Block 0326, lot 020
222 Mason St
- City’s use
- Commercial Hotel
- Built
- 1987
- Stories
- 31
- Units
- 529
- Rooms
- 529 bedrooms, 541 bathrooms
- Building
- 574,080 sq ft
- Lot
- 6,348 sq ft
- Zoning
- C3G
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
29 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 22, 2020 | Completed final sign-off Dec 2021 | 222 Mason St | Continental Contractors Inc | renovation of guest bathrooms on l6-l12 and 14-21. slective demo and installation of finishes, doors, bathroom accessories, light fixtures and plumbing fixtures.Details
renovation of guest bathrooms on l6-l12 and 14-21. slective demo and installation of finishes, doors, bathroom accessories, light fixtures and plumbing fixtures. | $896,000 |
| Feb 3, 2017 | Completed final sign-off Feb 2017 | 222 Mason St | Westates Mechanical Corporation Inc | add 33 pendents, relocate 43 pendents and 61 sidewall heads. total is 132 sprinklers. t.i. app#201606139805.Details
add 33 pendents, relocate 43 pendents and 61 sidewall heads. total is 132 sprinklers. t.i. app#201606139805. | $72,600 |
| Oct 28, 2016 | Completed final sign-off May 2017 | 222 Mason St | Cahill Contractors Llc. | 2/f 3/f- work includes remodel of select public space areas specially lobby & meeting rooms, selective demo and install walls, ceiling, light fixtures & finishes. no exterior work or change in occupancy. fire, life safety under seperate permit.Details
2/f 3/f- work includes remodel of select public space areas specially lobby & meeting rooms, selective demo and install walls, ceiling, light fixtures & finishes. no exterior work or change in occupancy. fire, life safety under seperate permit. | $108,000 |
| Jun 9, 2016 | Completed final sign-off Mar 2017 | 222 Mason St | remove and replace extg topping slabs in 2nd and 3rd floor kitchen floors. installation of trench drains over extg floor drains, and refinishing walls and ceilings. no change in occupancy or area. kitchen equipment replaced in-kind.Details
remove and replace extg topping slabs in 2nd and 3rd floor kitchen floors. installation of trench drains over extg floor drains, and refinishing walls and ceilings. no change in occupancy or area. kitchen equipment replaced in-kind. | $30,000 | |
| May 12, 2016 | Completed final sign-off Apr 2017 | 222 Mason St | Goike Construction Management | deferred submittal of title 24 drawings to pool renovation project interior and exterior ref pa 2015-1001-8549 and 2016-0619-9436 mhc engineering (t-24 drawings) mcmillan electricDetails
deferred submittal of title 24 drawings to pool renovation project interior and exterior ref pa 2015-1001-8549 and 2016-0619-9436 mhc engineering (t-24 drawings) mcmillan electric | |
| Jan 21, 2016 | Expired or cancelled cancelled Jan 2026 | 222 Mason St | Goike Construction Management | revision to pa#201510018549Details
revision to pa#201510018549 | |
| Dec 21, 2015 | Completed final sign-off Apr 2017 | 222 Mason St | Goike Construction Management | revision to app#2015-1001-8549 - 5th floor: new pool coping and water line tile. new stairs into pool. ada lift station install at hot tub. minor pool equipment or controls.Details
revision to app#2015-1001-8549 - 5th floor: new pool coping and water line tile. new stairs into pool. ada lift station install at hot tub. minor pool equipment or controls. | $65,000 |
| Oct 1, 2015 | Completed final sign-off Apr 2017 | 222 Mason St | Goike Construction Management | 5th floor interor pool deck renovation including (n) pool deck paver flooring; (n) interior finishes; extension of pool deck via enclosure of (e) exterior balconies; mep upgrades. l/s, sprinklers deferredDetails
5th floor interor pool deck renovation including (n) pool deck paver flooring; (n) interior finishes; extension of pool deck via enclosure of (e) exterior balconies; mep upgrades. l/s, sprinklers deferred | $425,000 |
| Jul 16, 2015 | Completed final sign-off May 2016 | 222 Mason St | Goike Construction Management | service kitchen remodel for cafe on 1st floor. install ventless cooking appliance. n/a for maher.Details
service kitchen remodel for cafe on 1st floor. install ventless cooking appliance. n/a for maher. | $15,000 |
| Jun 22, 2015 | Completed final sign-off Jan 2018 | 222 Mason St | Goike Construction Management | modification to (e) 3' seismic joint at floors 3,4 & 5 as part of a voluntary seismic retrofit. work includes lengthening beam seats at 3rd 4th & 5th flrs from pool structure to the tower structure, cutting slab at pool to struture around columns & associated finish removal & replacements.Details
