for floor 17Details
evacuation signage for floor 17 | $1,600 |
| Nov 12, 2019 | Completed final sign-off Feb 2020 | 45 Fremont St | Honeywell International, Inc | 12th flr f.a modification: install (11) sprinklers/strobes, (14) smoke detectors, (2) duct detectors, (7) pilot relays, (4) door holders, (1) strobe power supply, (4) pull stations. remove (28) spkrs/strobes and (19) strobes. 2-way communication call station by othersDetails
12th flr f.a modification: install (11) sprinklers/strobes, (14) smoke detectors, (2) duct detectors, (7) pilot relays, (4) door holders, (1) strobe power supply, (4) pull stations. remove (28) spkrs/strobes and (19) strobes. 2-way communication call station by others | $23,700 |
| Nov 1, 2019 | Never finaled issued Nov 2019, no final | 45 Fremont St | street space/mta meters | ||
| Oct 15, 2019 | Expired or cancelled withdrawn Feb 2024 | 45 Fremont St | Sc Builders, Inc | 27th floor:demolition of non-structural partitions, ceilings & finishes. construction of non structural partitions, ceilings, door frames/hardware, millwork, drywallk, acoustic ceiling grid, finshes, mechanical, electrical & plmg. fire sprinkler and life safty under defered submittal. n/a for maherDetails
27th floor:demolition of non-structural partitions, ceilings & finishes. construction of non structural partitions, ceilings, door frames/hardware, millwork, drywallk, acoustic ceiling grid, finshes, mechanical, electrical & plmg. fire sprinkler and life safty under defered submittal. n/a for maher | $3,500,000 |
| Oct 7, 2019 | Completed final sign-off Oct 2019 | 45 Fremont St | Golden Gate Fire Protection Inc | 12th flr - fire sprinklers relocate 13 pendent sprinklers and 126 uprights ref 201909050788Details
12th flr - fire sprinklers relocate 13 pendent sprinklers and 126 uprights ref 201909050788 | $71,585 |
| Oct 3, 2019 | Completed final sign-off Nov 2019 | 45 Fremont St | Johnson Controls Fire | install 1 call station and 1 terminal box 17th fl in 2way emergency systemDetails
install 1 call station and 1 terminal box 17th fl in 2way emergency system | $5,281 |
| Sep 12, 2019 | Never finaled issued Oct 2019, no final | 45 Fremont St | Sc Builders, Inc | demo of non structural partitions/walls ceilings, doors, finishes, lights and millwork ab.017 ref sprinklers 201909121399Details
demo of non structural partitions/walls ceilings, doors, finishes, lights and millwork ab.017 ref sprinklers 201909121399 | $199,000 |
| Sep 12, 2019 | Never finaled issued Sep 2019, no final | 45 Fremont St | Pribuss Engineering Inc | 23rd,24th, 26th, & 27th floors: fire sprinkler: total added=3, total sprinkler plugged=29, total extg relocate and changed to uprights sprinkler=505 . n/a for mahers.Details
23rd,24th, 26th, & 27th floors: fire sprinkler: total added=3, total sprinkler plugged=29, total extg relocate and changed to uprights sprinkler=505 . n/a for mahers. | $261,112 |
| Sep 9, 2019 | Expired or cancelled withdrawn Feb 2024 | 45 Fremont St | Sc Builders, Inc | 26rd floor: ti: includes demo of non structural partitions, ceilings+ finishe. construct non- structural partitions, door/rames etc. meps included (sprinkler and life safety under separate permit).Details
26rd floor: ti: includes demo of non structural partitions, ceilings+ finishe. construct non- structural partitions, door/rames etc. meps included (sprinkler and life safety under separate permit). | $3,500,000 |
| Sep 9, 2019 | Expired or cancelled withdrawn Feb 2024 | 45 Fremont St | Sc Builders, Inc | 23rd floor: ti: includes demo of non structural partitions, ceilings+ finishe. construct non- structural partitions, door/rames etc. meps included (sprinkler and life safety under separate permit).Details
23rd floor: ti: includes demo of non structural partitions, ceilings+ finishe. construct non- structural partitions, door/rames etc. meps included (sprinkler and life safety under separate permit). | $3,500,000 |
