Block 0253, lot 020
1111 California St
- City’s use
- Commercial Misc
- Built
- 1956
- Stories
- 3
- Units
- 2
- Rooms
- 15 bathrooms
- Building
- 347,204 sq ft
- Lot
- 49,841 sq ft
- Zoning
- RM4
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
50 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 16, 2026 | In progress filed Sep 2026, not yet issued | 1111 California St | sf03152a - safety remediation: install 91) proposed guard rails at unprotected roof edges. proposed control lines & flags for designated access path, (1) proposed crosover stair bridge, (1) proposed vertical ladder w/ parapet platform.Details
sf03152a - safety remediation: install 91) proposed guard rails at unprotected roof edges. proposed control lines & flags for designated access path, (1) proposed crosover stair bridge, (1) proposed vertical ladder w/ parapet platform. | $15,000 | |
| Dec 17, 2025 | In progress filed Dec 2025, not yet issued | 1111 California St | at&t modification of an (e)wireless facility consisting of install (2)antennas; relocate (2)antennas; install mount modification. install (1) conversion kit w/ (9)converters, (1) 15amp, (2)50 amp dc breakers; remove (12) (e) batteries + install (2) 50 amp dc breakers; remove (12) existing batteriesDetails
at&t modification of an (e)wireless facility consisting of install (2)antennas; relocate (2)antennas; install mount modification. install (1) conversion kit w/ (9)converters, (1) 15amp, (2)50 amp dc breakers; remove (12) (e) batteries + install (2) 50 amp dc breakers; remove (12) existing batteries | $50,200 | |
| Aug 21, 2025 | Completed final sign-off Jan 2026 | 1111 California St | Well Design Dba Well Design Premium Sign | replacement of (e) illuminated parking lot signage, including (1) public parking sign, (1) exit only sign, (1) pedestrian entrance sign and parking lot information signs.Details
replacement of (e) illuminated parking lot signage, including (1) public parking sign, (1) exit only sign, (1) pedestrian entrance sign and parking lot information signs. | $30,000 |
| Jul 30, 2024 | Expired or cancelled withdrawn Sep 2025 | 1111 California St | Fluoresco Services Llc/Everbrite West Ll | install new signage into existing projecting structureDetails
install new signage into existing projecting structure | $28,000 |
| Feb 28, 2024 | Completed final sign-off Jan 2025 | 1111 California St | Endeavor Wireless Construction Inc, Mastec Network Solutions Inc | t-mobile: remove (2) (e) antennas and (4) (e) rrus; remove (1) (e) cabinet; install (4) (n) antennas, (n) frp screen, (2) (n) cabinets; remove and replace (e) elec panel; install (12) (n) batteries in (n) cabinet.Details
t-mobile: remove (2) (e) antennas and (4) (e) rrus; remove (1) (e) cabinet; install (4) (n) antennas, (n) frp screen, (2) (n) cabinets; remove and replace (e) elec panel; install (12) (n) batteries in (n) cabinet. | $60,000 |
| Sep 7, 2022 | Completed final sign-off Jan 2024 | 1111 California St | Modus Rex Llc | dish wireless - install 6(n) antennas, 12(n) rrus, 1(n) cabinet on 1 (n) equipment platform; install 2(n) batteriesDetails
dish wireless - install 6(n) antennas, 12(n) rrus, 1(n) cabinet on 1 (n) equipment platform; install 2(n) batteries | $142,000 |
| Aug 23, 2022 | Completed final sign-off Dec 2023 | 1111 California St | Unlimited Communications | removal of all sprint equipment demo such as cabinets, power panel, battery cabinets, antennas etcDetails
removal of all sprint equipment demo such as cabinets, power panel, battery cabinets, antennas etc | $15,000 |
| May 31, 2022 | Completed final sign-off Sep 2023 | 1111 California St | Metropolitan Electrical Construction | att: remove (4) (e) antennas, install (4) (n) antennas; remove (2) (e) cabinets; install (1) (n) cabinet ; install (4) (n) batteries.Details
