C L Construction
- Based in
- Novato
- On San Francisco permits
- Nov 2016 to Apr 2021
- Last 24 months
- 0 permits filed
5 permits since 2000: 3 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 19, 2021 | Completed final sign-off Sep 2021 | 272 Naples St | replace (e) failing portion of home with new structural foundation, slab, exterior walls and roof. replacement windows and new skylights. remodel (e) bathroom within (e) footprint w/ new fixtures. install drains for site water drainage.Details
replace (e) failing portion of home with new structural foundation, slab, exterior walls and roof. replacement windows and new skylights. remodel (e) bathroom within (e) footprint w/ new fixtures. install drains for site water drainage. | $65,000 |
| Nov 19, 2019 | Completed final sign-off Jan 2020 | 1895 Pacific Av | unit #405: remove non-bearing interior walls. new kitchen countertop, sink, & stove. no lighting changes. maher n/a.Details
unit #405: remove non-bearing interior walls. new kitchen countertop, sink, & stove. no lighting changes. maher n/a. | $10,000 |
| Oct 23, 2019 | Completed final sign-off Jan 2020 | 1895 Pacific Av | bathroom 6'x 8'. replace shower and floor tiles, replace vanity in (e) bathroomDetails
bathroom 6'x 8'. replace shower and floor tiles, replace vanity in (e) bathroom | $15,000 |
| Dec 9, 2016 | Never finaled issued Dec 2016, no final | 454 Clipper St | revision to app#201611142618. replace a planter in front of house.Details
revision to app#201611142618. replace a planter in front of house. | $6,000 |
| Nov 14, 2016 | Never finaled issued Nov 2016, no final | 454 Clipper St | replace of retaining wall for front planter boxDetails
replace of retaining wall for front planter box | $6,000 |