| Sep 6, 2019 | Completed final sign-off Nov 2019 | 45 Fremont St | Honeywell International, Inc | 17th flr - fa install 51 spkr/strobes, 10 spkrs, 1 smk det, 2 emergency door release, 3 control relays, 6 pilot relays, 4 door holders, 1 relocate smk det. remove 17 spkr/strobes, 1 smk det. ref 201908068019Details
17th flr - fa install 51 spkr/strobes, 10 spkrs, 1 smk det, 2 emergency door release, 3 control relays, 6 pilot relays, 4 door holders, 1 relocate smk det. remove 17 spkr/strobes, 1 smk det. ref 201908068019 | $33,000 |
| Sep 5, 2019 | Completed final sign-off Jan 2020 | 45 Fremont St | Richlen Construction | 12th fl: demo of non structural partitions, doors, glazing, millwork, ceiling assembly, light fixtures and ele of 12th flr. to warm shell condition 12th flr restroom barrier and finishes upgrades. new light fixture 12th flr to remain unoccupied ab-017Details
12th fl: demo of non structural partitions, doors, glazing, millwork, ceiling assembly, light fixtures and ele of 12th flr. to warm shell condition 12th flr restroom barrier and finishes upgrades. new light fixture 12th flr to remain unoccupied ab-017 | $600,000 |
| Aug 23, 2019 | Completed final sign-off Oct 2019 | 45 Fremont St | ti/upgrade of fire sprinkler system, 31 relocate pendent, 22 add upright, 2 deleted upright, 22 add pendent, 21 relocate upright ref 201908068019Details
ti/upgrade of fire sprinkler system, 31 relocate pendent, 22 add upright, 2 deleted upright, 22 add pendent, 21 relocate upright ref 201908068019 | $23,300 | |
| Aug 6, 2019 | Completed final sign-off Jan 2020 | 45 Fremont St | Sc Builders, Inc | 17th fl - revision to pa 2019-0702-4872 keep existing elevator lobby light fixtures, new lighting design for core lounge. reduced overall lighting in hallway, converted phone room to storage.Details
17th fl - revision to pa 2019-0702-4872 keep existing elevator lobby light fixtures, new lighting design for core lounge. reduced overall lighting in hallway, converted phone room to storage. | |
| Jul 23, 2019 | Completed final sign-off Aug 2019 | 45 Fremont St | Honeywell International, Inc | 31st floor- ref pa 2019-0308-4790: fa modification on 31st floor. install 1 speaker strob.Details
31st floor- ref pa 2019-0308-4790: fa modification on 31st floor. install 1 speaker strob. | $640 |
| Jul 18, 2019 | Completed final sign-off Sep 2019 | 45 Fremont St | Johnson Controls Fire | installation of 2 call stations and 1 terminal box on 31st fl. and 2 call stations and 1 termnal box on 32nd fl. in 2-way emergency system n/a maherDetails
installation of 2 call stations and 1 terminal box on 31st fl. and 2 call stations and 1 termnal box on 32nd fl. in 2-way emergency system n/a maher | $10,561 |
| Jul 2, 2019 | Completed final sign-off Jul 2020 | 45 Fremont St | Sc Builders, Inc | demo of non structural partitions, ceilings and finishes construction of non structural partitions, doors hardware, and finishes, mep included n/a meharDetails
demo of non structural partitions, ceilings and finishes construction of non structural partitions, doors hardware, and finishes, mep included n/a mehar | $3,100,000 |
| Jun 20, 2019 | Expired or cancelled withdrawn Feb 2024 | 45 Fremont St | Sc Builders, Inc | 32nd fl - addition of (n) gender neutralrestrooms mep includedDetails
32nd fl - addition of (n) gender neutralrestrooms mep included | $23,400 |
| Jun 12, 2019 | Completed final sign-off Jul 2022 | 45 Fremont St | Sc Builders, Inc | 31st fl - revision to 2019-0308-4790 addition of (n) gender neutral restrooms. meps includedDetails
31st fl - revision to 2019-0308-4790 addition of (n) gender neutral restrooms. meps included | |
| May 17, 2019 | Completed final sign-off Jun 2019 | 45 Fremont St | Anderson, Rowe & Buckley, Inc. | 3rd flr fire sprinklers only. relocate 30 pendents, relocate 45 uprights for office t.i. ref pa 201903276355Details
3rd flr fire sprinklers only. relocate 30 pendents, relocate 45 uprights for office t.i. ref pa 201903276355 | $37,500 |