att: remove (4) (e) antennas, install (4) (n) antennas; remove (2) (e) cabinets; install (1) (n) cabinet ; install (4) (n) batteries. | $53,000 |
| Mar 29, 2022 | Completed final sign-off Jul 2022 | 1111 California St | Alamo Lighting | installation of 4 electric vehicle charging stations within an existing parking garage.Details
installation of 4 electric vehicle charging stations within an existing parking garage. | $80,000 |
| Dec 15, 2021 | Expired or cancelled withdrawn Feb 2024 | 1111 California St | cell: relocate 4 antennas,install 2 new anteenas,isntall 4 new radios,remove 1 (e) elec cab and install 2 (n) ones with anncillary electrical equip inside.upgrade power from 100a to 200a and install 200a/c power panel.Details
cell: relocate 4 antennas,install 2 new anteenas,isntall 4 new radios,remove 1 (e) elec cab and install 2 (n) ones with anncillary electrical equip inside.upgrade power from 100a to 200a and install 200a/c power panel. | $25,000 | |
| Nov 18, 2021 | Completed final sign-off Mar 2023 | 1111 California St | Metropolitan Electrical Construction | at&t: remove (e) antennas: install 6 new antennas within new frp screen with lowered walls and roof. install 8 new rrus. remove (e) cabinet. install new cabinet with batteries per 2021-004901cua.Details
at&t: remove (e) antennas: install 6 new antennas within new frp screen with lowered walls and roof. install 8 new rrus. remove (e) cabinet. install new cabinet with batteries per 2021-004901cua. | $165,000 |
| Sep 7, 2021 | Never finaled issued Apr 2022, no final | 1111 California St | Metropolitan Electrical Construction | verizon wireless- (n) spidercloud das system. (1) 19" equipment rack w/ rack mounted das equipment, 48v dc power system w/ (3) 75a rectifiers. (3) 30a/2p breakers. (26) lte radio nodes. (10) lte directional antennas. (42) 5g radio nodes. (5) switches.Details
verizon wireless- (n) spidercloud das system. (1) 19" equipment rack w/ rack mounted das equipment, 48v dc power system w/ (3) 75a rectifiers. (3) 30a/2p breakers. (26) lte radio nodes. (10) lte directional antennas. (42) 5g radio nodes. (5) switches. | $95,000 |
| Aug 30, 2021 | Completed final sign-off Nov 2021 | 1111 California St | Ideal Construction | create 5 new islands in parking garage that will accomodate new parking equipment. run a new electrical line to one island to power up new equipment. saw cut new car detection loops replace existing parking equipment.Details
create 5 new islands in parking garage that will accomodate new parking equipment. run a new electrical line to one island to power up new equipment. saw cut new car detection loops replace existing parking equipment. | $12,000 |
| Sep 4, 2020 | Expired or cancelled cancelled Jan 2026 | 1111 California St | interior demo of ( e ) non-bearing partitions, construct ( n ) private offices, renovate ( e ) toilet rooms, mep scope under separate permitDetails
interior demo of ( e ) non-bearing partitions, construct ( n ) private offices, renovate ( e ) toilet rooms, mep scope under separate permit | $75,000 | |
| Mar 2, 2020 | Expired or cancelled withdrawn Nov 2021 | 1111 California St | remove/replace 1(e) repeater antenna w/ 1(n) gps antenna on (e)roof mount, remove/replace 1(e) vzw wall-mounted equip cabinet w/ 1(n) vzw flr mounted 19" rack, install 1(n) fiber cable from fiber dmarc location to (e) vzw equip location, relocate (e)das equip & install (n)equip inside (n) 19" rack,Details
remove/replace 1(e) repeater antenna w/ 1(n) gps antenna on (e)roof mount, remove/replace 1(e) vzw wall-mounted equip cabinet w/ 1(n) vzw flr mounted 19" rack, install 1(n) fiber cable from fiber dmarc location to (e) vzw equip location, relocate (e)das equip & install (n)equip inside (n) 19" rack, | $18,500 | |
