Block 8719, lot 003
410 China Basin St
- City’s use
- Miscellaneous/Mixed-Use
- Built
- 2023
- Stories
- 4
- Units
- 141
- Building
- 92,566 sq ft
- Lot
- 47,438 sq ft
- Zoning
- NA
- Construction type
- REI
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
14 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 19, 2022 | Never finaled issued Apr 2023, no final | 410 China Basin St | California Solar Integrators Inc. | additional pv: 42 boviet 450w 18.9 kw. rooftop pv.Details
additional pv: 42 boviet 450w 18.9 kw. rooftop pv. | $37,800 |
| Sep 26, 2022 | Never finaled filed Sep 2022, never issued | 410 China Basin St | Cahill Contractors Llc. | priority processing - as-built errcs. revision to 201901281440 s7 errcs.Details
priority processing - as-built errcs. revision to 201901281440 s7 errcs. | |
| Aug 30, 2022 | Completed final sign-off Apr 2023 | 410 China Basin St | Cahill Contractors Llc. | revision to arch. and mep addendum for sffd place of assembly permit. ref permit 201901281440-s2.Details
revision to arch. and mep addendum for sffd place of assembly permit. ref permit 201901281440-s2. | |
| Aug 8, 2022 | Never finaled issued Aug 2022, no final | 410 China Basin St | Maguire Inc Dba Lahue And Associates | install 1 non illuminated channel letter sign to (e) canopy " home rise at mission bay". single faced, 9 sfDetails
install 1 non illuminated channel letter sign to (e) canopy " home rise at mission bay". single faced, 9 sf | $10,000 |
| Mar 18, 2022 | Never finaled issued Mar 2022, no final | 410 China Basin St | Cahill Contractors Llc. | to remove and replace water damaged finishes in modular residential units, corridors, stairwells & both spaces on level 1-4. replace in kind & maintain fire rated assemblies. work approved & performed under 201901281440. to comply w nov 202183924. all level 1 including units 116-126, 145, 201-208,Details
to remove and replace water damaged finishes in modular residential units, corridors, stairwells & both spaces on level 1-4. replace in kind & maintain fire rated assemblies. work approved & performed under 201901281440. to comply w nov 202183924. all level 1 including units 116-126, 145, 201-208, | $3,500,000 |
| Sep 22, 2021 | Completed final sign-off Apr 2023 | 410 China Basin St | Cahill Contractors Llc. | revision to document the elevator gurney code equivalency. no change to elevator hoistway dimensions. ref pa# 201901281440 s2.Details
revision to document the elevator gurney code equivalency. no change to elevator hoistway dimensions. ref pa# 201901281440 s2. | |
| Sep 16, 2021 | Never finaled issued Sep 2021, no final | 410 China Basin St | Cahill Contractors Llc. | as-builts fire alarm for pa201901281440-s4Details
as-builts fire alarm for pa201901281440-s4 | |
| Mar 22, 2021 | Never finaled issued Apr 2021, no final | 410 China Basin St | Maguire Inc Dba Lahue And Associates | fabrication & installation of evacuation signs.Details
fabrication & installation of evacuation signs. | $24,000 |
| Dec 2, 2020 | Completed final sign-off Apr 2023 | 410 China Basin St | Cahill Contractors Llc. | revision to pa 201901281440 s2 & s5 for flexible settlement joint revisions. 100% affordable housing projectDetails
revision to pa 201901281440 s2 & s5 for flexible settlement joint revisions. 100% affordable housing project | |
| Aug 31, 2020 | Completed final sign-off Jan 2023 | 410 China Basin St | Cahill Contractors Llc. | deferred plan check submittal for solar hot water heating system in apartment building currently in construction. building pa #2019-0128-1440.Details
deferred plan check submittal for solar hot water heating system in apartment building currently in construction. building pa #2019-0128-1440. | |
| Aug 19, 2020 | Completed final sign-off Jan 2023 | 410 China Basin St | Cosco Fire Protection Inc. | underground piping plan to p.o.c at street curb and provide underground piping to wharf hydrant for future construction under site permit#201901281440 (s)Details
underground piping plan to p.o.c at street curb and provide underground piping to wharf hydrant for future construction under site permit#201901281440 (s) | $10,000 |
| Jan 28, 2019 | Completed final sign-off Apr 2023 | 410 China Basin St | Cahill Const Service Inc | 100% affordable housing, to erect 4 stories, no basement, type v, 141 residential units with office & assembly building. (r-2,b,a-3)Details
100% affordable housing, to erect 4 stories, no basement, type v, 141 residential units with office & assembly building. (r-2,b,a-3) | $42,000,000 |
| Nov 28, 2012 | Never finaled issued Nov 2012, no final | 410 China Basin St | new address to block 88719, lot 003, 410 china basin st.Details
new address to block 88719, lot 003, 410 china basin st. | ||
| Nov 28, 2012 | Expired or cancelled expired Apr 2023 | 410 China Basin St | Joseph J Albanese Inc. | place 3 temporary construction trailers (2-60'x48", 1-96'x60') and construct decking and stairs for access for trailers.Details
place 3 temporary construction trailers (2-60'x48", 1-96'x60') and construct decking and stairs for access for trailers. | $20,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Cahill Contractors Llc. (7), Maguire Inc Dba Lahue And Associates (2), Cahill Const Service Inc, California Solar Integrators Inc., Cosco Fire Protection Inc., Joseph J Albanese Inc.
- Architects
- Richard Stacy (2), Richard Stacy
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.