| May 13, 2019 | Completed final sign-off Jul 2019 | 45 Fremont St | Honeywell International, Inc | 3rd fl - f/a modification - install 25 speaker/strobes; 4 duct detectors; 4 rib relays; 1 control relay; replace1 strobe power suupply and 6 smoke detectors w/new and 4 pull stations w/new and 1 monitor module; remove all old speaker/strobes in the tenant space. ref pa 201903276355Details
3rd fl - f/a modification - install 25 speaker/strobes; 4 duct detectors; 4 rib relays; 1 control relay; replace1 strobe power suupply and 6 smoke detectors w/new and 4 pull stations w/new and 1 monitor module; remove all old speaker/strobes in the tenant space. ref pa 201903276355 | $28,440 |
| Apr 18, 2019 | Never finaled issued Apr 2019, no final | 45 Fremont St | Matrix Hg Inc | replace (e) 3-ton water source heat pump with new n/a maherDetails
replace (e) 3-ton water source heat pump with new n/a maher | $29,684 |
| Apr 11, 2019 | Completed final sign-off Jun 2022 | 45 Fremont St | Richlen Construction | selective demo within the (e) bsmt & ground fl lobby. demo non-egress communication stair (level 2 - bsmt) plus slab infill @ level 1 & 2 (where removed). expansion of ground fl lobby include new exterior landscape in southern plaza. new store front entry, bicycle entry & basement bicycle amenity.Details
selective demo within the (e) bsmt & ground fl lobby. demo non-egress communication stair (level 2 - bsmt) plus slab infill @ level 1 & 2 (where removed). expansion of ground fl lobby include new exterior landscape in southern plaza. new store front entry, bicycle entry & basement bicycle amenity. | $16,500,000 |
| Apr 8, 2019 | Completed final sign-off May 2019 | 45 Fremont St | Honeywell International, Inc | 3rd flr fire alarm modification. demo unused 4 duct detectors. all other (e) f/a field devices shall remain.Details
3rd flr fire alarm modification. demo unused 4 duct detectors. all other (e) f/a field devices shall remain. | $500 |
| Mar 27, 2019 | Completed final sign-off Sep 2019 | 45 Fremont St | Richlen Construction | ti 3rd flr - demo (e) partitions/doors ceiling & light fixtures. new construction - partitions, doors, ceiling & light fixtures, millwork. plum, ele restreoom upgradeDetails
ti 3rd flr - demo (e) partitions/doors ceiling & light fixtures. new construction - partitions, doors, ceiling & light fixtures, millwork. plum, ele restreoom upgrade | $890,000 |
| Mar 8, 2019 | Completed final sign-off Jul 2022 | 45 Fremont St | Sc Builders, Inc | 31st floor: no new partitions or structural work. new finishes, millwork, office bar, mechanical, electrical and plumbing. fire, life safty, sprinkler to be submitted seperatly.Details
31st floor: no new partitions or structural work. new finishes, millwork, office bar, mechanical, electrical and plumbing. fire, life safty, sprinkler to be submitted seperatly. | $1,000,000 |
| Dec 4, 2018 | Expired or cancelled cancelled Jan 2026 | 45 Fremont St | flrs 17, 31 & 32; demo of non-bearing interior walls, ceiling, lighting and flooring, space will remain in shell conditon after demo per ab-017, new construction under sep pertmit, occupancy remains type b. demo of mep under sep permit, (e) fire alarm and smoke system modifications under sep permitDetails
flrs 17, 31 & 32; demo of non-bearing interior walls, ceiling, lighting and flooring, space will remain in shell conditon after demo per ab-017, new construction under sep pertmit, occupancy remains type b. demo of mep under sep permit, (e) fire alarm and smoke system modifications under sep permit | $365,621 | |
| Sep 28, 2018 | Completed final sign-off Oct 2018 | 45 Fremont St | Honeywell International, Inc | basement - remove & de program from the f/a system database (e) adressable field devices that are not in ised inside the old server room. (e) sprks.strobes sha;; remain. remove 10 smk det, 2 duct det 10 monitor modules * 7 relays maher naDetails