| Jan 4, 2019 | Completed final sign-off Aug 2019 | 1111 California St | Madden Plumbing, Llc | extend 50 extg pendent fier sprinkler head to new ceiling height. ref app#201803052860Details
extend 50 extg pendent fier sprinkler head to new ceiling height. ref app#201803052860 | $18,000 |
| Nov 9, 2018 | Completed final sign-off Oct 2019 | 1111 California St | Bay Alarm Company | show modification of fire alarm system due to t.i on exhibit hall floor only. ref #201803052860.Details
show modification of fire alarm system due to t.i on exhibit hall floor only. ref #201803052860. | $14,500 |
| Oct 10, 2018 | Completed final sign-off May 2022 | 1111 California St | Electric Tech Construction Inc | at&t mobility - install 2 (n) rrus; 2 (n) diplexers; remove unused equipment; no change to antennas; no change to batteriesDetails
at&t mobility - install 2 (n) rrus; 2 (n) diplexers; remove unused equipment; no change to antennas; no change to batteries | $11,000 |
| Mar 5, 2018 | Completed final sign-off Sep 2019 | 1111 California St | Bradford Construction | interior remodel of ground floor open assembly space. new improvements to include: event, social & supporting spaces. updated hvac, lighting and framing as indicated. fire protection under sep permit. no change to bld footprint or structure. no exterior work.Details
interior remodel of ground floor open assembly space. new improvements to include: event, social & supporting spaces. updated hvac, lighting and framing as indicated. fire protection under sep permit. no change to bld footprint or structure. no exterior work. | $557,400 |
| Jul 13, 2017 | Never finaled issued Jul 2017, no final | 1111 California St | street spaceDetails
street space | ||
| Jan 13, 2017 | Completed final sign-off Apr 2018 | 1111 California St | Electric Tech Construction Inc | modification to (e) micro cell sitee. remove 2 (e) antennas. add 1 new antenna at new location. add 6 rrus, 4 diplexers, 1 gps antenna and 2 panel cabinets.Details
modification to (e) micro cell sitee. remove 2 (e) antennas. add 1 new antenna at new location. add 6 rrus, 4 diplexers, 1 gps antenna and 2 panel cabinets. | $25,000 |
| May 16, 2016 | Completed final sign-off Feb 2017 | 1111 California St | Gci, Inc | title 24 for pa 2015-1217-5368Details
title 24 for pa 2015-1217-5368 | $5,000 |
| Jan 12, 2016 | Expired or cancelled withdrawn Feb 2024 | 1111 California St | t-mobile wireless proposes to install a temporary wireless telecommunicaitons facility on a bldg facade for (3) monts. the scope will ocnsist of : install (1) new 4'-0" antenna on a new mounting mast, & (1) new ericsson rru-11s located adjacent to proposed antenna.Details
t-mobile wireless proposes to install a temporary wireless telecommunicaitons facility on a bldg facade for (3) monts. the scope will ocnsist of : install (1) new 4'-0" antenna on a new mounting mast, & (1) new ericsson rru-11s located adjacent to proposed antenna. | $20,000 | |
| Dec 17, 2015 | Completed final sign-off Feb 2017 | 1111 California St | Gci, Inc | interior demolition of extg non-load bearing partitions to enlarge an extg confernece room, build new private office and open areas for new workstations, new works station configurations (mep scope of work under separate permits)Details
interior demolition of extg non-load bearing partitions to enlarge an extg confernece room, build new private office and open areas for new workstations, new works station configurations (mep scope of work under separate permits) | $125,000 |
| Aug 22, 2014 | Never finaled issued Aug 2014, no final | 1111 California St | Westates Mechanical Corporation Inc | relocate 15 fire sprinkler pendent heads in the kitchen exhibition level. ref app#201407080700Details
