Block 3905, lot 011
2460 Alameda St
- City’s use
- Industrial
- Built
- 2009
- Stories
- 2
- Rooms
- 2 bathrooms
- Building
- 35,134 sq ft
- Lot
- 16,447 sq ft
- Zoning
- NA
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 12, 2025 | Completed final sign-off Apr 2026 | 2460 Alameda St | Smartspace Solutions Metal & Prefab | install interior storage racksDetails
install interior storage racks | $76,460 |
| Mar 19, 2025 | Completed final sign-off Apr 2025 | 2460 Alameda St | Pioneer Fire Inc. | replace 28 uprights. gc t.i. #202403228404Details
replace 28 uprights. gc t.i. #202403228404 | $7,000 |
| Nov 7, 2024 | Completed final sign-off Apr 2025 | 2460 Alameda St | Metropolitan Electrical Construction | revision to permit: 202403228404. relocate single stall and charger. adding power for power max charger.Details
revision to permit: 202403228404. relocate single stall and charger. adding power for power max charger. | $38,298 |
| Oct 28, 2024 | In progress issued Dec 2024 | 2460 Alameda St | Metropolitan Electrical Construction | at the rear of the building, addition of 2 exterior high-speed roll-up doors, installed over 2 (e) overhead sectional roll-up doors. no change to size of door openings. no change to use or occupancy.Details
at the rear of the building, addition of 2 exterior high-speed roll-up doors, installed over 2 (e) overhead sectional roll-up doors. no change to size of door openings. no change to use or occupancy. | $79,690 |
| Apr 5, 2024 | Completed final sign-off May 2025 | 2460 Alameda St | Metropolitan Electrical Construction | revision to pa#202403228404 to revise bollard detail addition of two ev changers and four car lifts with power and structural on the 1st floor. addition of power and data outlets in 4 locations on the 3rd floor.Details
revision to pa#202403228404 to revise bollard detail addition of two ev changers and four car lifts with power and structural on the 1st floor. addition of power and data outlets in 4 locations on the 3rd floor. | $71,000 |
| Mar 22, 2024 | Completed final sign-off May 2025 | 2460 Alameda St | Metropolitan Electrical Construction | 2 electrical car chargers & convenience chargersDetails
2 electrical car chargers & convenience chargers | $29,865 |
| Jun 12, 2020 | Completed final sign-off Aug 2021 | 2460 Alameda St | Battalion One Fire Protection | as-builts to p.a. #2018-0612-1652. replace 120v smoke detectors with new system smoke detectors and install new relay modules to control release of the roll-up doors upon activation of one of the smoke detectors. new devices will be tie-in to existing control panel.Details
as-builts to p.a. #2018-0612-1652. replace 120v smoke detectors with new system smoke detectors and install new relay modules to control release of the roll-up doors upon activation of one of the smoke detectors. new devices will be tie-in to existing control panel. | $3,761 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Metropolitan Electrical Construction (4), Battalion One Fire Protection, Pioneer Fire Inc., Smartspace Solutions Metal & Prefab
- Architects
- Luda Hoe (2), Michael Downey (2)
- Engineers
- Adam T. Hugo-Holman, Sal Fateen, Stephen Shafeer
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.