basement - remove & de program from the f/a system database (e) adressable field devices that are not in ised inside the old server room. (e) sprks.strobes sha;; remain. remove 10 smk det, 2 duct det 10 monitor modules * 7 relays maher na | |
| Jul 17, 2018 | Expired or cancelled cancelled Jan 2026 | 45 Fremont St | minor tenant improvements including addition of several doors and reconfiguration of (20 offices into a new small conference room)Details
minor tenant improvements including addition of several doors and reconfiguration of (20 offices into a new small conference room) | $150,000 | |
| May 15, 2018 | Completed final sign-off Oct 2018 | 45 Fremont St | Ayoob & Peery Plumbing Co Inc | 17th fl, ti - add 34 and relocate 104 fire sprinklers to conform with the new wall/ceiling of the ti ref pa 2018-0406-5685Details
17th fl, ti - add 34 and relocate 104 fire sprinklers to conform with the new wall/ceiling of the ti ref pa 2018-0406-5685 | $41,250 |
| May 10, 2018 | Completed final sign-off Jun 2018 | 45 Fremont St | Anderson, Rowe & Buckley, Inc. | existing fire sprinkler systems ti 437 relocated, 106 add sprinklers. ref pa 14th & 16th fl - 2018-0123-9304 and 15th fl - 2018-0123-9305Details
existing fire sprinkler systems ti 437 relocated, 106 add sprinklers. ref pa 14th & 16th fl - 2018-0123-9304 and 15th fl - 2018-0123-9305 | $140,000 |
| May 1, 2018 | Completed final sign-off Jun 2019 | 45 Fremont St | Principal Builders Inc. | revision to pa #201801239305, to include structural details for sliding glass door on 15th fl.Details
revision to pa #201801239305, to include structural details for sliding glass door on 15th fl. | |
| Apr 27, 2018 | Completed final sign-off Jun 2018 | 45 Fremont St | Honeywell International, Inc | 15th - ref 201802070693 fa modification: install 41 spk/strbs, 2 speaker, 2 smk det, 1 upg strobe power supply to 100amps, replace 3 pull stations w/new, 3 smk det w/new. add 5 duct det, 7 r113 relays, 8 control relays, remove all old strobes & speakers in tenant space as shown maher naDetails
15th - ref 201802070693 fa modification: install 41 spk/strbs, 2 speaker, 2 smk det, 1 upg strobe power supply to 100amps, replace 3 pull stations w/new, 3 smk det w/new. add 5 duct det, 7 r113 relays, 8 control relays, remove all old strobes & speakers in tenant space as shown maher na | $36,226 |
| Apr 27, 2018 | Completed final sign-off Jun 2018 | 45 Fremont St | Honeywell International, Inc | 14th & 16th - ref 201802070695 - fa mod: add 2 duct det, 1 smk det, 8 ctrl relay, 2 emer door release, 4 rib relays, 38 spkr/strbs, 2 spker. 1 strb power supply, replace 3 pull stan & 8 smk det w/new. 16th - replace 3 pull station, 4 smk det w/new, add 1 smk det, 1 duct det. 9 cont relays, 8 ribDetails
14th & 16th - ref 201802070695 - fa mod: add 2 duct det, 1 smk det, 8 ctrl relay, 2 emer door release, 4 rib relays, 38 spkr/strbs, 2 spker. 1 strb power supply, replace 3 pull stan & 8 smk det w/new. 16th - replace 3 pull station, 4 smk det w/new, add 1 smk det, 1 duct det. 9 cont relays, 8 rib | $66,068 |
| Apr 27, 2018 | Never finaled issued Apr 2018, no final | 45 Fremont St | Johnson Controls Fire | ref pa 2018-0207-0695 add a 2 way communication system 3 call stations, 2 terminal cabinets; n/a maherDetails
ref pa 2018-0207-0695 add a 2 way communication system 3 call stations, 2 terminal cabinets; n/a maher | $14,000 |
| Apr 27, 2018 | Never finaled issued Apr 2018, no final | 45 Fremont St | Johnson Controls Fire | ref pa 2018-0207-0693 add a 2 way communication system (1) call station, (1) terminal cabinet; n/a maherDetails
ref pa 2018-0207-0693 add a 2 way communication system (1) call station, (1) terminal cabinet; n/a maher | $7,000 |
| Apr 20, 2018 | Completed final sign-off Aug 2018 | 45 Fremont St | Honeywell International, Inc | fire alarm modification on 17th fl. add 19 spkr/strobes, 1 spkr, 1 strobe power supply, 1 smoke detector, replace 3 pull station with new replace 8 smoke det with new, remove 1 emergency door rel, 5 duct detectors, 2 smoke det, 2 monitor modulesDetails
