Paul Cordova
- License
- S5657
- Structural engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up S5657 at the Board for Professional Engineers
- Listed as
- engineer
- Firm
- Simpson Gumpertz & Heger
- Based in
- Oakland
- On San Francisco permits
- Aug 2026 to Aug 2026
2 permits since 2000 (engineer on 2 permits): 2 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- G32 Construction & Development, Skyline Construction
- Architects
- Sashikala Murthy
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 1
- Commercial 1
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 14, 2026 | In progress issued Sep 2026 | 2028 Bryant St | G32 Construction & Development | install roof tie off anchors at the roof and plates at the interior face or the parapet for a building maintenance system. the operating procedure outline sheet and specifications for the building maintenance systtem as a defered submittal.Details
install roof tie off anchors at the roof and plates at the interior face or the parapet for a building maintenance system. the operating procedure outline sheet and specifications for the building maintenance systtem as a defered submittal. | $85,000 |
| Aug 12, 2026 | In progress issued Aug 2026 | 45 Fremont St | Skyline Construction | 17/f: installation of life safety and seismic requirements for (2) one-person phone booths. accessibility upgrades in the core restrooms are also included. mep and fire life safety drawings are deferred.Details
17/f: installation of life safety and seismic requirements for (2) one-person phone booths. accessibility upgrades in the core restrooms are also included. mep and fire life safety drawings are deferred. | $127,000 |