Block 8708, lot 005
235 Berry St
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
19 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 7, 2007 | Completed final sign-off Oct 2007 | 235 Berry St | renew application #200611308876 for final inspectionDetails
renew application #200611308876 for final inspection | $4,500 | |
| May 30, 2007 | Completed final sign-off Oct 2007 | 235 Berry St | to renew app # 200607287890 for final inspectionDetails
to renew app # 200607287890 for final inspection | ||
| May 30, 2007 | Completed final sign-off Oct 2007 | 235 Berry St | to renew app #200402025349 and 200412020572 and 200601041487 for final inspectionDetails
to renew app #200402025349 and 200412020572 and 200601041487 for final inspection | ||
| Feb 6, 2007 | Completed final sign-off Oct 2007 | 235 Berry St | Redwood Electric Group Inc | change off annunicator face plate.Details
change off annunicator face plate. | |
| Nov 30, 2006 | Completed final sign-off Oct 2007 | 235 Berry St | 235 berry st. #115 & #116: open door cut out in wall connecting two adjacent units. frame and install door. remove non-structural closet wall in each unit (creating hallway).Details
235 berry st. #115 & #116: open door cut out in wall connecting two adjacent units. frame and install door. remove non-structural closet wall in each unit (creating hallway). | $4,500 | |
| Nov 27, 2006 | Never finaled issued Nov 2006, no final | 235 Berry St | street spaceDetails
street space | ||
| Nov 6, 2006 | Completed final sign-off Oct 2007 | 235 Berry St | to renew pa#2001/03/02/3320. for final insspection only.Details
to renew pa#2001/03/02/3320. for final insspection only. | ||
| Jul 28, 2006 | Completed final sign-off Oct 2007 | 235 Berry St | memo addressing allowable maximum dimensions for guardrail encroachment into exit stair. memo has been reviewed with field inspector, who has verbally stated that the proposal is acceptable, but requested the memo to be formally approved by dbi.Details
memo addressing allowable maximum dimensions for guardrail encroachment into exit stair. memo has been reviewed with field inspector, who has verbally stated that the proposal is acceptable, but requested the memo to be formally approved by dbi. | ||
| Jun 20, 2006 | Completed final sign-off Oct 2007 | 235 Berry St | alterations to pa# 2001/03/02/3320 & pa# 2004/02/02/5349. interior modifications only to address field conditions. exhibit a describes revisions.Details
alterations to pa# 2001/03/02/3320 & pa# 2004/02/02/5349. interior modifications only to address field conditions. exhibit a describes revisions. | $41,644 | |
| May 18, 2006 | Never finaled issued May 2006, no final | 235 Berry St | street spaceDetails
street space | ||
| Jan 4, 2006 | Completed final sign-off Oct 2007 | 235 Berry St | alteration to issued site permit & addendan pa# 2004/02/02/5349 's'. including alteration to add # 2. super structure, conextect, exterior framing, exit stair, cement board panel.Details
alteration to issued site permit & addendan pa# 2004/02/02/5349 's'. including alteration to add # 2. super structure, conextect, exterior framing, exit stair, cement board panel. | $27,000 | |
| Nov 17, 2005 | Never finaled issued Nov 2005, no final | 235 Berry St | streetspaceDetails
streetspace | ||
| May 11, 2005 | Never finaled issued May 2005, no final | 235 Berry St | street spaceDetails
street space | ||
| Apr 29, 2005 | Completed final sign-off Oct 2007 | 235 Berry St | revise structural system for upper floor levels of bldg. from type ii bearing wall construction toDetails
revise structural system for upper floor levels of bldg. from type ii bearing wall construction to | $300,100 | |
| Mar 2, 2005 | Expired or cancelled withdrawn Sep 2006 | 235 Berry St | structural alterations to appl#200103023320 & 200412020572Details
structural alterations to appl#200103023320 & 200412020572 | $300,001 | |
| Dec 2, 2004 | Completed final sign-off Oct 2007 | 235 Berry St | alteration to work under construction for pa# 2004/02/02/5349 grading foundation, super structural.Details
alteration to work under construction for pa# 2004/02/02/5349 grading foundation, super structural. | $5,001 | |
| Nov 8, 2004 | Never finaled issued Nov 2004, no final | 235 Berry St | street spaceDetails
street space | ||
| Feb 2, 2004 | Completed final sign-off Oct 2007 | 235 Berry St | alter appl#200103023320 include change from mixed-use occupancy to r-1,s-3,decrease unit from 106 toDetails
alter appl#200103023320 include change from mixed-use occupancy to r-1,s-3,decrease unit from 106 to | ||
| Mar 2, 2001 | Completed final sign-off Oct 2007 | 235 Berry St | erect 7 stories of 106 dwelling units, residential, parking, retailDetails
erect 7 stories of 106 dwelling units, residential, parking, retail | $19,200,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Redwood Electric Group Inc
- Architects
- Leddy Maytum Stacy, Richard Stacy, Richard Stacy
- Engineers
- Leddy Maytum Stacy (2)
- Pmt consultant/expediters
- Apramjeet Ghuman
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.