fire alarm modification on 17th fl. add 19 spkr/strobes, 1 spkr, 1 strobe power supply, 1 smoke detector, replace 3 pull station with new replace 8 smoke det with new, remove 1 emergency door rel, 5 duct detectors, 2 smoke det, 2 monitor modules | $3,600 |
| Apr 6, 2018 | Completed final sign-off Oct 2018 | 45 Fremont St | Richlen Construction | 17/f -demo of (e) offices, break room, ceiling & light fixtures. new construction of including new partitions, doors, ceiling & light fixtures, millwork, plumbing and electrical and restroom upgradesDetails
17/f -demo of (e) offices, break room, ceiling & light fixtures. new construction of including new partitions, doors, ceiling & light fixtures, millwork, plumbing and electrical and restroom upgrades | $810,000 |
| Feb 8, 2018 | Completed final sign-off Feb 2018 | 45 Fremont St | Johnson Controls Fire | 9th flr - provide * install new two way communication maher naDetails
9th flr - provide * install new two way communication maher na | $9,500 |
| Feb 7, 2018 | Completed final sign-off Aug 2018 | 45 Fremont St | Principal Builders Inc. | mechanical and electrical to demo and install new systems and power. ref pa 2018-0123-9304Details
mechanical and electrical to demo and install new systems and power. ref pa 2018-0123-9304 | $1,101,540 |
| Feb 7, 2018 | Completed final sign-off Aug 2018 | 45 Fremont St | Principal Builders Inc. | mechanical and electrical to demo and install new systems and power. ref pa 2018-0123-9305Details
mechanical and electrical to demo and install new systems and power. ref pa 2018-0123-9305 | $550,770 |
| Jan 23, 2018 | Completed final sign-off Jun 2019 | 45 Fremont St | Principal Builders Inc. | 15th floor: t.i. to demo and construct non-structural partitions, doors, millwork, ceilings, and finishes. mep and life safety & sprinklers on separate permit. n/a for maherDetails
15th floor: t.i. to demo and construct non-structural partitions, doors, millwork, ceilings, and finishes. mep and life safety & sprinklers on separate permit. n/a for maher | $1,432,000 |
| Jan 23, 2018 | Completed final sign-off Aug 2018 | 45 Fremont St | Principal Builders Inc. | 14th and 16th floors: t.i. to demo and construct non-structural partitions, doors, millwork, ceilings, and finishes. mep and life safety & sprinklers on separate permit. n/a for maherDetails
14th and 16th floors: t.i. to demo and construct non-structural partitions, doors, millwork, ceilings, and finishes. mep and life safety & sprinklers on separate permit. n/a for maher | $1,309,000 |
| Jan 16, 2018 | Completed final sign-off Jun 2018 | 45 Fremont St | Richlen Construction | restroom barrier removal work, new door signage, stall partitions finishes, countertops, light fixtures existing accessible plumbing to remain. existing gyp bd ceiling and devices to remain. existing power outlets to remain. maher n/aDetails
restroom barrier removal work, new door signage, stall partitions finishes, countertops, light fixtures existing accessible plumbing to remain. existing gyp bd ceiling and devices to remain. existing power outlets to remain. maher n/a | $85,000 |
| Jan 16, 2018 | Completed final sign-off Jun 2018 | 45 Fremont St | Richlen Construction | restroom barrier removal work: new door signage stall partitions finishes, countertops and light fixtures. e accessible plumbing fixtures to remain. e gyp board ceiling and devices to remain. e power outlets to remain. new stall partitions. mep sep permit. maher n/aDetails
restroom barrier removal work: new door signage stall partitions finishes, countertops and light fixtures. e accessible plumbing fixtures to remain. e gyp board ceiling and devices to remain. e power outlets to remain. new stall partitions. mep sep permit. maher n/a | $85,000 |