relocate 15 fire sprinkler pendent heads in the kitchen exhibition level. ref app#201407080700 | $7,800 |
| Aug 7, 2014 | Completed final sign-off Sep 2014 | 1111 California St | Aspen Constrution, Inc., | provide electrical, lighting and plumbing for kitchen remodel. ref. appl. 2014.0708.0700.Details
provide electrical, lighting and plumbing for kitchen remodel. ref. appl. 2014.0708.0700. | $50,000 |
| Jul 8, 2014 | Completed final sign-off Sep 2014 | 1111 California St | Aspen Builders Inc. | remodel existing kitchen to include replacement of existing ceiling, installation of new kitchen fixtures and relocation of existing kitchen fixtures.Details
remodel existing kitchen to include replacement of existing ceiling, installation of new kitchen fixtures and relocation of existing kitchen fixtures. | $100,000 |
| May 15, 2014 | Completed final sign-off Aug 2014 | 1111 California St | Bay Alarm Company | add one horn/strobe, delete 1 and relocate 1 strobe. also install 7 mom mods to monitor new sprinkler devices added in app#201403120531; one strobe added, 7 monitor module, water flow & tamper switch per floor for new sprinkler riserDetails
add one horn/strobe, delete 1 and relocate 1 strobe. also install 7 mom mods to monitor new sprinkler devices added in app#201403120531; one strobe added, 7 monitor module, water flow & tamper switch per floor for new sprinkler riser | $4,500 |
| Apr 24, 2014 | Completed final sign-off Dec 2014 | 1111 California St | Electric Tech Construction Inc | add new 2.5 batteries inside (e) nv bbu cabinet, add new 2.5 equip inside (e) mmbs cabinet, remove & replace (e) sprint nv antenna with 1 new sprint tri-band antenna at sector a. add 1 new 2.5 rrh, add new coax jumper lines from rru to new antenna, add new coax shield below antenna.Details
add new 2.5 batteries inside (e) nv bbu cabinet, add new 2.5 equip inside (e) mmbs cabinet, remove & replace (e) sprint nv antenna with 1 new sprint tri-band antenna at sector a. add 1 new 2.5 rrh, add new coax jumper lines from rru to new antenna, add new coax shield below antenna. | $20,000 |
| Mar 12, 2014 | Completed final sign-off Aug 2014 | 1111 California St | Westates Mechanical Corporation Inc | 1)replace extg backflow at ground floor. 2) add 3" hose standpipe at extg stair #4. 3)add new 406 pendents, 158 upright, 15 sidewall head on level 1 through 4. 4)relocate 14 and add 2 pendents at ground floor.Details
1)replace extg backflow at ground floor. 2) add 3" hose standpipe at extg stair #4. 3)add new 406 pendents, 158 upright, 15 sidewall head on level 1 through 4. 4)relocate 14 and add 2 pendents at ground floor. | $304,802 |
| Jan 28, 2014 | Never finaled issued Jan 2014, no final | 1111 California St | street spaceDetails
street space | ||
| Oct 26, 2012 | Completed final sign-off Jul 2015 | 1111 California St | Overland Contracting Inc | sprint wireless modification: replace (1) existing panel antenna on facade with (1) new panel antenna on penthouse, replace (3) equipment cabinets with (2) new equipment cabinets inside roof penthouse.Details
sprint wireless modification: replace (1) existing panel antenna on facade with (1) new panel antenna on penthouse, replace (3) equipment cabinets with (2) new equipment cabinets inside roof penthouse. | $45,000 |
| Apr 8, 2011 | Completed final sign-off Apr 2014 | 1111 California St | Rcm Fire Protection Inc. | to replace 2,300 old heads with (n) heads. old sprinklers heads are 1/2" orif. 160 degree, reliable(made in 1957). (n) sprinkler heads will be 1/2" orif. 155 degree, viking (sin:vk-100 upright & vk-102-pendant) replace all sprinkler heads on 5 levels of parking & entire 1st. flr.(off exhibit space)Details
