Permit GraphShortlistSan Francisco building permits since 2000

Erica Hayes

License
S6428
Look the license up with the state
Listed as
architect, engineer
Firm
Degenkolb
Based in
San Francisco
On San Francisco permits
Aug 2021 to Sep 2026

17 permits since 2000 (engineer on 16 permits, architect on 1 permit): 6 completed, 9 in progress, 1 never finaled, 1 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Sep 9, 2026In progress
filed Sep 2026, not yet issued
2 Harrison St1st fl l- demo and construction of new employee cafeteria with prep plus dining areas, restrooms, exit passageway, elevator lobby, main lobby and assoicated mep improvements. ref demo pa 202607175230
Details
Permit
202609097839
Status
filed
Filed
Sep 9, 2026
Declared cost
$4,552,623
Address
2 Harrison St

1st fl l- demo and construction of new employee cafeteria with prep plus dining areas, restrooms, exit passageway, elevator lobby, main lobby and assoicated mep improvements. ref demo pa 202607175230

Open the permit page

$4,552,623
Jul 21, 2026In progress
issued Sep 2026
345 Spear StDevcon Construction1st floor: this set of documents is for the tenant improvement of a portion of the ground floor to become a bike repair space. no electrical bikes shall be serviced
Details
Permit
202607215359
Status
issued
Filed
Jul 21, 2026
Permit issued
Sep 2, 2026
Declared cost
$350,000
Address
345 Spear St

1st floor: this set of documents is for the tenant improvement of a portion of the ground floor to become a bike repair space. no electrical bikes shall be serviced

Open the permit page

$350,000
May 18, 2026In progress
filed May 2026, not yet issued
2 Harrison StB N Builders Incfloors 3,4,5: revision to permit 202512302985. added employee cafeteria with no prep qnd mk storage on 5/f. made various minor design changes throughout. add 3 phone booths on 3/f. mep included.
Details
Permit
202605181469
Status
filed
Filed
May 18, 2026
Address
2 Harrison St

floors 3,4,5: revision to permit 202512302985. added employee cafeteria with no prep qnd mk storage on 5/f. made various minor design changes throughout. add 3 phone booths on 3/f. mep included.

Open the permit page

May 12, 2026In progress
issued Jul 2026
1 Market St6/f: interior t.i area of work is 3068 sq.ft partial floor remodel. existing assembly space to be reconfigured. non-structural partition demo. construction of new partitions, doors, and ceiling. mep upgrades and structural.
Details
Permit
202603046914
Status
issued
Filed
May 12, 2026
Permit issued
Jul 8, 2026
Declared cost
$3,000,000
Address
1 Market St

6/f: interior t.i area of work is 3068 sq.ft partial floor remodel. existing assembly space to be reconfigured. non-structural partition demo. construction of new partitions, doors, and ceiling. mep upgrades and structural.

Open the permit page

$3,000,000
Apr 14, 2026In progress
issued Jul 2026
353 Sacramento StBcci Construction Company3rd fl. interior tenant improvement includes new partitons, doors, finishes, ceilings, lighting and millwork. new ramp and door for access to e e terrace. restruoom accessibility upgrades. mep deferred
Details
Permit
202604149358
Status
issued
Filed
Apr 14, 2026
Permit issued
Jul 1, 2026
Declared cost
$1,596,000
Address
353 Sacramento St

3rd fl. interior tenant improvement includes new partitons, doors, finishes, ceilings, lighting and millwork. new ramp and door for access to e e terrace. restruoom accessibility upgrades. mep deferred

Open the permit page

$1,596,000
Apr 13, 2026In progress
issued May 2026
188 The EmbarcaderoNovo Construction Incbasement - set of document is for construction of an mep equipement platform avoce the existing parking access ramp
Details
Permit
202604139314
Status
issued
Filed
Apr 13, 2026
Permit issued
May 19, 2026
Declared cost
$35,000
Address
188 The Embarcadero

basement - set of document is for construction of an mep equipement platform avoce the existing parking access ramp

Open the permit page

$35,000
Jan 14, 2026In progress
issued Feb 2026
353 Sacramento StBcci Construction Company3rd/fl- structural permit submittal to reinforce 3rd floor slab
Details
Permit
202601143835
Status
issued
Filed
Jan 14, 2026
Permit issued
Feb 2, 2026
Declared cost
$50,000
Address
353 Sacramento St

3rd/fl- structural permit submittal to reinforce 3rd floor slab

Open the permit page

$50,000
Dec 11, 2025In progress
issued Sep 2026
345 Spear StDevcon Constructiontenant improvement of first floor fitness space at hills plaza. tenant improvement includes construction of non-bearing partition, finishes, doors, frames, and hardware
Details
Permit
202512111594
Status
issued
Filed
Dec 11, 2025
Permit issued
Sep 16, 2026
Declared cost
$350,000
Address
345 Spear St

tenant improvement of first floor fitness space at hills plaza. tenant improvement includes construction of non-bearing partition, finishes, doors, frames, and hardware

Open the permit page

$350,000
Dec 11, 2025In progress
issued Jul 2026
345 Spear StDevcon Construction1/fl- scope of work tenant improvement including, non bearing partitions, ceilings, lights, doors, frames, hardware and casework and restroom upgrades for new event space. meps deferred.
Details
Permit
202512111591
Status
issued
Filed
Dec 11, 2025
Permit issued
Jul 14, 2026
Declared cost
$367,000
Address
345 Spear St

1/fl- scope of work tenant improvement including, non bearing partitions, ceilings, lights, doors, frames, hardware and casework and restroom upgrades for new event space. meps deferred.

