Permit GraphShortlistSan Francisco building permits since 2000

Goike Construction Management

Contractor license
900970
State license record
Based in
South San Francisco
On San Francisco permits
Apr 2011 to Oct 2018
Last 24 months
0 permits filed

22 permits since 2000: 13 completed, 2 never finaled, 7 expired or cancelled.

Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Most recent permits

AllRoof deck 1Deck 1Stairs 1Kitchen remodel 1
FiledOutcomeAddressWork described on the permitDeclared cost
Oct 4, 2018Never finaled
issued Nov 2018, no final
222 Mason St5th flr. hotel office remodel and will incl selective demo and installation of doors, walls, ceilings, lights fixtures. no exterior work or change of occupancy. fire life safety and mep under separate permit
Details
Permit
201810042359
Status
issued
Filed
Oct 4, 2018
Permit issued
Nov 7, 2018
Declared cost
$4,000
Address
222 Mason St

5th flr. hotel office remodel and will incl selective demo and installation of doors, walls, ceilings, lights fixtures. no exterior work or change of occupancy. fire life safety and mep under separate permit

Open the permit page

$4,000
Feb 3, 2017Completed
final sign-off Apr 2017
222 Mason Stthe scope of work is to rebuild the accesible curb cut from the porte cochere to the hotel lobby. create a passenger loading area and install new ada signage. no change in occupancy, use or egress. fire safety under separate permit. n/a maher
Details
Permit
201702038587
Status
complete
Filed
Feb 3, 2017
Permit issued
Mar 6, 2017
Final sign-off
Apr 4, 2017
Declared cost
$22,000
Address
222 Mason St

the scope of work is to rebuild the accesible curb cut from the porte cochere to the hotel lobby. create a passenger loading area and install new ada signage. no change in occupancy, use or egress. fire safety under separate permit. n/a maher

Open the permit page

$22,000
May 12, 2016Completed
final sign-off Apr 2017
222 Mason Stdeferred submittal of title 24 drawings to pool renovation project interior and exterior ref pa 2015-1001-8549 and 2016-0619-9436 mhc engineering (t-24 drawings) mcmillan electric
Details
Permit
201605127271
Status
complete
Filed
May 12, 2016
Permit issued
May 13, 2016
Final sign-off
Apr 7, 2017
Address
222 Mason St

deferred submittal of title 24 drawings to pool renovation project interior and exterior ref pa 2015-1001-8549 and 2016-0619-9436 mhc engineering (t-24 drawings) mcmillan electric

Open the permit page

Jan 21, 2016Expired or cancelled
cancelled Jan 2026
222 Mason Strevision to pa#201510018549
Details
Permit
201601217658
Status
cancelled
Filed
Jan 21, 2016
Address
222 Mason St

revision to pa#201510018549

Open the permit page

Dec 21, 2015Completed
final sign-off Apr 2017
222 Mason Strevision to app#2015-1001-8549 - 5th floor: new pool coping and water line tile. new stairs into pool. ada lift station install at hot tub. minor pool equipment or controls.
Details
Permit
201512215662
Status
complete
Filed
Dec 21, 2015
Permit issued
Jan 25, 2016
Final sign-off
Apr 7, 2017
Declared cost
$65,000
Address
222 Mason St

revision to app#2015-1001-8549 - 5th floor: new pool coping and water line tile. new stairs into pool. ada lift station install at hot tub. minor pool equipment or controls.

Open the permit page

$65,000
Oct 1, 2015Completed
final sign-off Apr 2017
222 Mason St5th floor interor pool deck renovation including (n) pool deck paver flooring; (n) interior finishes; extension of pool deck via enclosure of (e) exterior balconies; mep upgrades. l/s, sprinklers deferred
Details
Permit
201510018549
Status
complete
Filed
Oct 1, 2015
Permit issued
Dec 2, 2015
Final sign-off
Apr 7, 2017
Declared cost
$425,000
Address
222 Mason St

5th floor interor pool deck renovation including (n) pool deck paver flooring; (n) interior finishes; extension of pool deck via enclosure of (e) exterior balconies; mep upgrades. l/s, sprinklers deferred

Open the permit page

$425,000
Sep 25, 2015Completed
final sign-off Feb 2016
2790 19th Avto complete work under approved permit application #201206192871.
Details
Permit
201509258150
Status
complete
Filed
Sep 25, 2015
Permit issued
Sep 25, 2015
Final sign-off
Feb 29, 2016
Declared cost
$10,000
Address
2790 19th Av

to complete work under approved permit application #201206192871.

