Ideal Construction
- Based in
- Concord
- On San Francisco permits
- Aug 2021 to Jun 2025
- Last 24 months
- 1 permit filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 27, 2025 | Completed final sign-off Nov 2025 | 632 Fell St | unit 3: remodel kitchen and bathroom. tub,toilet, vanity. remain in exact same location. range (gasoline) and sink water/waste lines to remain same location. upgrade electrical throughout.Details
unit 3: remodel kitchen and bathroom. tub,toilet, vanity. remain in exact same location. range (gasoline) and sink water/waste lines to remain same location. upgrade electrical throughout. | $26,000 |
| Feb 3, 2022 | Completed final sign-off Jan 2023 | 632 Fell St | unit #4: remodel kitchen and bath. kitchen moves from back room to front room and back room becomes bedroom push door wall in bathroom foward to slightly expand bathroom update electrical and plumbing unit only no exterior work no structural/load bearing walls.Details
unit #4: remodel kitchen and bath. kitchen moves from back room to front room and back room becomes bedroom push door wall in bathroom foward to slightly expand bathroom update electrical and plumbing unit only no exterior work no structural/load bearing walls. | $45,000 |
| Aug 30, 2021 | Completed final sign-off Nov 2021 | 1111 California St | create 5 new islands in parking garage that will accomodate new parking equipment. run a new electrical line to one island to power up new equipment. saw cut new car detection loops replace existing parking equipment.Details
create 5 new islands in parking garage that will accomodate new parking equipment. run a new electrical line to one island to power up new equipment. saw cut new car detection loops replace existing parking equipment. | $12,000 |