Jeffrey Hollander
- License
- C21179
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- Firm
- Hollander Design Group
- Based in
- San Diego
- On San Francisco permits
- Mar 2019 to Apr 2023
3 permits since 2000 (architect on 3 permits): 3 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Principal Builders Inc. (2), Olson Construction
- Engineers
- Michael Carlomagno, Ryan Bertalan
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 3
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 28, 2023 | Completed final sign-off Oct 2023 | 45 Fremont St | Principal Builders Inc. | 27th fl t.i. currently unoccupied. fire alarm and sprinkler and mep deferred. no exterior changes.Details
27th fl t.i. currently unoccupied. fire alarm and sprinkler and mep deferred. no exterior changes. | $4,250,000 |
| Mar 23, 2023 | Completed final sign-off Oct 2023 | 45 Fremont St | Principal Builders Inc. | 27/f: demo of interior restrooms: ceiling, (e) light fixtures, remove decorative light fixtures, toilet partitions, remove toilet urinal fixtures, restroom accessories, countertops, lavatories, mirrors and tile from walls and floor. no load bearing element affected. to remain vacant per ab-017Details
27/f: demo of interior restrooms: ceiling, (e) light fixtures, remove decorative light fixtures, toilet partitions, remove toilet urinal fixtures, restroom accessories, countertops, lavatories, mirrors and tile from walls and floor. no load bearing element affected. to remain vacant per ab-017 | $10,000 |
| Mar 25, 2019 | Completed final sign-off Jan 2020 | 65 Geary St | Olson Construction | non-structural interior demolition, new drywall partitions, new drywall ceilings, new finishes, doors frames and harware, lighting, powder, and hvac duct alteration. fire alarm/fire sprinklers on deferred submittals. no plumbing on this project. n/a for maher.Details
non-structural interior demolition, new drywall partitions, new drywall ceilings, new finishes, doors frames and harware, lighting, powder, and hvac duct alteration. fire alarm/fire sprinklers on deferred submittals. no plumbing on this project. n/a for maher. | $202,799 |