modification to (e) 3' seismic joint at floors 3,4 & 5 as part of a voluntary seismic retrofit. work includes lengthening beam seats at 3rd 4th & 5th flrs from pool structure to the tower structure, cutting slab at pool to struture around columns & associated finish removal & replacements. | $175,000 |
| Jun 19, 2015 | Completed final sign-off Apr 2017 | 222 Mason St | Goike Construction Management | 5/f: reroofing of (e) roof deck, partial demolitoin of (e) storefront for (n) storefront entrances, (n) ext. roof deck w/paver assembly.Details
5/f: reroofing of (e) roof deck, partial demolitoin of (e) storefront for (n) storefront entrances, (n) ext. roof deck w/paver assembly. | $110,000 |
| May 27, 2015 | Expired or cancelled cancelled Aug 2016 | 222 Mason St | Goike Construction Management | retroactively convert 14 parking spaces on level b3 into 6 storage areas, 5 of which will be used for bldg maintenance purposed. transfer "floor area gross" from level b3 to level 5 via parking space to bldg. maintenance storage conversion.Details
retroactively convert 14 parking spaces on level b3 into 6 storage areas, 5 of which will be used for bldg maintenance purposed. transfer "floor area gross" from level b3 to level 5 via parking space to bldg. maintenance storage conversion. | $5,000 |
| Mar 26, 2015 | Completed final sign-off May 2015 | 222 Mason St | Johnson Controls Inc. | 22nd flr: fire alarm - add new system smoke with low frequency sounder base to replace 120vac smoke, power supervision relay, relocate (e) strobes and speaker(s). ref# 2014 1003 8020Details
22nd flr: fire alarm - add new system smoke with low frequency sounder base to replace 120vac smoke, power supervision relay, relocate (e) strobes and speaker(s). ref# 2014 1003 8020 | $8,500 |
| Mar 2, 2015 | Expired or cancelled cancelled Aug 2016 | 222 Mason St | Goike Construction Management | revision to app#201412173899 to remove four parking lifts and the 1 hr fire resistance rating from the boiler room enclosure(as permitted by cbc 509.4) from the scope of work.Details
revision to app#201412173899 to remove four parking lifts and the 1 hr fire resistance rating from the boiler room enclosure(as permitted by cbc 509.4) from the scope of work. | |
| Dec 17, 2014 | Expired or cancelled cancelled Aug 2016 | 222 Mason St | Goike Construction Management | level b1, b2 & b3- install (3) 5o-hp steam boilers to replace district steam source on level b2 within the existing valet parking garage and provide (4) parking lifts near new boiler enclosure. fire alarm, fire sprinkler, flue vent detail will be deferred submittal.Details
level b1, b2 & b3- install (3) 5o-hp steam boilers to replace district steam source on level b2 within the existing valet parking garage and provide (4) parking lifts near new boiler enclosure. fire alarm, fire sprinkler, flue vent detail will be deferred submittal. | $200,000 |
| Mar 28, 2014 | Completed final sign-off May 2016 | 222 Mason St | Goike Construction Management | 26th floor:1)replace heating units with high fire. boiler units. 2)install new combined heat and power units (chp). n/a for the maher ordinance #155-13Details
26th floor:1)replace heating units with high fire. boiler units. 2)install new combined heat and power units (chp). n/a for the maher ordinance #155-13 | $500,000 |
| Nov 7, 2013 | Expired or cancelled expired Aug 2021 | 222 Mason St | Goike Construction Management | renovation of 107 guestrms (flrs b2, 6-20, 21 & 23)including accessible guest rooms w/roll-in showers, replace (e) bathtubs w/showers, new plumbing fixtures, new finishes, new millwork, & new partitions,combine 2 guestrm to 1 accessible. elec,plbg,mech,fire sprinkler,fire alarm deferred submittals.Details
renovation of 107 guestrms (flrs b2, 6-20, 21 & 23)including accessible guest rooms w/roll-in showers, replace (e) bathtubs w/showers, new plumbing fixtures, new finishes, new millwork, & new partitions,combine 2 guestrm to 1 accessible. elec,plbg,mech,fire sprinkler,fire alarm deferred submittals. | $580,000 |
| Nov 7, 2013 | Completed final sign-off May 2016 | 222 Mason St | Goike Construction Management | demolitoin of existing abandoned chillers on the roof, total of 3 units, number 3, 4, 5 as referenced on plan m-1. no other work.Details