Open the permit page

$10,000
Jul 16, 2015Completed
final sign-off May 2016
222 Mason Stservice kitchen remodel for cafe on 1st floor. install ventless cooking appliance. n/a for maher.
Details
Permit
201507161730
Status
complete
Filed
Jul 16, 2015
Permit issued
Aug 6, 2015
Final sign-off
May 27, 2016
Declared cost
$15,000
Address
222 Mason St

service kitchen remodel for cafe on 1st floor. install ventless cooking appliance. n/a for maher.

Open the permit page

$15,000
Jun 22, 2015Completed
final sign-off Jan 2018
222 Mason Stmodification to (e) 3' seismic joint at floors 3,4 & 5 as part of a voluntary seismic retrofit. work includes lengthening beam seats at 3rd 4th & 5th flrs from pool structure to the tower structure, cutting slab at pool to struture around columns & associated finish removal & replacements.
Details
Permit
201506229527
Status
complete
Filed
Jun 22, 2015
Permit issued
Dec 2, 2015
Final sign-off
Jan 31, 2018
Declared cost
$175,000
Address
222 Mason St

modification to (e) 3' seismic joint at floors 3,4 & 5 as part of a voluntary seismic retrofit. work includes lengthening beam seats at 3rd 4th & 5th flrs from pool structure to the tower structure, cutting slab at pool to struture around columns & associated finish removal & replacements.

Open the permit page

$175,000
Jun 19, 2015Completed
final sign-off Apr 2017
222 Mason St5/f: reroofing of (e) roof deck, partial demolitoin of (e) storefront for (n) storefront entrances, (n) ext. roof deck w/paver assembly.
Details
Permit
201506199436
Status
complete
Filed
Jun 19, 2015
Permit issued
Jul 7, 2015
Final sign-off
Apr 7, 2017
Declared cost
$110,000
Address
222 Mason St

5/f: reroofing of (e) roof deck, partial demolitoin of (e) storefront for (n) storefront entrances, (n) ext. roof deck w/paver assembly.

Open the permit page

$110,000
May 27, 2015Expired or cancelled
cancelled Aug 2016
222 Mason Stretroactively convert 14 parking spaces on level b3 into 6 storage areas, 5 of which will be used for bldg maintenance purposed. transfer "floor area gross" from level b3 to level 5 via parking space to bldg. maintenance storage conversion.
Details
Permit
201505277322
Status
cancelled
Filed
May 27, 2015
Permit issued
Jun 18, 2015
Declared cost
$5,000
Address
222 Mason St

retroactively convert 14 parking spaces on level b3 into 6 storage areas, 5 of which will be used for bldg maintenance purposed. transfer "floor area gross" from level b3 to level 5 via parking space to bldg. maintenance storage conversion.

Open the permit page

$5,000
Mar 2, 2015Expired or cancelled
cancelled Aug 2016
222 Mason Strevision to app#201412173899 to remove four parking lifts and the 1 hr fire resistance rating from the boiler room enclosure(as permitted by cbc 509.4) from the scope of work.
Details
Permit
201503029664
Status
cancelled
Filed
Mar 2, 2015
Permit issued
Mar 9, 2015
Address
222 Mason St

revision to app#201412173899 to remove four parking lifts and the 1 hr fire resistance rating from the boiler room enclosure(as permitted by cbc 509.4) from the scope of work.

Open the permit page

Dec 17, 2014Expired or cancelled
cancelled Aug 2016
222 Mason Stlevel b1, b2 & b3- install (3) 5o-hp steam boilers to replace district steam source on level b2 within the existing valet parking garage and provide (4) parking lifts near new boiler enclosure. fire alarm, fire sprinkler, flue vent detail will be deferred submittal.
Details
Permit
201412173899
Status
cancelled
Filed
Dec 17, 2014
Permit issued
Dec 19, 2014
Declared cost
$200,000
Address
222 Mason St

level b1, b2 & b3- install (3) 5o-hp steam boilers to replace district steam source on level b2 within the existing valet parking garage and provide (4) parking lifts near new boiler enclosure. fire alarm, fire sprinkler, flue vent detail will be deferred submittal.

Open the permit page

$200,000
Oct 3, 2014Never finaled
issued Oct 2014, no final
222 Mason Strevision to 201311071358 - remove accessible guest room types cqs and pk addition of accessible guest room type nd and revision to number and locations of existing accessible guest room type q with roll-in shower upgrade. n/a maher ordinance
Details
Permit
201410038020
Status
issued
Filed
Oct 3, 2014
Permit issued
Oct 17, 2014
Address
222 Mason St

revision to 201311071358 - remove accessible guest room types cqs and pk addition of accessible guest room type nd and revision to number and locations of existing accessible guest room type q with roll-in shower upgrade. n/a maher ordinance

