- On San Francisco permits
- Dec 2005 to May 2023
26 permits since 2000 (architect on 25 permits, engineer on 1 permit): 21 completed, 1 in progress, 4 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 2, 2023 | In progress issued Jul 2024 | 756 Grand View Av | A L Martin Construction | new horizontal addition to provide a residential elevatibule. new basement utility room by excavation within (e) crawl space. new heat pumpheating system & associated electrical upgrade. new glass windscreen at (e) roof deck. new finish coat on all exterior stucco.Details
new horizontal addition to provide a residential elevatibule. new basement utility room by excavation within (e) crawl space. new heat pumpheating system & associated electrical upgrade. new glass windscreen at (e) roof deck. new finish coat on all exterior stucco. | $200,000 |
| Aug 30, 2022 | Completed final sign-off Apr 2023 | 410 China Basin St | Cahill Contractors Llc. | revision to arch. and mep addendum for sffd place of assembly permit. ref permit 201901281440-s2.Details
revision to arch. and mep addendum for sffd place of assembly permit. ref permit 201901281440-s2. | |
| Sep 22, 2021 | Completed final sign-off Apr 2023 | 410 China Basin St | Cahill Contractors Llc. | revision to document the elevator gurney code equivalency. no change to elevator hoistway dimensions. ref pa# 201901281440 s2.Details
revision to document the elevator gurney code equivalency. no change to elevator hoistway dimensions. ref pa# 201901281440 s2. | |
| Sep 14, 2021 | Completed final sign-off Dec 2021 | 1990 Folsom St | Nibbi Bros Assoc Inc. | administrative submittal to 202102245214 r1 for mod review of commercial space restroomsDetails
administrative submittal to 202102245214 r1 for mod review of commercial space restrooms | |
| Feb 24, 2021 | Completed final sign-off Dec 2021 | 1990 Folsom St | Nibbi Bros Assoc Inc. | add 9 ground floor public restrooms & 2 janitor's closets to the scope of a 100% affordable housing project pa# 201707051030.Details
add 9 ground floor public restrooms & 2 janitor's closets to the scope of a 100% affordable housing project pa# 201707051030. | $50,000 |
| Jun 3, 2019 | Completed final sign-off Feb 2020 | 455 Fell St | Cahill Contractors Llc. | rev to pa 2016-0506-6751 remove trash room door in lower level corridor, remove stairs @ 5th fl corridor and replace with ramp to maintain accessible means of egress. rpovide handrail on one side of ramp, partial handrail between janitor's closet & electri closet, lower threshold @ door to roof.Details
rev to pa 2016-0506-6751 remove trash room door in lower level corridor, remove stairs @ 5th fl corridor and replace with ramp to maintain accessible means of egress. rpovide handrail on one side of ramp, partial handrail between janitor's closet & electri closet, lower threshold @ door to roof. | $10,000 |
| Feb 22, 2019 | Completed final sign-off Jun 2020 | 1150 03rd St | Nibbi Bros Assoc Inc. | rooftop: install photovoltaic elevated canopy steel framing. pv system under sep permit. **maher n/a**Details
rooftop: install photovoltaic elevated canopy steel framing. pv system under sep permit. **maher n/a** | $35,000 |
| Nov 2, 2018 | Completed final sign-off Dec 2021 | 1990 Folsom St | Nibbi Bros Assoc Inc. | stormwater control plans for plumbing review only. new construction application number #201707051030Details
stormwater control plans for plumbing review only. new construction application number #201707051030 | |
| Jul 16, 2018 | Never finaled issued Sep 2018, no final | 455 Fell St | Cahill Contractors Inc | weiss-ishai/sffd requested to submit addendum 4 drawing as a separate perit since the approved addendum 4 was not routed to sffd. reference permit 2016-0-06-6751. this separate permit is only for sffd review & routed to weissishai/sffd.Details
weiss-ishai/sffd requested to submit addendum 4 drawing as a separate perit since the approved addendum 4 was not routed to sffd. reference permit 2016-0-06-6751. this separate permit is only for sffd review & routed to weissishai/sffd. | |
| Jul 5, 2017 | Completed final sign-off Dec 2021 | 1990 Folsom St | Nibbi Bros Assoc Inc. | to erect 8 stories, type 1a,1b,vb 143 residential unit and childcare center. (r-2, i-4)Details
to erect 8 stories, type 1a,1b,vb 143 residential unit and childcare center. (r-2, i-4) | $44,350,000 |
| Jun 28, 2016 | Never finaled issued Jan 2017, no final | 75 Arkansas St | to erect 4 stories, type va, 30 units student housing with mixed use building. ** maher: n/a **Details
to erect 4 stories, type va, 30 units student housing with mixed use building. ** maher: n/a ** | $13,800,000 | |
