Jeong Choi
- License
- C37693
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- On San Francisco permits
- Sep 2026 to Sep 2026
3 permits since 2000 (architect on 3 permits): 3 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Engineers
- Bruce Krietzer
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 8, 2026 | In progress filed Sep 2026, not yet issued | 45 Fremont St | 16th floor: t.i. project for a single tenant. scope of work includes a new non-rated partition layout to create conference rooms, private offices, phone rooms, pantry space, with new ceiling, floor, and wall finishes. mep included.Details
16th floor: t.i. project for a single tenant. scope of work includes a new non-rated partition layout to create conference rooms, private offices, phone rooms, pantry space, with new ceiling, floor, and wall finishes. mep included. | $1,200,000 | |
| Sep 8, 2026 | In progress filed Sep 2026, not yet issued | 45 Fremont St | 18th floor: t.i. for single tenant. new non rated partition layout to create conference room, private offices, phone rooms. new ceiling, floor, and wall finishes. mep included.Details
18th floor: t.i. for single tenant. new non rated partition layout to create conference room, private offices, phone rooms. new ceiling, floor, and wall finishes. mep included. | $3,000,000 | |
| Sep 8, 2026 | In progress filed Sep 2026, not yet issued | 45 Fremont St | non structural demo of level 28 office spaces with the exception of e restrooms, stairs, elec rooms and mech rooms. demo of e light fixtures and new light fixtures in open office, restrooms, elevator lobby. new plumbing fixtures to be installed at restrooms. demo of secondary duct branches.Details
non structural demo of level 28 office spaces with the exception of e restrooms, stairs, elec rooms and mech rooms. demo of e light fixtures and new light fixtures in open office, restrooms, elevator lobby. new plumbing fixtures to be installed at restrooms. demo of secondary duct branches. | $900,000 |