Peter Lloyd Morris
- Listed as
- architect
- Firm
- Twinsteps Architecture
- Based in
- Seattle
- On San Francisco permits
- Oct 2022 to Sep 2026
4 permits since 2000 (architect on 4 permits): 2 completed, 2 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 21, 2026 | In progress filed Sep 2026, not yet issued | 345 Brannan St | eliminate 11 protected opening between (2) buildings by permanently closing 2 hour fire doors. new wall for looks.Details
eliminate 11 protected opening between (2) buildings by permanently closing 2 hour fire doors. new wall for looks. | $15,000 | |
| Sep 21, 2026 | In progress filed Sep 2026, not yet issued | 333 Brannan St | eliminate 11 protected opening between (2) buildings by permanently closing 2 hour fire doors. new wall for looks.Details
eliminate 11 protected opening between (2) buildings by permanently closing 2 hour fire doors. new wall for looks. | $15,000 | |
| Nov 22, 2024 | Completed final sign-off Feb 2025 | 201 Toland St | Bcci Construction Company | installation of 2 pre-manufactured phone booths relocated from a different facility, additional signage adjacent to an existing conference room to indicate an accessible phone call area.Details
installation of 2 pre-manufactured phone booths relocated from a different facility, additional signage adjacent to an existing conference room to indicate an accessible phone call area. | $8,000 |
| Oct 3, 2022 | Completed final sign-off Jul 2023 | 201 Toland St | Richlen Construction | rev to pa 202011189158 equipment installation (e) 30,300 sqft building for autonomous electrical vehicle repair. charging + maintenance space add two post lifts to the (e) service area add a (n) prefabricated storage container at the site to hold vehicle accessories.Details
rev to pa 202011189158 equipment installation (e) 30,300 sqft building for autonomous electrical vehicle repair. charging + maintenance space add two post lifts to the (e) service area add a (n) prefabricated storage container at the site to hold vehicle accessories. | $100,000 |