| Jan 16, 2018 | Completed final sign-off Jul 2018 | 45 Fremont St | Richlen Construction | restroom barrier removal work. new floor signage, finishes, countertops, sinks, faucets, light fixtures, stall partitions, duplex outlets/recept. e gyp bd ceiling devices to remain, e outlets to remain. relocate water closets in hc stall maher not reqDetails
restroom barrier removal work. new floor signage, finishes, countertops, sinks, faucets, light fixtures, stall partitions, duplex outlets/recept. e gyp bd ceiling devices to remain, e outlets to remain. relocate water closets in hc stall maher not req | $100,000 |
| Jan 12, 2018 | Completed final sign-off Feb 2018 | 45 Fremont St | Honeywell International, Inc | 9th floor: f.a. modification to install new 5 speakers/strobe, 3 speakers. remove 3 speaker/strobes. relocate 1 wall strobes. n/a for maher. ref app#201710110875Details
9th floor: f.a. modification to install new 5 speakers/strobe, 3 speakers. remove 3 speaker/strobes. relocate 1 wall strobes. n/a for maher. ref app#201710110875 | $4,928 |
| Jan 8, 2018 | Completed final sign-off Aug 2023 | 45 Fremont St | 9th - fire sprinkler, relocate 8 and add 2 pendents. ti rsf pa 201710110875 maher naDetails
9th - fire sprinkler, relocate 8 and add 2 pendents. ti rsf pa 201710110875 maher na | $3,000 | |
| Dec 22, 2017 | Completed final sign-off Mar 2018 | 45 Fremont St | Honeywell International, Inc | fire alarm modification on the 15th and 16th fl. demo 1 smoke det, 1 duct detector 15th fl, 1 smoke detector, 1 duct detector 16th fl idf, existing fa devices in area not in scope shall remain, maher not reqDetails
fire alarm modification on the 15th and 16th fl. demo 1 smoke det, 1 duct detector 15th fl, 1 smoke detector, 1 duct detector 16th fl idf, existing fa devices in area not in scope shall remain, maher not req | $500 |
| Dec 19, 2017 | Expired or cancelled expired Mar 2025 | 45 Fremont St | Skyline Construction | 18th fl: replacement of double door at existing elevator vestibule w/glass doors. maher naDetails
18th fl: replacement of double door at existing elevator vestibule w/glass doors. maher na | $1,500 |
| Oct 25, 2017 | Expired or cancelled cancelled Aug 2023 | 45 Fremont St | Johnson Controls Fire | provide & install a two way communication system. ref pa 2017-0421-4533Details
provide & install a two way communication system. ref pa 2017-0421-4533 | $23,190 |
| Oct 25, 2017 | Expired or cancelled cancelled Aug 2023 | 45 Fremont St | Johnson Controls Fire | provide & install a two way communication for the 33rd floor as shown. new devices are additions to (e) system. ref pa 2017-0214-9324Details
provide & install a two way communication for the 33rd floor as shown. new devices are additions to (e) system. ref pa 2017-0214-9324 | $6,700 |
| Oct 25, 2017 | Expired or cancelled cancelled Aug 2023 | 45 Fremont St | Johnson Controls Fire | provide & install a two way communication system for the 2nd floor. ref pa 2017-0421-4519Details
provide & install a two way communication system for the 2nd floor. ref pa 2017-0421-4519 | $6,700 |
| Oct 11, 2017 | Completed final sign-off Feb 2018 | 45 Fremont St | Rudolph Commercial Interiors Inc, Rci | remodel existing offices on the 9th fl remodel large conference room, add 1 huddle rm, 3 focus rooms, 2 team rooms, 1 managed pring room. new finishes and new led light. new mech, elec for new spaces no new toilets maher not reqDetails
remodel existing offices on the 9th fl remodel large conference room, add 1 huddle rm, 3 focus rooms, 2 team rooms, 1 managed pring room. new finishes and new led light. new mech, elec for new spaces no new toilets maher not req | $125,000 |
| Aug 28, 2017 | Completed final sign-off Oct 2017 | 45 Fremont St | Honeywell International, Inc | 2nd fl fa ti: install (15) smoke detec.; (29) speaker/strobes; (1) strobe; (4) speakers; (1) strobe power supply; (12) duct detec.; (14) rib relay; (4) control relays; (2) palm push button emerg. door release; remove (25) speaker & (13) strobes; replace (9) smoke detectors. ref ti #201704214519Details
