Jorge Maezono
- Listed as
- architect
- Firm
- Maezono Architecture
- Based in
- Berkeley
- On San Francisco permits
- Jan 2006 to Apr 2021
6 permits since 2000 (architect on 6 permits): 5 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 14, 2021 | Completed final sign-off Mar 2022 | 24 Dearborn St | 415 Remodeling Inc, North South Pacific Construction Inc | kitchen remodel. new appliances, cabinetry, lighting, electrical, plumbing. remove partial wall.Details
kitchen remodel. new appliances, cabinetry, lighting, electrical, plumbing. remove partial wall. | $30,000 |
| Dec 12, 2018 | Completed final sign-off Jan 2021 | 1318 Plymouth Av | Chl Construction Company | add 972 sf heated space in basement, replace all windows, add 3 new windows, sliding door,new skylights, int removel kitchen and baht, new stairway in basement/1st fl, new patio in rear, lower basement fl, new furnace, not hot waterDetails
add 972 sf heated space in basement, replace all windows, add 3 new windows, sliding door,new skylights, int removel kitchen and baht, new stairway in basement/1st fl, new patio in rear, lower basement fl, new furnace, not hot water | $250,000 |
| Jan 4, 2018 | Never finaled issued Jan 2018, no final | 1225 04th St | Corinthian Contractors | 1st time tenant improvement - ups store - all interior work- new cabientry & finishes, new mech, elect work, ada restroom to be completed, new ceiling, new attic storage.Details
1st time tenant improvement - ups store - all interior work- new cabientry & finishes, new mech, elect work, ada restroom to be completed, new ceiling, new attic storage. | $50,000 |
| Jan 14, 2015 | Completed final sign-off Feb 2015 | 4104 24th St | Corinthian Contractors | revisions to concrete footing and framing, revision to appn. 201412249856.Details
revisions to concrete footing and framing, revision to appn. 201412249856. | $2,500 |
| Jul 29, 2013 | Completed final sign-off Aug 2013 | 222 Mason St | Corinthian Contractors | all interior work. no exterior wall/roof affected. install equipment cabinetry, new use from office to retail. no sprinkler change, move 1 diffuser, new electric outletsDetails
all interior work. no exterior wall/roof affected. install equipment cabinetry, new use from office to retail. no sprinkler change, move 1 diffuser, new electric outlets | $35,000 |
| Jan 9, 2006 | Completed final sign-off Nov 2008 | 1260 Funston Av | convert one unit into two units. add 3rd floor. rear expansion. add parking (one) to existing garage. street wall to be altered.Details
convert one unit into two units. add 3rd floor. rear expansion. add parking (one) to existing garage. street wall to be altered. | $500,000 |