to replace 2,300 old heads with (n) heads. old sprinklers heads are 1/2" orif. 160 degree, reliable(made in 1957). (n) sprinkler heads will be 1/2" orif. 155 degree, viking (sin:vk-100 upright & vk-102-pendant) replace all sprinkler heads on 5 levels of parking & entire 1st. flr.(off exhibit space) | $80,000 |
| Mar 3, 2011 | Completed final sign-off Mar 2012 | 1111 California St | Capital Tower & Communications | remove one (e) t-moble equipment cabinet and replace with one (n) t-moble equipment in the same location on roof.Details
remove one (e) t-moble equipment cabinet and replace with one (n) t-moble equipment in the same location on roof. | $3,500 |
| Aug 19, 2010 | Completed final sign-off Aug 2014 | 1111 California St | Aspen Builders Inc. | improve(e)masonic auditiorium bldg incl add restrooms on grnd fl, remodel (e)bathrms on 1st fl,(n)food service areas on grnd & 1st flr w/ mech/plumb work,(n)removable platform in auditorium &(n)finishes on grnd, 1st,2nd flrs. occupant load verification. elec, fire alarm & sprinkler sep permitDetails
improve(e)masonic auditiorium bldg incl add restrooms on grnd fl, remodel (e)bathrms on 1st fl,(n)food service areas on grnd & 1st flr w/ mech/plumb work,(n)removable platform in auditorium &(n)finishes on grnd, 1st,2nd flrs. occupant load verification. elec, fire alarm & sprinkler sep permit | $990,000 |
| Jul 13, 2010 | Never finaled issued Jul 2010, no final | 1111 California St | street spaceDetails
street space | ||
| May 13, 2010 | Completed final sign-off Sep 2010 | 1111 California St | A A Quality Construction | demo (e) 2 concrete islands on 1st floor of (e) garage & replace with 3 concrete islands onktop of (e) slab to provide 2 engress lanes & lane of traffic, new islands will support accessible parking control equipment. sepertate electrical permit for conduit between islandsDetails
demo (e) 2 concrete islands on 1st floor of (e) garage & replace with 3 concrete islands onktop of (e) slab to provide 2 engress lanes & lane of traffic, new islands will support accessible parking control equipment. sepertate electrical permit for conduit between islands | $17,200 |
| Apr 7, 2010 | Never finaled filed Apr 2010, never issued | 1111 California St | improvements to (e) bldg. to include additions of (n) restrooms & (n) commercial kitchen on ground flr., remodel (e) bathrooms on 1st. flr., (n) food service area on ground & 1st. flrs. w/corresponding mech. and plumbing (design build) work.Details
improvements to (e) bldg. to include additions of (n) restrooms & (n) commercial kitchen on ground flr., remodel (e) bathrooms on 1st. flr., (n) food service area on ground & 1st. flrs. w/corresponding mech. and plumbing (design build) work. | $780,000 | |
| Mar 23, 2010 | Expired or cancelled withdrawn Dec 2010 | 1111 California St | Pinnacle Wireless Usa Inc. | a modification to an (e) unmanned telecommunication facility consisting o fadding (1) (n) rru cabinet to the (e) bldg parapet & adding (n) fiber lines to the (e) 3518 rbs cabinet.Details
a modification to an (e) unmanned telecommunication facility consisting o fadding (1) (n) rru cabinet to the (e) bldg parapet & adding (n) fiber lines to the (e) 3518 rbs cabinet. | $25,000 |
| May 27, 2008 | Expired or cancelled suspend Mar 2009 | 1111 California St | improvements to the (e) masonic auditorium include changes in the main auditorium, back stage support area & grd floor. a new terraced standing area in the auditorium will be added for performances. replacing (e) seating. modify areas of several support rooms @ back stage. expanded storage at grd flDetails