2nd fl fa ti: install (15) smoke detec.; (29) speaker/strobes; (1) strobe; (4) speakers; (1) strobe power supply; (12) duct detec.; (14) rib relay; (4) control relays; (2) palm push button emerg. door release; remove (25) speaker & (13) strobes; replace (9) smoke detectors. ref ti #201704214519 | $41,634 |
| Aug 3, 2017 | Completed final sign-off Jun 2018 | 45 Fremont St | Richlen Construction | 2nd fl structural support for interior folding wall in ti. ref pa 2017-0421-4519 n/a for maher.Details
2nd fl structural support for interior folding wall in ti. ref pa 2017-0421-4519 n/a for maher. | $6,000 |
| Aug 3, 2017 | Completed final sign-off Sep 2017 | 45 Fremont St | Pribuss Engineering Inc | fire sprinkler ti under pa 2017-0421-4519. relocate 50, add 5Details
fire sprinkler ti under pa 2017-0421-4519. relocate 50, add 5 | $31,557 |
| May 12, 2017 | Completed final sign-off Aug 2017 | 45 Fremont St | Honeywell International, Inc | 19th floor - fire alarm modification to add (2) monitor modules ot monitor the new two-way communication system (provided by others) ref two-way communication approved pa #201704214533.Details
19th floor - fire alarm modification to add (2) monitor modules ot monitor the new two-way communication system (provided by others) ref two-way communication approved pa #201704214533. | $1,028 |
| Apr 26, 2017 | Completed final sign-off Apr 2025 | 45 Fremont St | Sotello Graphic Associates | 33rd floor - affix 4 evacuation maps. n/a maher ordinanceDetails
33rd floor - affix 4 evacuation maps. n/a maher ordinance | $1,500 |
| Apr 24, 2017 | Never finaled issued Apr 2017, no final | 45 Fremont St | Honeywell International, Inc | renew of fire alarm pa# 201603172306. to obtain final inspection.Details
renew of fire alarm pa# 201603172306. to obtain final inspection. | |
| Apr 21, 2017 | Never finaled issued May 2017, no final | 45 Fremont St | Johnson Controls Fire | 8/f- 2 way communication system for t.i. including master station at ground floor fcc room. ref. to t.i. pa#201601157201. n/a ordinance #155-13Details
8/f- 2 way communication system for t.i. including master station at ground floor fcc room. ref. to t.i. pa#201601157201. n/a ordinance #155-13 | $20,000 |
| Apr 21, 2017 | Completed final sign-off Jun 2018 | 45 Fremont St | Richlen Construction | partial interior t.i. 2nd floor: partial interior t.i. including non-bearing partitions, millwork, ceilings, lighting power hvac and finishes. n/a for maherDetails
partial interior t.i. 2nd floor: partial interior t.i. including non-bearing partitions, millwork, ceilings, lighting power hvac and finishes. n/a for maher | $1,750,000 |
| Apr 18, 2017 | Never finaled issued Apr 2017, no final | 45 Fremont St | Pioneer Fire Inc. | 33rd floor - relocate 106 pendents, remove 3 pendents. ref t.i. #201702149324.Details
33rd floor - relocate 106 pendents, remove 3 pendents. ref t.i. #201702149324. | $36,122 |
| Apr 12, 2017 | Completed final sign-off May 2017 | 45 Fremont St | Honeywell International, Inc | install 37 ceiling speaker strobes, install 4 wall speakers/storbe, 6 ceiling speakers, 2 smoke det, 5 duct smoke det at heat pump, install 5 relays at heat pumps, install 2 edr, 2 cr for publice address shunt, uprade 1 strobe power supply, replace 5 e smoke det. domo 24 ceiling speaker strobes,Details
install 37 ceiling speaker strobes, install 4 wall speakers/storbe, 6 ceiling speakers, 2 smoke det, 5 duct smoke det at heat pump, install 5 relays at heat pumps, install 2 edr, 2 cr for publice address shunt, uprade 1 strobe power supply, replace 5 e smoke det. domo 24 ceiling speaker strobes, | $30,000 |
| Mar 15, 2017 | Never finaled issued Mar 2017, no final | 45 Fremont St | street space permit | ||
| Feb 14, 2017 | Completed final sign-off Aug 2017 | 45 Fremont St | Gci, Inc | 33rd flr: ti include drywall, ceilinmg, finishes, mechanical, electrical and full floor plumbing maher naDetails