demolitoin of existing abandoned chillers on the roof, total of 3 units, number 3, 4, 5 as referenced on plan m-1. no other work. | $20,000 |
| Jul 29, 2013 | Completed final sign-off Aug 2013 | 222 Mason St | Corinthian Contractors | all interior work. no exterior wall/roof affected. install equipment cabinetry, new use from office to retail. no sprinkler change, move 1 diffuser, new electric outletsDetails
all interior work. no exterior wall/roof affected. install equipment cabinetry, new use from office to retail. no sprinkler change, move 1 diffuser, new electric outlets | $35,000 |
| Jun 19, 2013 | Completed final sign-off Jan 2014 | 222 Mason St | Johnson Controls Inc. | 5th floor fire alarm system - relocate 3 existing speaker/strobes & add two new speaker/strobes. ref pa #2013.05.14.6819Details
5th floor fire alarm system - relocate 3 existing speaker/strobes & add two new speaker/strobes. ref pa #2013.05.14.6819 | $8,000 |
| Mar 10, 2009 | Completed final sign-off Apr 2009 | 222 Mason St | Johnson Controls Inc. | add 4 ceiling mounted speaker strobes.5 ceiling mounted strobes. 9 duct smoke detectors.Details
add 4 ceiling mounted speaker strobes.5 ceiling mounted strobes. 9 duct smoke detectors. | $16,000 |
| Feb 11, 2008 | Expired or cancelled expired Nov 2009 | 222 Mason St | Dpw Inc. | modify existing sprinkler system for new walls and ceilings. we will relocate and use existing outlets for new ti work. 4 new, 3 relocates. building appl#200802042937Details
modify existing sprinkler system for new walls and ceilings. we will relocate and use existing outlets for new ti work. 4 new, 3 relocates. building appl#200802042937 | $5,000 |
| Feb 4, 2008 | Expired or cancelled expired May 2010 | 222 Mason St | remodel of (e) bar on 1st floor, adjacent to (n) cabaret approved pa#200712069880, work includes (n) equipment, fixtures, finishes, lighting. also (n) equipment in (e) pantry room. no change to mechanical. fire protection under separate permit. title 24 lighting for app# 200712069880Details
remodel of (e) bar on 1st floor, adjacent to (n) cabaret approved pa#200712069880, work includes (n) equipment, fixtures, finishes, lighting. also (n) equipment in (e) pantry room. no change to mechanical. fire protection under separate permit. title 24 lighting for app# 200712069880 | $100,000 | |
| Dec 6, 2007 | Expired or cancelled expired Jan 2011 | 222 Mason St | interior t.i. work (ist floor above grade) includes (n) partitions, (n) flooring, (n) finishes, (n) paint. (e) meeting room to become (n) lounge/cabaret. fire sprinklers, life safety & mechanical /lighting t-24 under separate permit.Details
interior t.i. work (ist floor above grade) includes (n) partitions, (n) flooring, (n) finishes, (n) paint. (e) meeting room to become (n) lounge/cabaret. fire sprinklers, life safety & mechanical /lighting t-24 under separate permit. | $250,000 | |
| Mar 14, 2006 | Expired or cancelled expired Mar 2007 | 222 Mason St | food station program. remove some partition walls-build food station with oven-replace countertop and undercounter cabinets-undercounter refrigerator and storage shelves. occupancy -49.Details
food station program. remove some partition walls-build food station with oven-replace countertop and undercounter cabinets-undercounter refrigerator and storage shelves. occupancy -49. | $20,000 | |
| Jan 25, 2005 | Expired or cancelled expired Nov 2005 | 222 Mason St | Simplex Grinnell | relocate 1 sprinkler at gift shop ceiling,fire sprinkler @g/fDetails
relocate 1 sprinkler at gift shop ceiling,fire sprinkler @g/f | $580 |
| Dec 17, 2004 | Expired or cancelled expired Nov 2005 | 222 Mason St | lower a section of main lobby counter for accessibility,new guardrail/handrails @entry ramp on masonDetails
lower a section of main lobby counter for accessibility,new guardrail/handrails @entry ramp on mason | $20,000 | |
| Nov 2, 2000 | Expired or cancelled expired Jun 2001 | 222 Mason St | fire alarm system 25th floorDetails
fire alarm system 25th floor | $15,000 | |
| Sep 13, 2000 | Completed final sign-off Feb 2001 | 222 Mason St | one-stop, remodel restaurant on 2nd floor, new sushi bar,renovate existing restrooms on 2nd floorDetails
one-stop, remodel restaurant on 2nd floor, new sushi bar,renovate existing restrooms on 2nd floor | $150,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.