Laureano Brown
- License
- E22776
- Electrical engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up E22776 at the Board for Professional Engineers
- Listed as
- engineer
- On San Francisco permits
- Apr 2022 to Mar 2023
2 permits since 2000 (engineer on 2 permits): 2 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- In Charge Energy Inc (2)
- Engineers
- Matthew Myres
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 0
- Other or unknown 2
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 21, 2023 | Completed final sign-off Jan 2024 | 855 Geary St | In Charge Energy Inc | revision to pa#: 202204132175. 1st flr installation of ev chargers within eixsting parking garage. added 2 mini-split condenser/fan coil units for the elec distribution room. added direct-current fast charging. relocated distrib. panel. misc chnages per plansDetails
revision to pa#: 202204132175. 1st flr installation of ev chargers within eixsting parking garage. added 2 mini-split condenser/fan coil units for the elec distribution room. added direct-current fast charging. relocated distrib. panel. misc chnages per plans | $60,000 |
| Apr 13, 2022 | Completed final sign-off Jan 2024 | 855 Geary St | In Charge Energy Inc | basement/2 & ground floors: installation of charging infrastructure for plug-in hybrid electric vehicles, including: new electrical service & switch gear. electrical distribution equipment, ac/dc charging equipment. chargers @ gr/f to be installed in future permit.Details
basement/2 & ground floors: installation of charging infrastructure for plug-in hybrid electric vehicles, including: new electrical service & switch gear. electrical distribution equipment, ac/dc charging equipment. chargers @ gr/f to be installed in future permit. | $65,000 |