Dawn Macfadyen
- License
- E16475
- Electrical engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up E16475 at the Board for Professional Engineers
- Listed as
- engineer
- On San Francisco permits
- Nov 2019 to Apr 2021
4 permits since 2000 (engineer on 4 permits): 4 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Richlen Construction (4)
- Architects
- Michael R. Downey (4)
- Engineers
- Anthony Vergari (4), Arthur Metzler (3)
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 6, 2021 | Completed final sign-off Dec 2021 | 45 Fremont St | Richlen Construction | 11/f: minor demo of walls, doors and lighting, addition of a conference room and changing of an existing conference room into a recession area, some new ceilings and lighting, new systems furniture, power and data connectivity and finish modifications.Details
11/f: minor demo of walls, doors and lighting, addition of a conference room and changing of an existing conference room into a recession area, some new ceilings and lighting, new systems furniture, power and data connectivity and finish modifications. | $105,000 |
| Nov 25, 2019 | Completed final sign-off May 2021 | 45 Fremont St | Richlen Construction | 10th flr. interior demo & ti including mepDetails
10th flr. interior demo & ti including mep | $2,500,000 |
| Nov 25, 2019 | Completed final sign-off May 2021 | 45 Fremont St | Richlen Construction | 3rd fl - interior demo & ti including mepDetails
3rd fl - interior demo & ti including mep | $2,000,000 |
| Nov 25, 2019 | Completed final sign-off Jun 2021 | 45 Fremont St | Richlen Construction | interior demo & ti including mepDetails
interior demo & ti including mep | $2,500,000 |