Amir Kakavand
- Listed as
- architect
- On San Francisco permits
- Apr 2007 to Aug 2026
13 permits since 2000 (architect on 13 permits): 3 completed, 5 in progress, 2 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 10, 2026 | In progress issued Sep 2026 | 539 Bryant St | Source Planning And Construction Inc | tenant improvement remodel including new enclosure at basement level elevator hoistway opening and a new smoke draft curtain at 2nd and 4th floor elevator hoistway opening.Details
tenant improvement remodel including new enclosure at basement level elevator hoistway opening and a new smoke draft curtain at 2nd and 4th floor elevator hoistway opening. | $89,646 |
| Aug 7, 2026 | In progress issued Aug 2026 | 455 Market St | Rudolph Commercial Interiors Inc, Rci | 20th f/l, ste 2000 & 2070: addition of new non-load bearing demising partition w/ the reloacation of one (1) light fixture and re-switching if fixtures.Details
20th f/l, ste 2000 & 2070: addition of new non-load bearing demising partition w/ the reloacation of one (1) light fixture and re-switching if fixtures. | $62,370 |
| Jul 14, 2026 | In progress issued Jul 2026 | 101 02nd St | Source Planning And Construction Inc | 8/f suite 800: tenant improvement remodel including new partitions, office door and glazing. reference plan for restrooms #202504285316 completed 11/18/2025. mep deferred.Details
8/f suite 800: tenant improvement remodel including new partitions, office door and glazing. reference plan for restrooms #202504285316 completed 11/18/2025. mep deferred. | $324,000 |
| Apr 27, 2026 | In progress issued Apr 2026 | 101 02nd St | Source Planning And Construction Inc | (ste# 350 / 3rd floor) revision to pa# 202603268312: work includes installation of 6 phone booths.Details
(ste# 350 / 3rd floor) revision to pa# 202603268312: work includes installation of 6 phone booths. | |
| Mar 26, 2026 | In progress issued Mar 2026 | 101 02nd St | Source Planning And Construction Inc | 3/f suite 350 - work includes: new partitions, office door and glazing and mill work.Details
3/f suite 350 - work includes: new partitions, office door and glazing and mill work. | $125,000 |
| Jul 18, 2025 | Completed final sign-off Apr 2026 | 3106 Turk Bl | new concrete slab on grade. revision to pa: 202505015594.Details
new concrete slab on grade. revision to pa: 202505015594. | $18,000 | |
| May 1, 2025 | Completed final sign-off Apr 2026 | 3106 Turk Bl | enlarge an exterior 4 x 3 window to 4 x 4. removing existing door and adding 6' sliding door. moving a partition wall back 4' to create 2 rooms. adding a kitchenette with a 2 burner stove top. enlarging an existing bathroom. all work at basement level of homeDetails
enlarge an exterior 4 x 3 window to 4 x 4. removing existing door and adding 6' sliding door. moving a partition wall back 4' to create 2 rooms. adding a kitchenette with a 2 burner stove top. enlarging an existing bathroom. all work at basement level of home | $80,000 | |
| Feb 13, 2023 | Never finaled issued Feb 2023, no final | 521 Gough St | metal scissor security gate to be installed in front of office entrance doors 2 windows sliding scissor gates are attached to a frame on a steel box trackDetails
metal scissor security gate to be installed in front of office entrance doors 2 windows sliding scissor gates are attached to a frame on a steel box track | $1,100 | |
| Sep 27, 2022 | Never finaled filed Sep 2022, never issued | 500 Sutter St | facade repairs including brick, terracotta, wood windows and metal cornicesDetails
facade repairs including brick, terracotta, wood windows and metal cornices | $1,500,000 | |
| Jun 7, 2022 | Expired or cancelled cancelled Jan 2026 | 521 Gough St | Vortex Industries Inc | install metal scissor security gate in front entrance doors and windows. 1/f front of 521 gough st. 120sf. sliding scissor gate are attached to a frame on a steel box track. the frame is attached to the floor, walls and ceiling of entryway (concrete).Details
install metal scissor security gate in front entrance doors and windows. 1/f front of 521 gough st. 120sf. sliding scissor gate are attached to a frame on a steel box track. the frame is attached to the floor, walls and ceiling of entryway (concrete). | $1,100 |
| Jun 20, 2018 | Completed final sign-off Jan 2020 | 521 Gough St | 1st fl- restroom remodel, converting shower room to restroomDetails
1st fl- restroom remodel, converting shower room to restroom | $6,000 | |
| May 2, 2013 | Expired or cancelled cancelled Jan 2026 | 2100 Webster St | 2nd floor-replace (e) reception desk with new ada reception desk. barrier removal.Details
2nd floor-replace (e) reception desk with new ada reception desk. barrier removal. | $16,000 | |
| Apr 16, 2007 | Expired or cancelled expired Jun 2008 | 515 29th St | removing existing stud wall guardrail and repalce with new glass railing system. approximately 28' linear feet of 42" high glass railing in entry room/mezzanine area.Details
removing existing stud wall guardrail and repalce with new glass railing system. approximately 28' linear feet of 42" high glass railing in entry room/mezzanine area. | $6,000 |