Permit GraphShortlistSan Francisco building permits since 2000

Cameron Funk

License
1079236
State contractor license record
Listed as
authorized agent-others, contractor
Firm
In Charge Energy Inc
Based in
Los Angeles
On San Francisco permits
Jan 2022 to Jul 2025

5 permits since 2000 (contractor on 5 permits, authorized agent-others on 1 permit): 3 completed, 1 in progress, 1 never finaled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jul 18, 2025In progress
issued Nov 2025
1401 Folsom StIn Charge Energy Incinstallation of ev charging station and their accompany civil and electrical infrastructure. demolition of existing surfaces. grading of 37 cubic yards of soil. insall 1 utitlity transform, 1 switchboard assembly, 5 400kw alpitronic hyc400 ev chargers, 8 ev sign posts, 2 accessible ev sign posts,
Details
Permit
202507181116
Status
issued
Filed
Jul 18, 2025
Permit issued
Nov 3, 2025
Declared cost
$400,000
Address
1401 Folsom St

installation of ev charging station and their accompany civil and electrical infrastructure. demolition of existing surfaces. grading of 37 cubic yards of soil. insall 1 utitlity transform, 1 switchboard assembly, 5 400kw alpitronic hyc400 ev chargers, 8 ev sign posts, 2 accessible ev sign posts,

Open the permit page

$400,000
Mar 21, 2023Completed
final sign-off Jan 2024
855 Geary StIn Charge Energy Increvision to pa#: 202204132175. 1st flr installation of ev chargers within eixsting parking garage. added 2 mini-split condenser/fan coil units for the elec distribution room. added direct-current fast charging. relocated distrib. panel. misc chnages per plans
Details
Permit
202303214083
Status
complete
Filed
Mar 21, 2023
Permit issued
Apr 19, 2023
Final sign-off
Jan 23, 2024
Declared cost
$60,000
Address
855 Geary St

revision to pa#: 202204132175. 1st flr installation of ev chargers within eixsting parking garage. added 2 mini-split condenser/fan coil units for the elec distribution room. added direct-current fast charging. relocated distrib. panel. misc chnages per plans

Open the permit page

$60,000
Nov 7, 2022Never finaled
filed Nov 2022, never issued
855 Geary StIn Charge Energy Incinstall new electrical service/room, electrical equipment, pipe, wire, etc., for insall of (22) 180kw dc ev chargers & (17) 40a level 2 chargers
Details
Permit
202211076007
Status
filed
Filed
Nov 7, 2022
Declared cost
$1,100,000
Address
855 Geary St

install new electrical service/room, electrical equipment, pipe, wire, etc., for insall of (22) 180kw dc ev chargers & (17) 40a level 2 chargers

Open the permit page

$1,100,000
Apr 13, 2022Completed
final sign-off Jan 2024
855 Geary StIn Charge Energy Incbasement/2 & ground floors: installation of charging infrastructure for plug-in hybrid electric vehicles, including: new electrical service & switch gear. electrical distribution equipment, ac/dc charging equipment. chargers @ gr/f to be installed in future permit.
Details
Permit
202204132175
Status
complete
Filed
Apr 13, 2022
Permit issued
Dec 29, 2022
Final sign-off
Jan 23, 2024
Declared cost
$65,000
Address
855 Geary St

basement/2 & ground floors: installation of charging infrastructure for plug-in hybrid electric vehicles, including: new electrical service & switch gear. electrical distribution equipment, ac/dc charging equipment. chargers @ gr/f to be installed in future permit.

Open the permit page

$65,000
Jan 14, 2022Completed
final sign-off Jan 2023
333 Brannan StIn Charge Energy Incinstallation of charging infrastructure for plug-in hybrid electric vehicle chargers. not for public use.
Details
Permit
202201146035
Status
complete
Filed
Jan 14, 2022
Permit issued
Feb 25, 2022
Final sign-off
Jan 6, 2023
Declared cost
$150,000
Address
333 Brannan St

installation of charging infrastructure for plug-in hybrid electric vehicle chargers. not for public use.

Open the permit page

$150,000