Adam T. Hugo-Holman

License
S5943
Structural engineer
About the Board for Professional Engineers, Land Surveyors, and Geologists
Look up S5943 at the Board for Professional Engineers
Listed as
architect, engineer
Firm
Degenkolb
Based in
San Francisco
On San Francisco permits
Sep 2019 to Oct 2026

15 permits since 2000 (engineer on 11 permits, architect on 4 permits): 12 completed, 1 in progress, 2 never finaled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Skyline Construction (5), Principal Builders Inc. (3), B R S Construction, Bayside Mechanical Inc, C L Construction, Metropolitan Electrical Construction, Novo Construction Inc, Richlen Construction
Architects
Fumiko Docker (2), Guion Childress, Luda Hoe, Peter Lloyd Morris
Engineers
Stephen Shafeer

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Oct 8, 2026In progress
issued Oct 2026
55 Spear StSkyline Constructionlevels 8,9, and 10 revision to 202608317423, 202608317425 202608317426 for revised phone booth location, additon/relocation of existing power and furniture layout
Details
Permit
202610089181
Permit issued
Oct 27, 2026

levels 8,9, and 10 revision to 202608317423, 202608317425 202608317426 for revised phone booth location, additon/relocation of existing power and furniture layout

Open the permit page

Feb 4, 2026Completed
final sign-off Jun 2026
1 Front StPrincipal Builders Inc.floor 31-33- 202507110624 and ref 202601284713 to capture as built details
Details
Permit
202602045181
Permit issued
Feb 4, 2026
Final sign-off
Jun 3, 2026

floor 31-33- 202507110624 and ref 202601284713 to capture as built details

Open the permit page

Jan 28, 2026Completed
final sign-off Jun 2026
1 Front StPrincipal Builders Inc.structural revision on l32 at interconnecting stairs for pa #202507110624 and removal of special inspection item #4
Details
Permit
202601284713
Permit issued
Feb 3, 2026
Final sign-off
Jun 10, 2026

structural revision on l32 at interconnecting stairs for pa #202507110624 and removal of special inspection item #4

Open the permit page

Sep 24, 2025Completed
final sign-off Jun 2026
1 Front StPrincipal Builders Inc.31 and 32/fl- deferred submittal 202507110624 for stair pan and connection
Details
Permit
202509246023
Permit issued
Sep 25, 2025
Final sign-off
Jun 10, 2026

31 and 32/fl- deferred submittal 202507110624 for stair pan and connection

Open the permit page

Feb 4, 2025Completed
final sign-off Sep 2025
255 Crestlake DrB R S Constructionframing revision to pa 202407186783 reframe roof for proper slope and ventilation
Details
Permit
202502049626
Permit issued
Feb 4, 2025
Final sign-off
Sep 18, 2025

framing revision to pa 202407186783 reframe roof for proper slope and ventilation

Open the permit page

$5,000
Nov 7, 2024Completed
final sign-off Apr 2025
2460 Alameda StMetropolitan Electrical Constructionrevision to permit: 202403228404. relocate single stall and charger. adding power for power max charger.
Details
Permit
202411074577
Permit issued
Dec 12, 2024
Final sign-off
Apr 24, 2025

revision to permit: 202403228404. relocate single stall and charger. adding power for power max charger.

Open the permit page

$38,298
Jul 27, 2023Never finaled
issued Aug 2023, no final
855 Geary StSkyline Constructionrepairs to damaged and deteriorated concrete slab, beam and wall elements on level 1 and 2.
Details
Permit
202307273148
Permit issued
Aug 4, 2023

repairs to damaged and deteriorated concrete slab, beam and wall elements on level 1 and 2.

Open the permit page

$60,000
Jun 14, 2023Completed
final sign-off Aug 2023
855 Geary StSkyline Constructionrepair damabed and deteriorated portions of the e building. specifically slab and wall and elements.
Details
Permit
202306140101
Permit issued
Jun 28, 2023
Final sign-off
Aug 24, 2023

repair damabed and deteriorated portions of the e building. specifically slab and wall and elements.

