Adam T. Hugo-Holman
- Listed as
- architect, engineer
- Firm
- Degenkolb Engineers
- Based in
- San Francisco
- On San Francisco permits
- Sep 2019 to Feb 2026
14 permits since 2000 (engineer on 10 permits, architect on 4 permits): 12 completed, 2 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 4, 2026 | Completed final sign-off Jun 2026 | 1 Front St | Principal Builders Inc. | floor 31-33- 202507110624 and ref 202601284713 to capture as built detailsDetails
floor 31-33- 202507110624 and ref 202601284713 to capture as built details | |
| Jan 28, 2026 | Completed final sign-off Jun 2026 | 1 Front St | Principal Builders Inc. | structural revision on l32 at interconnecting stairs for pa #202507110624 and removal of special inspection item #4Details
structural revision on l32 at interconnecting stairs for pa #202507110624 and removal of special inspection item #4 | |
| Sep 24, 2025 | Completed final sign-off Jun 2026 | 1 Front St | Principal Builders Inc. | 31 and 32/fl- deferred submittal 202507110624 for stair pan and connectionDetails
31 and 32/fl- deferred submittal 202507110624 for stair pan and connection | |
| Feb 4, 2025 | Completed final sign-off Sep 2025 | 255 Crestlake Dr | B R S Construction | framing revision to pa 202407186783 reframe roof for proper slope and ventilationDetails
framing revision to pa 202407186783 reframe roof for proper slope and ventilation | $5,000 |
| Nov 7, 2024 | Completed final sign-off Apr 2025 | 2460 Alameda St | Metropolitan Electrical Construction | revision to permit: 202403228404. relocate single stall and charger. adding power for power max charger.Details
revision to permit: 202403228404. relocate single stall and charger. adding power for power max charger. | $38,298 |
| Jul 27, 2023 | Never finaled issued Aug 2023, no final | 855 Geary St | Skyline Construction | repairs to damaged and deteriorated concrete slab, beam and wall elements on level 1 and 2.Details
repairs to damaged and deteriorated concrete slab, beam and wall elements on level 1 and 2. | $60,000 |
| Jun 14, 2023 | Completed final sign-off Aug 2023 | 855 Geary St | Skyline Construction | repair damabed and deteriorated portions of the e building. specifically slab and wall and elements.Details
repair damabed and deteriorated portions of the e building. specifically slab and wall and elements. | $25,000 |
| Jun 9, 2023 | Never finaled issued Jun 2023, no final | 1201 Bryant St | Skyline Construction | basement: equipment anchorage- seismic anchoring for 3d printers at basement.Details
basement: equipment anchorage- seismic anchoring for 3d printers at basement. | $5,000 |
| May 18, 2023 | Completed final sign-off Oct 2023 | 855 Geary St | Skyline Construction | slab repair & provide repair details for damaged openingDetails
slab repair & provide repair details for damaged opening | $12,000 |
| Oct 3, 2022 | Completed final sign-off Jul 2023 | 201 Toland St | Richlen Construction | rev to pa 202011189158 equipment installation (e) 30,300 sqft building for autonomous electrical vehicle repair. charging + maintenance space add two post lifts to the (e) service area add a (n) prefabricated storage container at the site to hold vehicle accessories.Details
rev to pa 202011189158 equipment installation (e) 30,300 sqft building for autonomous electrical vehicle repair. charging + maintenance space add two post lifts to the (e) service area add a (n) prefabricated storage container at the site to hold vehicle accessories. | $100,000 |
| Jan 28, 2022 | Completed final sign-off Jan 2024 | 272 Naples St | 2-story 700 sf rear addition with new ground floor master suite including bathrooms, new kitchen, family room, laundry room. new rear deck & stair. 350 sf new ground floor area.Details
2-story 700 sf rear addition with new ground floor master suite including bathrooms, new kitchen, family room, laundry room. new rear deck & stair. 350 sf new ground floor area. | $350,000 | |
| Apr 19, 2021 | Completed final sign-off Sep 2021 | 272 Naples St | C L Construction | replace (e) failing portion of home with new structural foundation, slab, exterior walls and roof. replacement windows and new skylights. remodel (e) bathroom within (e) footprint w/ new fixtures. install drains for site water drainage.Details
replace (e) failing portion of home with new structural foundation, slab, exterior walls and roof. replacement windows and new skylights. remodel (e) bathroom within (e) footprint w/ new fixtures. install drains for site water drainage. | $65,000 |
| Jan 24, 2020 | Completed final sign-off Oct 2020 | 300 Grove St | Bayside Mechanical Inc | provide and install 4 new roof top a/c units to replace existing . provide and install 5 new fans and one type ii hood. structural work to be performed by a class b licensed contractor.Details
provide and install 4 new roof top a/c units to replace existing . provide and install 5 new fans and one type ii hood. structural work to be performed by a class b licensed contractor. | $90,000 |
| Sep 17, 2019 | Completed final sign-off May 2020 | 101 Spear St | Novo Construction Inc | revision to 201905241699 2nd flr & 201906254311 3rd flr. add roll down door at elevator lobby. roll down door approved on application listed above, this is for the strucutral approval with calcsDetails
revision to 201905241699 2nd flr & 201906254311 3rd flr. add roll down door at elevator lobby. roll down door approved on application listed above, this is for the strucutral approval with calcs | $5,000 |