Fumiko Docker
- License
- C33795
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- Firm
- Pencil Box Architects, Inc
- Based in
- San Francisco
- On San Francisco permits
- Nov 2020 to Oct 2026
9 permits since 2000 (architect on 9 permits): 3 completed, 4 in progress, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Initial Construction (2), C L Construction
- Engineers
- Adam Hugo-Holman (2), Andrew Arnold, Donald David
Where they worked
- Single-family 6
- Multi-family (2-family, apartments) 3
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 14, 2026 | In progress issued Oct 2026 | 41 Prosper St | Initial Construction | deferred submittal of spiral stair at rear of bldg. ref pa# 202409120641.Details
deferred submittal of spiral stair at rear of bldg. ref pa# 202409120641. | |
| Apr 29, 2026 | In progress issued May 2026 | 710 44th Av | replace (e) rear landing and stair with new wood stair. construct 1-hr wall at property line. new 116 sf deck max 44" above grade. replace concrete and brick pavers with gravel and landscaping. new rear drain.Details
replace (e) rear landing and stair with new wood stair. construct 1-hr wall at property line. new 116 sf deck max 44" above grade. replace concrete and brick pavers with gravel and landscaping. new rear drain. | $30,000 | |
| Mar 18, 2026 | In progress issued Mar 2026 | 1964 15th St | remodel (e) bathroom in (e) footprint. replace (e) bathroom window in kind. (reverse) change position (e) of shower & lavatory.Details
remodel (e) bathroom in (e) footprint. replace (e) bathroom window in kind. (reverse) change position (e) of shower & lavatory. | $40,000 | |
| Sep 27, 2024 | In progress issued Jun 2025 | 41 Prosper St | Initial Construction | renovation & structural retrofit:relocate kitchens, bathrooms, add 2nd bath in (e) units. renovate (e) g/f storage area 354sf office w/ bath & wet bar.remove (e) rear stair w/ ab-005 local equiv for sffd ladder access.new wood siding at ext walls at street.new wdws e/s building rear.replace (e) wdwsDetails
renovation & structural retrofit:relocate kitchens, bathrooms, add 2nd bath in (e) units. renovate (e) g/f storage area 354sf office w/ bath & wet bar.remove (e) rear stair w/ ab-005 local equiv for sffd ladder access.new wood siding at ext walls at street.new wdws e/s building rear.replace (e) wdws | $400,000 |
| Mar 3, 2022 | Never finaled filed Mar 2022, never issued | 359 Vernon St | new 120 sf solarium(sunroom) in required rear yard. new rear decks & stairs in required rear yard.(120 sq ft solarium (sun room) and 120 sq ft of deck, approx. 3 ft height from grade,with 10 ft encroachment in the required rear yard. lower decks 30" above grade. proposed rear yard setback is 25 ft)Details
new 120 sf solarium(sunroom) in required rear yard. new rear decks & stairs in required rear yard.(120 sq ft solarium (sun room) and 120 sq ft of deck, approx. 3 ft height from grade,with 10 ft encroachment in the required rear yard. lower decks 30" above grade. proposed rear yard setback is 25 ft) | $40,000 | |
| Jan 28, 2022 | Completed final sign-off Jan 2024 | 272 Naples St | 2-story 700 sf rear addition with new ground floor master suite including bathrooms, new kitchen, family room, laundry room. new rear deck & stair. 350 sf new ground floor area.Details
2-story 700 sf rear addition with new ground floor master suite including bathrooms, new kitchen, family room, laundry room. new rear deck & stair. 350 sf new ground floor area. | $350,000 | |
| Dec 27, 2021 | Completed final sign-off Nov 2022 | 574 Mississippi St | add a wine cellar (127 sq. ft.) in existing lower level unfinished, unconditioned area. wine cellar will be enclosed and conditioned, increasing total conditioned area from 2322 sf to 2449 sf.Details
add a wine cellar (127 sq. ft.) in existing lower level unfinished, unconditioned area. wine cellar will be enclosed and conditioned, increasing total conditioned area from 2322 sf to 2449 sf. | $15,000 | |
| Apr 19, 2021 | Completed final sign-off Sep 2021 | 272 Naples St | C L Construction | replace (e) failing portion of home with new structural foundation, slab, exterior walls and roof. replacement windows and new skylights. remodel (e) bathroom within (e) footprint w/ new fixtures. install drains for site water drainage.Details
replace (e) failing portion of home with new structural foundation, slab, exterior walls and roof. replacement windows and new skylights. remodel (e) bathroom within (e) footprint w/ new fixtures. install drains for site water drainage. | $65,000 |
| Nov 13, 2020 | Expired or cancelled withdrawn Mar 2024 | 160 Buena Vista Tr | fence partial replacement. new fence gate. fence & gate extensions.Details
fence partial replacement. new fence gate. fence & gate extensions. | $5,000 |