Open the permit page

Jul 11, 2014Expired or cancelled
expired Aug 2021
222 Mason St25th fl. control upgrades to 4 air handlers. replace 25 vav terminals with new controls
Details
Permit
201407111096
Status
expired
Filed
Jul 11, 2014
Permit issued
Jul 2, 2015
Declared cost
$75,000
Address
222 Mason St

25th fl. control upgrades to 4 air handlers. replace 25 vav terminals with new controls

Open the permit page

$75,000
Jul 11, 2014Expired or cancelled
expired Aug 2021
222 Mason Stgas meter room upgrade. gas monitor and new exhaust fan. maher not req
Details
Permit
201407111100
Status
expired
Filed
Jul 11, 2014
Permit issued
May 20, 2016
Declared cost
$6,000
Address
222 Mason St

gas meter room upgrade. gas monitor and new exhaust fan. maher not req

Open the permit page

$6,000
Mar 28, 2014Completed
final sign-off May 2016
222 Mason St26th floor:1)replace heating units with high fire. boiler units. 2)install new combined heat and power units (chp). n/a for the maher ordinance #155-13
Details
Permit
201403281904
Status
complete
Filed
Mar 28, 2014
Permit issued
Apr 15, 2014
Final sign-off
May 4, 2016
Declared cost
$500,000
Address
222 Mason St

26th floor:1)replace heating units with high fire. boiler units. 2)install new combined heat and power units (chp). n/a for the maher ordinance #155-13

Open the permit page

$500,000
Nov 7, 2013Expired or cancelled
expired Aug 2021
222 Mason Strenovation of 107 guestrms (flrs b2, 6-20, 21 & 23)including accessible guest rooms w/roll-in showers, replace (e) bathtubs w/showers, new plumbing fixtures, new finishes, new millwork, & new partitions,combine 2 guestrm to 1 accessible. elec,plbg,mech,fire sprinkler,fire alarm deferred submittals.
Details
Permit
201311071358
Status
expired
Filed
Nov 7, 2013
Permit issued
Nov 19, 2013
Declared cost
$580,000
Address
222 Mason St

renovation of 107 guestrms (flrs b2, 6-20, 21 & 23)including accessible guest rooms w/roll-in showers, replace (e) bathtubs w/showers, new plumbing fixtures, new finishes, new millwork, & new partitions,combine 2 guestrm to 1 accessible. elec,plbg,mech,fire sprinkler,fire alarm deferred submittals.

Open the permit page

$580,000
Nov 7, 2013Completed
final sign-off May 2016
222 Mason Stdemolitoin of existing abandoned chillers on the roof, total of 3 units, number 3, 4, 5 as referenced on plan m-1. no other work.
Details
Permit
201311071382
Status
complete
Filed
Nov 7, 2013
Permit issued
Nov 19, 2013
Final sign-off
May 27, 2016
Declared cost
$20,000
Address
222 Mason St

demolitoin of existing abandoned chillers on the roof, total of 3 units, number 3, 4, 5 as referenced on plan m-1. no other work.

Open the permit page

$20,000
May 14, 2013Completed
final sign-off Aug 2013
222 Mason St6th floor:voluntary conversion of 1 accessible guest room to 1 accessible guest room with a roll in shower, and to make other modifications necessary to enhandle accessibility.
Details
Permit
201305146820
Status
complete
Filed
May 14, 2013
Permit issued
May 14, 2013
Final sign-off
Aug 2, 2013
Declared cost
$3,000
Address
222 Mason St

6th floor:voluntary conversion of 1 accessible guest room to 1 accessible guest room with a roll in shower, and to make other modifications necessary to enhandle accessibility.

Open the permit page

$3,000
May 14, 2013Completed
final sign-off Jan 2014
222 Mason St5th floor:partial demolition and refurbishment of extg back of house office on the 5th floor of the hotel nikko.
Details
Permit
201305146819
Status
complete
Filed
May 14, 2013
Permit issued
May 23, 2013
Final sign-off
Jan 22, 2014
Declared cost
$49,000
Address
222 Mason St

5th floor:partial demolition and refurbishment of extg back of house office on the 5th floor of the hotel nikko.

Open the permit page

$49,000
Apr 22, 2011Completed
final sign-off Feb 2012
1800 Haight Stinstall approx 176 lineal ft of 4' high lifeguard wrought iron fencing and gate. fence to include sliding gate and new vegetation area as proposed
Details
Permit
201104224616
Status
complete
Filed
Apr 22, 2011
Permit issued
Jul 18, 2011
Final sign-off
Feb 23, 2012
Declared cost
$10,000
Address
1800 Haight St

install approx 176 lineal ft of 4' high lifeguard wrought iron fencing and gate. fence to include sliding gate and new vegetation area as proposed

Open the permit page

$10,000