improvements to the (e) masonic auditorium include changes in the main auditorium, back stage support area & grd floor. a new terraced standing area in the auditorium will be added for performances. replacing (e) seating. modify areas of several support rooms @ back stage. expanded storage at grd fl | $780,000 | |
| Jun 29, 2006 | Completed final sign-off Nov 2006 | 1111 California St | Metropolitan Electrical Construction | addition of one radio cabinet and replacement of (e) antenna.Details
addition of one radio cabinet and replacement of (e) antenna. | $5,000 |
| Jan 10, 2006 | Expired or cancelled expired Jul 2006 | 1111 California St | Bay Alarm Company | install relay modules in the 4th floor elevator mech room to provide & elevator recallDetails
install relay modules in the 4th floor elevator mech room to provide & elevator recall | $1,393 |
| Jan 18, 2005 | Completed final sign-off Mar 2005 | 1111 California St | Gci, Inc | oti-3 3rd floor meDetails
oti-3 3rd floor me | $49,000 |
| Dec 21, 2004 | Completed final sign-off Mar 2005 | 1111 California St | Bay Alarm Company | relocate 7 fire strobes and remove 1 smoke detector because of remodel. all work on 3rd floorDetails
relocate 7 fire strobes and remove 1 smoke detector because of remodel. all work on 3rd floor | $638 |
| Dec 9, 2004 | Completed final sign-off May 2005 | 1111 California St | Buchanan General Contracting Co | install&operate 1 pair of rinch omni antennas,2 micro cabinets locate east parapet .......Details
install&operate 1 pair of rinch omni antennas,2 micro cabinets locate east parapet ....... | $50,000 |
| Dec 1, 2004 | Completed final sign-off Mar 2005 | 1111 California St | Gci, Inc | oti-2,3/fl-el.Details
oti-2,3/fl-el. | $52,000 |
| Sep 22, 2004 | Completed final sign-off Mar 2005 | 1111 California St | Gci, Inc | oti-1 3/f el, me, lsDetails
oti-1 3/f el, me, ls | $350,000 |
| Mar 17, 2004 | Never finaled issued Mar 2004, no final | 1111 California St | Bay Alarm Company | t.i. install 1 smoke detector in the new 3rd floor file roomDetails
t.i. install 1 smoke detector in the new 3rd floor file room | $880 |
| Nov 5, 2002 | Expired or cancelled cancelled Jun 2026 | 1111 California St | Bay Alarm Company | fire alarm system and door access systemDetails
fire alarm system and door access system | $1,180 |
| Jun 6, 2002 | Never finaled issued Jun 2002, no final | 1111 California St | gate @ fire espcape for security,gate to be fail safe connected to bldg fire/life safety sDetails
gate @ fire espcape for security,gate to be fail safe connected to bldg fire/life safety s | $6,250 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Gci, Inc (5), Bay Alarm Company (4), Metropolitan Electrical Construction (4), Electric Tech Construction Inc (3), Aspen Builders Inc. (2), Bay Alarm Company (2), Westates Mechanical Corporation Inc (2), A A Quality Construction, Alamo Lighting, Aspen Constrution, Inc.,, Bradford Construction, Buchanan General Contracting Co, Capital Tower & Communications, Endeavor Wireless Construction Inc, Fluoresco Services Llc/Everbrite West Ll, Ideal Construction, Madden Plumbing, Llc, Mastec Network Solutions Inc, Modus Rex Llc, Overland Contracting Inc, Pinnacle Wireless Usa Inc., Rcm Fire Protection Inc., Unlimited Communications, Well Design Dba Well Design Premium Sign
- Architects
- Clark D. Manus (2), Daniel Ewald, Richard Sambucetti, Sanjay Pandya, Shervin Tajbaksh, Wissam Zalzali
- Engineers
- James R. Spore (2), Adam Amortnont, Anderson Rowe & Buckley, Billy Musgrave, Brett Mccomb, Charles Koester, Chris Lee, Chris S Lee, Cliff A. Abernathy, Daniel Connell, Eric Uhrenholt, James R. Spore, Jeffrey Rome, Jesus Cabellon Jr., John Anderson Jr., Kari Nelson, Pb Telecom, Wells Holmes
- Authorized agent-otherss
- Serena Jang
- Designers
- Neil Colwell