Open the permit page

$367,000
Nov 7, 2025Completed
final sign-off Dec 2025
350 University StWoolsey Construction Incall work is at 1/f -project is limited to modifications to the north stair egress path & associated modifications to existing components along this path. scope includes slective demolition of non-load bearing partitions, new rated doors and frames, exit lighting, new exterior exit stair & associated
Details
Permit
202511079184
Status
complete
Filed
Nov 7, 2025
Permit issued
Dec 12, 2025
Final sign-off
Dec 31, 2025
Declared cost
$150,000
Address
350 University St

all work is at 1/f -project is limited to modifications to the north stair egress path & associated modifications to existing components along this path. scope includes slective demolition of non-load bearing partitions, new rated doors and frames, exit lighting, new exterior exit stair & associated

Open the permit page

$150,000
Nov 20, 2023Completed
final sign-off Jan 2024
300 Clay StBcci Construction Company2nd floor: structural permit to install (4) "stuff station" vending machines and brace them to (e) partition. added architectural sheet to show (4) new equipment unit in the supply room. ref pa# 201810092629
Details
Permit
202311201145
Status
complete
Filed
Nov 20, 2023
Permit issued
Dec 27, 2023
Final sign-off
Jan 19, 2024
Declared cost
$1,000
Address
300 Clay St

2nd floor: structural permit to install (4) "stuff station" vending machines and brace them to (e) partition. added architectural sheet to show (4) new equipment unit in the supply room. ref pa# 201810092629

Open the permit page

$1,000
Nov 16, 2022Never finaled
issued Jan 2023, no final
510 Townsend StBcci Construction Company6th fl - electrical & plumbing deferred permit to support approved arch permit. new lighting and power systems. structural revision to strengthened slab included. ref pa# 202208019661. new dishwasher type ii hood.
Details
Permit
202211166666
Status
issued
Filed
Nov 16, 2022
Permit issued
Jan 24, 2023
Declared cost
$50,000
Address
510 Townsend St

6th fl - electrical & plumbing deferred permit to support approved arch permit. new lighting and power systems. structural revision to strengthened slab included. ref pa# 202208019661. new dishwasher type ii hood.

Open the permit page

$50,000
Oct 21, 2022Expired or cancelled
expired Apr 2026
510 Townsend StBcci Construction Company7/f: structural only permit to strengthen slabs. ref bpa#202208170721
Details
Permit
202210214935
Status
expired
Filed
Oct 21, 2022
Permit issued
Oct 25, 2022
Declared cost
$80,000
Address
510 Townsend St

7/f: structural only permit to strengthen slabs. ref bpa#202208170721

Open the permit page

$80,000
Jun 9, 2022Completed
final sign-off Sep 2023
121 Spear StBcci Construction Company1st fl: revision to pa# 202203180339. changes to handrail at staircase
Details
Permit
202206096007
Status
complete
Filed
Jun 9, 2022
Permit issued
Jul 6, 2022
Final sign-off
Sep 21, 2023
Address
121 Spear St

1st fl: revision to pa# 202203180339. changes to handrail at staircase

Open the permit page

Mar 18, 2022Completed
final sign-off Sep 2023
121 Spear StBcci Construction Company1st floor: new lobby communicating stair, related handrail and guardrail. non structural partitions. doors/frames/hardware, ceiling, millwork, finishes included stuctural calcs included. mep deffered.
Details
Permit
202203180339
Status
complete
Filed
Mar 18, 2022
Permit issued
Mar 21, 2022
Final sign-off
Sep 21, 2023
Declared cost
$450,000
Address
121 Spear St

1st floor: new lobby communicating stair, related handrail and guardrail. non structural partitions. doors/frames/hardware, ceiling, millwork, finishes included stuctural calcs included. mep deffered.

Open the permit page

$450,000
Feb 18, 2022Completed
final sign-off Jun 2023
121 Spear StBcci Construction Company4/f: construction of new non-structural partitions, doors, frames, hardware, ceilings, millwork and finishes. mep deferred. structural drawings and calcs included.
Details
Permit
202202188358
Status
complete
Filed
Feb 18, 2022
Permit issued
Jun 1, 2022
Final sign-off
Jun 7, 2023
Declared cost
$6,241,495
Address
121 Spear St

4/f: construction of new non-structural partitions, doors, frames, hardware, ceilings, millwork and finishes. mep deferred. structural drawings and calcs included.

Open the permit page

$6,241,495
Aug 11, 2021Completed
final sign-off Mar 2023
188 The EmbarcaderoPlant Construction Co, Lprooftop existing equipment seismic anchorage.
Details
Permit
202108116204
Status
complete
Filed
Aug 11, 2021
Permit issued
Aug 20, 2021
Final sign-off
Mar 3, 2023
Declared cost
$25,000
Address
188 The Embarcadero

rooftop existing equipment seismic anchorage.

Open the permit page

$25,000