Block 0320, lot 019
855 Geary St
- City’s use
- Commercial Misc
- Built
- 1920
- Stories
- 2
- Units
- 2
- Rooms
- 2 bathrooms
- Building
- 34,029 sq ft
- Lot
- 11,343 sq ft
- Zoning
- RC4
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
17 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 11, 2025 | Completed final sign-off Feb 2026 | 855 Geary St | Fidelity Roof Company | re roofing no hot worksDetails
re roofing no hot works | $157,287 |
| Jul 27, 2023 | Never finaled issued Aug 2023, no final | 855 Geary St | Skyline Construction | repairs to damaged and deteriorated concrete slab, beam and wall elements on level 1 and 2.Details
repairs to damaged and deteriorated concrete slab, beam and wall elements on level 1 and 2. | $60,000 |
| Jun 14, 2023 | Completed final sign-off Aug 2023 | 855 Geary St | Skyline Construction | repair damabed and deteriorated portions of the e building. specifically slab and wall and elements.Details
repair damabed and deteriorated portions of the e building. specifically slab and wall and elements. | $25,000 |
| May 18, 2023 | Completed final sign-off Oct 2023 | 855 Geary St | Skyline Construction | slab repair & provide repair details for damaged openingDetails
slab repair & provide repair details for damaged opening | $12,000 |
| Mar 21, 2023 | Completed final sign-off Jan 2024 | 855 Geary St | In Charge Energy Inc | revision to pa#: 202204132175. 1st flr installation of ev chargers within eixsting parking garage. added 2 mini-split condenser/fan coil units for the elec distribution room. added direct-current fast charging. relocated distrib. panel. misc chnages per plansDetails
revision to pa#: 202204132175. 1st flr installation of ev chargers within eixsting parking garage. added 2 mini-split condenser/fan coil units for the elec distribution room. added direct-current fast charging. relocated distrib. panel. misc chnages per plans | $60,000 |
| Mar 13, 2023 | Never finaled issued Mar 2023, no final | 855 Geary St | Skyline Construction | removal of existing striping and re-striping of ground floor garage only. memorialization of change of planning use from public to private parking; ref cua# 2022-005541Details
removal of existing striping and re-striping of ground floor garage only. memorialization of change of planning use from public to private parking; ref cua# 2022-005541 | $6,000 |
| Feb 28, 2023 | Completed final sign-off Apr 2024 | 855 Geary St | Skyline Construction | replacement parking garage entry gates and doorsDetails
replacement parking garage entry gates and doors | $95,000 |
| Jan 13, 2023 | Expired or cancelled withdrawn May 2023 | 855 Geary St | Therma Llc | install 2 water closets, 1 lavatory 1 break room sink, 1 restroom on-demand water heater, 1 flr cleanout, 1 weil duplex sump pump w/ fiber glass basin, 1 trench drain.Details
install 2 water closets, 1 lavatory 1 break room sink, 1 restroom on-demand water heater, 1 flr cleanout, 1 weil duplex sump pump w/ fiber glass basin, 1 trench drain. | $187,000 |
| Nov 7, 2022 | Never finaled filed Nov 2022, never issued | 855 Geary St | In Charge Energy Inc | install new electrical service/room, electrical equipment, pipe, wire, etc., for insall of (22) 180kw dc ev chargers & (17) 40a level 2 chargersDetails
install new electrical service/room, electrical equipment, pipe, wire, etc., for insall of (22) 180kw dc ev chargers & (17) 40a level 2 chargers | $1,100,000 |
| Sep 28, 2022 | Completed final sign-off Mar 2023 | 855 Geary St | Bilcor Inc | install (1) control pane, (4) dual monitor modules, (1) pull station, (1) smoke detector, (1) cellular communicator, (1) wall mount horn strobe, and (1) monitor module. ref pa# 202209192728Details
install (1) control pane, (4) dual monitor modules, (1) pull station, (1) smoke detector, (1) cellular communicator, (1) wall mount horn strobe, and (1) monitor module. ref pa# 202209192728 | $6,600 |
| Sep 19, 2022 | Completed final sign-off Dec 2023 | 855 Geary St | Pribuss Engineering Inc | new overhead fire sprinkler & standpipe system throughout. 418 total heads. ref t.i. pa202207259272. ref u/g pribuss fire service pa202206035536Details
new overhead fire sprinkler & standpipe system throughout. 418 total heads. ref t.i. pa202207259272. ref u/g pribuss fire service pa202206035536 | $214,000 |
| Jul 25, 2022 | Completed final sign-off May 2023 | 855 Geary St | Skyline Capital Builders Llc | 1st fl- expansion of office to include new act ceiling, non load bearing walls and finishes. remodel and add one restroom and new platform for ada lift.Details
1st fl- expansion of office to include new act ceiling, non load bearing walls and finishes. remodel and add one restroom and new platform for ada lift. | $1,500,000 |
| Jun 3, 2022 | Completed final sign-off Dec 2023 | 855 Geary St | Pribuss Engineering Inc | install 1 new 8" underground fire service from curb into building.Details
install 1 new 8" underground fire service from curb into building. | $10,000 |
| May 20, 2022 | Completed final sign-off Sep 2022 | 855 Geary St | Skyline Construction | two new vehicle lifts at basement level, and ada stair handrail upgrades. lifts are for maintenance only. no addition of new parking or alteration of striping approved under pa# 202204071820.Details
two new vehicle lifts at basement level, and ada stair handrail upgrades. lifts are for maintenance only. no addition of new parking or alteration of striping approved under pa# 202204071820. | $45,000 |
| Apr 13, 2022 | Completed final sign-off Jan 2024 | 855 Geary St | In Charge Energy Inc | basement/2 & ground floors: installation of charging infrastructure for plug-in hybrid electric vehicles, including: new electrical service & switch gear. electrical distribution equipment, ac/dc charging equipment. chargers @ gr/f to be installed in future permit.Details
basement/2 & ground floors: installation of charging infrastructure for plug-in hybrid electric vehicles, including: new electrical service & switch gear. electrical distribution equipment, ac/dc charging equipment. chargers @ gr/f to be installed in future permit. | $65,000 |
| Apr 7, 2022 | Never finaled issued Apr 2022, no final | 855 Geary St | Skyline Capital Builders Llc | change of use per planning from private parking to public parking. car share & bicycle parking at ground floor only per planning com motion no.20531. no change of use at basement or 2nd fl which remain private parking. no change of occupancy. all work is striping/barrier removal for ada parking.Details
change of use per planning from private parking to public parking. car share & bicycle parking at ground floor only per planning com motion no.20531. no change of use at basement or 2nd fl which remain private parking. no change of occupancy. all work is striping/barrier removal for ada parking. | $50,000 |
| Jul 8, 2005 | Never finaled issued Jul 2005, no final | 855 Geary St | sidewalk permitDetails
sidewalk permit |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Skyline Construction (6), In Charge Energy Inc (3), Pribuss Engineering Inc (2), Skyline Capital Builders Llc (2), Bilcor Inc, Fidelity Roof Company, Therma Llc
- Architects
- Melissa Pesci (5), Adam Hugo-Holman (2)
- Engineers
- Jimmy Lau (2), Laureano Brown (2), Adam Hugo-Holman, Gamble + Design, Matthew Myres
- Authorized agent-otherss
- Ken Wolz
- Designers
- Pribuss Engineering Inc
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.