Open the permit page

$25,000
Jun 9, 2023Never finaled
issued Jun 2023, no final
1201 Bryant StSkyline Constructionbasement: equipment anchorage- seismic anchoring for 3d printers at basement.
Details
Permit
202306099695
Permit issued
Jun 23, 2023

basement: equipment anchorage- seismic anchoring for 3d printers at basement.

Open the permit page

$5,000
May 18, 2023Completed
final sign-off Oct 2023
855 Geary StSkyline Constructionslab repair & provide repair details for damaged opening
Details
Permit
202305188006
Permit issued
Jun 13, 2023
Final sign-off
Oct 20, 2023

slab repair & provide repair details for damaged opening

Open the permit page

$12,000
Oct 3, 2022Completed
final sign-off Jul 2023
201 Toland StRichlen Constructionrev to pa 202011189158 equipment installation (e) 30,300 sqft building for autonomous electrical vehicle repair. charging + maintenance space add two post lifts to the (e) service area add a (n) prefabricated storage container at the site to hold vehicle accessories.
Details
Permit
202210033628
Permit issued
Oct 6, 2022
Final sign-off
Jul 20, 2023

rev to pa 202011189158 equipment installation (e) 30,300 sqft building for autonomous electrical vehicle repair. charging + maintenance space add two post lifts to the (e) service area add a (n) prefabricated storage container at the site to hold vehicle accessories.

Open the permit page

$100,000
Jan 28, 2022Completed
final sign-off Jan 2024
272 Naples St2-story 700 sf rear addition with new ground floor master suite including bathrooms, new kitchen, family room, laundry room. new rear deck & stair. 350 sf new ground floor area.
Details
Permit
202201286871
Permit issued
Mar 20, 2023
Final sign-off
Jan 25, 2024

2-story 700 sf rear addition with new ground floor master suite including bathrooms, new kitchen, family room, laundry room. new rear deck & stair. 350 sf new ground floor area.

Open the permit page

$350,000
Apr 19, 2021Completed
final sign-off Sep 2021
272 Naples StC L Constructionreplace (e) failing portion of home with new structural foundation, slab, exterior walls and roof. replacement windows and new skylights. remodel (e) bathroom within (e) footprint w/ new fixtures. install drains for site water drainage.
Details
Permit
202104198816
Permit issued
May 26, 2021
Final sign-off
Sep 22, 2021

replace (e) failing portion of home with new structural foundation, slab, exterior walls and roof. replacement windows and new skylights. remodel (e) bathroom within (e) footprint w/ new fixtures. install drains for site water drainage.

Open the permit page

$65,000
Jan 24, 2020Completed
final sign-off Oct 2020
300 Grove StBayside Mechanical Incprovide and install 4 new roof top a/c units to replace existing . provide and install 5 new fans and one type ii hood. structural work to be performed by a class b licensed contractor.
Details
Permit
202001242712
Permit issued
Jan 30, 2020
Final sign-off
Oct 13, 2020

provide and install 4 new roof top a/c units to replace existing . provide and install 5 new fans and one type ii hood. structural work to be performed by a class b licensed contractor.

Open the permit page

$90,000
Sep 17, 2019Completed
final sign-off May 2020
101 Spear StNovo Construction Increvision to 201905241699 2nd flr & 201906254311 3rd flr. add roll down door at elevator lobby. roll down door approved on application listed above, this is for the strucutral approval with calcs
Details
Permit
201909171857
Permit issued
Oct 18, 2019
Final sign-off
May 18, 2020

revision to 201905241699 2nd flr & 201906254311 3rd flr. add roll down door at elevator lobby. roll down door approved on application listed above, this is for the strucutral approval with calcs

Open the permit page

$5,000