33rd flr: ti include drywall, ceilinmg, finishes, mechanical, electrical and full floor plumbing maher na | $2,500,000 |
| Feb 7, 2017 | Completed final sign-off May 2017 | 45 Fremont St | Richlen Construction | 33rd flr: restroom barrier removal work, new light fixtures, finishes, fixtures and accessories & partitions. mep, fire life safety under sep permit maher naDetails
33rd flr: restroom barrier removal work, new light fixtures, finishes, fixtures and accessories & partitions. mep, fire life safety under sep permit maher na | $100,000 |
| May 17, 2016 | Never finaled issued May 2016, no final | 45 Fremont St | street space | ||
| Mar 18, 2016 | Completed final sign-off Jul 2023 | 45 Fremont St | Ayoob & Peery Plumbing Co Inc | 8th fl. add relocate & remove fire sprinklers per ti (3 add) (19 relocate) (3 remove) 8th floor. ref pa 2016-0115-7201.Details
8th fl. add relocate & remove fire sprinklers per ti (3 add) (19 relocate) (3 remove) 8th floor. ref pa 2016-0115-7201. | $11,440 |
| Mar 17, 2016 | Completed final sign-off Aug 2017 | 45 Fremont St | Honeywell International, Inc | 8th floor fire alarm modification: install (3) speaker/strobes, (3) strobes; (4) speakers. (1) smoke in the 1df room, (2) emergency release, upgrade strobe power supply to 10 amps. remvoe (4) speakers & (5) strobes. referenced ti 2016.01157201 n/a maher ordinanceDetails
8th floor fire alarm modification: install (3) speaker/strobes, (3) strobes; (4) speakers. (1) smoke in the 1df room, (2) emergency release, upgrade strobe power supply to 10 amps. remvoe (4) speakers & (5) strobes. referenced ti 2016.01157201 n/a maher ordinance | $7,196 |
| Jan 15, 2016 | Completed final sign-off Nov 2017 | 45 Fremont St | Rudolph Commercial Interiors Inc, Rci | remodel of 8th fl. add 4 new offices, 3 new conference rooms/focus rooms, 1 new 1df room and 1 new breakroom. new furniture, paint. new mech, plumb, elec for new space. no new toilets. n/a for maher.Details
remodel of 8th fl. add 4 new offices, 3 new conference rooms/focus rooms, 1 new 1df room and 1 new breakroom. new furniture, paint. new mech, plumb, elec for new space. no new toilets. n/a for maher. | $175,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Honeywell International, Inc (54), Richlen Construction (36), Principal Builders Inc. (16), Johnson Controls Fire (12), Sc Builders, Inc (11), Golden Gate Fire Protection Inc (7), Anderson, Rowe & Buckley, Inc. (5), Ayoob & Peery Plumbing Co Inc (5), Skyline Construction (5), Thomas Swan Sign Co Inc (4), True North Signs & Graphic Services (4), Novo Construction Inc (3), Gci, Inc (2), H & M Fire Protection, Inc. (2), Pioneer Fire Inc. (2), Pribuss Engineering Inc (2), Rudolph Commercial Interiors Inc, Rci (2), Truebeck Construction (2), B N Builders Inc, Clune Construction Company L P, Martin Sign Co Inc., Matrix Hg Inc, Northern Sun Associates, Potter Fire Protection, Sotello Graphic Associates
- Architects
- Michael R. Downey (8), Stanley Lew (5), Lisa Bieringer (4), Douglas Zucker (3), Jeong Choi (3), Rmw Architecture (3), Danette Munir (2), Donnie Lam (2), Jeffrey Hollander (2), Nathan Dison (2), Brian Milford, Erin Uesugi, Joe Pirrone, Justin Beadle, Kava Massih, Kimberly O'dowd, Luda Hoe, Sashikala Murthy, Scott Douglas Wurl, Studio O& A
- Engineers
- Amit Wadhwa (9), Levi G. Abarte (8), Anthony Vergari (4), Dawn Macfadyen (4), Arthur Metzler (3), Alexander Joseph Pacheco (2), Mozart Faizi (2), Rodolpho Bustos (2), Rudolfo P Bustos Iii (2), Anderson & Rowe & Buckey, Babak Vazari, Bruce Krietzer, Christopher Lloyd, Donald Dammen, Jeffrey Taner, Jordan Malabed, Lars P. Mortensen, Mahmoud Maamouri, Mahmoud Moamuri, Meaghan Hallican, Paul Cordova, Paul Cordova
- Authorized agents
- Elias Horat, Estela Conanan
- Designers
- Honeywell International, Inc (7), Michael Hardcastle (2), Golden Gate Fire Protection, Pioneer Fire Inc.
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.