| May 6, 2016 | Completed final sign-off Mar 2020 | 455 Fell St | Cahill Contractors Inc, Siemens Industry, Inc., Rcm Fire Protection Inc. | construct (n) 108 residential units, no basement, assembly, office, mercantile, bike parkingDetails
construct (n) 108 residential units, no basement, assembly, office, mercantile, bike parking | $35,000,000 |
| Dec 23, 2015 | Completed final sign-off Apr 2016 | 540 Mission Bay Blvd North Bl | Nibbi Bros Assoc Inc. | minor clarifications for access door at elecvator overrun as requested by sffd review. (ref#201310250271).Details
minor clarifications for access door at elecvator overrun as requested by sffd review. (ref#201310250271). | $1,000 |
| Oct 23, 2015 | Never finaled filed Oct 2015, never issued | 300 Arballo Dr | to erect 8 stories, no basement, 89 units residential building.Details
to erect 8 stories, no basement, 89 units residential building. | $21,808,420 | |
| Jul 23, 2014 | Completed final sign-off Apr 2016 | 540 Mission Bay Blvd North Bl | Nibbi Bros Assoc Inc. | indicator piles for new construction. ref pa# 2013/10/25/0271.Details
indicator piles for new construction. ref pa# 2013/10/25/0271. | $190,000 |
| Oct 25, 2013 | Completed final sign-off May 2016 | 540 Mission Bay Blvd North Bl | Nibbi Bros Assoc Inc. | to erect 5 stories, no basement, 80 units transent housing, office & parking building.Details
to erect 5 stories, no basement, 80 units transent housing, office & parking building. | $22,600,000 |
| Feb 4, 2013 | Completed final sign-off Dec 2013 | 25 Essex St | Cahill Contractors Inc | revision to pa# 2010-0315-8191/s2-work asscoaied with revisions to the warming kitchen-removing partition between warming kitchen & the adjacent space along with the door & roll-down door. also includes misc changes to casework & finshes.Details
revision to pa# 2010-0315-8191/s2-work asscoaied with revisions to the warming kitchen-removing partition between warming kitchen & the adjacent space along with the door & roll-down door. also includes misc changes to casework & finshes. | $10,000 |
| Apr 8, 2011 | Never finaled issued Feb 2012, no final | 3650 Washington St | erect 4 story single family dwelling and a separate 2 story garage/study structure on the same lot.Details
erect 4 story single family dwelling and a separate 2 story garage/study structure on the same lot. | $1,000,000 | |
| Mar 15, 2010 | Completed final sign-off Dec 2013 | 25 Essex St | Cahill Contractors Inc | new construction - 8 stories of 120 du's and future supportive office(s), retail(s), restaurant(s) at first floor.Details
new construction - 8 stories of 120 du's and future supportive office(s), retail(s), restaurant(s) at first floor. | $25,000,000 |
| Mar 13, 2009 | Completed final sign-off Oct 2009 | 335 Berry St | James E Roberts-Obayashi Corporation | provide fire department required signage per sffd bulletin 5.05 for light gauge roof truss construction.Details
provide fire department required signage per sffd bulletin 5.05 for light gauge roof truss construction. | $200 |
| Dec 23, 2008 | Completed final sign-off Oct 2009 | 335 Berry St | revision to app #200609253217. change to second means of egress at parking garageDetails
revision to app #200609253217. change to second means of egress at parking garage | $34,000 | |
| May 20, 2008 | Completed final sign-off Dec 2008 | 1224 Mariposa St | addition of 2 windows in east proeprty line wall. windows are 45 min. fire rated systems. fixed: per ab-009Details
addition of 2 windows in east proeprty line wall. windows are 45 min. fire rated systems. fixed: per ab-009 | $14,500 | |
| Sep 25, 2006 | Completed final sign-off Oct 2009 | 330 Berry St | to erect 5 stories, 64 units of residential/parking.Details
to erect 5 stories, 64 units of residential/parking. | ||
| Sep 25, 2006 | Completed final sign-off Oct 2009 | 335 Berry St | to erect 5 stories, 67 units of residential / parking.Details
to erect 5 stories, 67 units of residential / parking. | ||
| Jun 20, 2006 | Completed final sign-off Oct 2007 | 235 Berry St | alterations to pa# 2001/03/02/3320 & pa# 2004/02/02/5349. interior modifications only to address field conditions. exhibit a describes revisions.Details
alterations to pa# 2001/03/02/3320 & pa# 2004/02/02/5349. interior modifications only to address field conditions. exhibit a describes revisions. | $41,644 | |
| Dec 15, 2005 | Completed final sign-off Nov 2006 | 1218 Mariposa St | The Fine European Construction/Uwb Dober | revising garage door from sliding to sectional door. adding a gas /replace (not primary source of heating)Details
revising garage door from sliding to sectional door. adding a gas /replace (not primary source of heating) | $1,000 |