Richard Stacy
- Listed as
- architect
- Firm
- Lms
- Based in
- San Francisco
- On San Francisco permits
- Jul 2006 to Sep 2020
4 permits since 2000 (architect on 4 permits): 3 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 11, 2020 | Completed final sign-off Jan 2022 | 1990 Folsom St | Truebeck Construction | ti of ground floor commercial for early care & education center. non-structural partitions & finishes, exterior courtyard improvements. mep/fire to be deferred. restrooms under base bldg scope pa #2017-0705-1030 s2/r2.Details
ti of ground floor commercial for early care & education center. non-structural partitions & finishes, exterior courtyard improvements. mep/fire to be deferred. restrooms under base bldg scope pa #2017-0705-1030 s2/r2. | $400,000 |
| Jan 28, 2019 | Expired or cancelled cancelled Sep 2019 | 406 China Basin St | 100% affordable housing, public access pedestrian path, emergency vehicle path w/ removable bollaros at entry from china basin & mission rock, landscaping, stormwater treatment& access bridge to community garden, no bldg on lot, reference pa #201901281440s.Details
100% affordable housing, public access pedestrian path, emergency vehicle path w/ removable bollaros at entry from china basin & mission rock, landscaping, stormwater treatment& access bridge to community garden, no bldg on lot, reference pa #201901281440s. | $50,000 | |
| Jan 28, 2019 | Completed final sign-off Apr 2023 | 410 China Basin St | Cahill Const Service Inc | 100% affordable housing, to erect 4 stories, no basement, type v, 141 residential units with office & assembly building. (r-2,b,a-3)Details
100% affordable housing, to erect 4 stories, no basement, type v, 141 residential units with office & assembly building. (r-2,b,a-3) | $42,000,000 |
| Jul 28, 2006 | Completed final sign-off Oct 2007 | 235 Berry St | memo addressing allowable maximum dimensions for guardrail encroachment into exit stair. memo has been reviewed with field inspector, who has verbally stated that the proposal is acceptable, but requested the memo to be formally approved by dbi.Details
memo addressing allowable maximum dimensions for guardrail encroachment into exit stair. memo has been reviewed with field inspector, who has verbally stated that the proposal is acceptable, but requested the memo to be formally approved by dbi. |