Permit GraphSan Francisco building permits since 2000

Block 8709, lot 019

1470 Owens St

28 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
May 2, 2022Completed
final sign-off Aug 2022
1470 Owens StTruebeck Constructiontemporary(2) construction of trailers on the roof of adjacement parking garage at 1470 owens st.$52,000
Feb 21, 2020Completed
final sign-off Jun 2020
1470 Owens StTruebeck Constructionrevision to app#201806010826. s1 and s2, addebd #1 and #2. an ejector pump added to help with movement of waste water out to the manhole.$20,000
Jan 23, 2020Completed
final sign-off Mar 2020
1470 Owens StTruebeck Constructionrevision to pa 2018-0601-0826 to add wind screens at 4th fl elevators$1,500
Dec 26, 2019Completed
final sign-off Jun 2020
1470 Owens StTruebeck Constructionadministrative permit to demonstrate passing test coverage and that no errcs for the parking structural is required. related to site permit app#201806010826
Oct 31, 2019Completed
final sign-off Jun 2020
1470 Owens StTruebeck Constructionrev to pa# 201806010826 add #2, misc rev have been made to the archtictural and security drawings, changes include: security cameras, emergency blue phones added to levels 2-4, adjacaent to elevators, card readers were added to a number at doors, smoke detectors, access door
Oct 8, 2019Completed
final sign-off Jun 2020
1470 Owens StTruebeck Constructionevacuation signage on plan ref pa 2018-0601-0826$2,500
Sep 25, 2019Completed
final sign-off Aug 2020
1470 Owens StTruebeck Constructiondeferred submittal to pa 2018-0601-0826 green screen item #12$5,000
Sep 18, 2019Completed
final sign-off Jan 2020
1470 Owens StAd Art Inc.install ground non electric double faced sign$5,000
Aug 21, 2019Completed
final sign-off Feb 2020
1470 Owens StTruebeck Constructioninstall non electric sign(s) for "1470"$1,000
Aug 21, 2019Completed
final sign-off Feb 2020
1470 Owens StTruebeck Constructionparking signage permit for 201806010826$2,000
Aug 21, 2019Completed
final sign-off Feb 2020
1470 Owens StTruebeck Constructioninstall non electric sign(s) for parking$1,000
Aug 7, 2019Completed
final sign-off Feb 2020
1470 Owens StTruebeck Constructiondeferred submittal to pa 2018-0601-0826 item #15 alulminum composite panels
Aug 7, 2019Completed
final sign-off Feb 2020
1470 Owens StTruebeck Constructiondeferred submittal to pa 2018-0601-0826 item #10 security screen system
Jul 2, 2019Completed
final sign-off Mar 2020
1470 Owens StTruebeck Constructiondeferred submittal to pa 201806010826, item 2 "miscellaneous metal rails". metal rails
Jul 2, 2019Completed
final sign-off Mar 2020
1470 Owens StTruebeck Constructiondeferred submittal to pa 201806010826, item 3 "metal stud wall system" cold-formed steel framing
Jul 2, 2019Completed
final sign-off Mar 2020
1470 Owens StTruebeck Constructiondeferred submittal to pa 201806010826. aluminum fin facade.
May 24, 2019Completed
final sign-off Feb 2020
1470 Owens StTruebeck Constructioninstallation of metal stairs associated with app#201806010826. n/a for maher
Apr 23, 2019Completed
final sign-off Jun 2020
1470 Owens StTruebeck Constructionrevision to 2018-1102-4884. revision include relocation of back flow preventer and revised fire department connection.
Apr 19, 2019Completed
final sign-off Feb 2020
1470 Owens StTruebeck Constructioninstallation of curtain walls. deferred submittal to pa 201806010826
Apr 17, 2019Completed
final sign-off Jun 2020
1470 Owens Stinstallation of cable barriers. ref 201806010826 for deferred submittal$65,000
Apr 10, 2019Completed
final sign-off Jun 2020
1470 Owens StTruebeck Constructionrev to pa# 201806010826-s1 & s2 rev include fire pump room, configuration, security screen changes & landscape
Feb 6, 2019Completed
final sign-off Mar 2020
1470 Owens StTruebeck Constructionproduction anger cast piles.$900,000
Jan 24, 2019Completed
final sign-off Jun 2020
1470 Owens StTruebeck Constructionrevision to pa #201806010826-s1. scope includes: pile cap revisions, clarification of grade beam reinforcement, supplemental reinforcement, and other clarifications.
Nov 6, 2018Completed
final sign-off Oct 2020
1470 Owens StTruebeck Constructiondeferred plumbing permit for (n) bldg. for pid review only. related to pa# 2018-0601-0826. stormwater plan review.
Nov 2, 2018Completed
final sign-off Jun 2020
1470 Owens StTruebeck Construction6" fire water service and sprinklers underground per nfpa 24. for sprinklers plan under 201806010826 addendum 3. there is existing 8' underground that will be removed under separate permit.$10,369
Oct 25, 2018Completed
final sign-off Jun 2020
1470 Owens StTruebeck Constructiondesign-build construction of auger cast piles load test & indicator pile program$25,000
Oct 17, 2018Completed
final sign-off Feb 2020
1470 Owens StTruebeck Constructiondemolition of existing surface. grading in preparation of new parking lot per 201806010826
Jun 1, 2018Completed
final sign-off Oct 2020
1470 Owens StTruebeck Constructionerect a parking garage type 2b.$6,000,000