Permit GraphShortlistSan Francisco building permits since 2000

Anthony Hoac

License
82399
Board not determined from the city's record: no role or letter places this number
About the state's license search
Search the state's license records (not the contractors board)
Listed as
authorized agent-others, engineer
Firm
Kimley-Horn & Assocs
Based in
Raleigh
On San Francisco permits
Jan 2021 to Jul 2026

3 permits since 2000 (engineer on 2 permits, authorized agent-others on 1 permit): 1 completed, 2 in progress.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Five Engineering & Plumbing Inc, In Charge Energy Inc, Uprite Construction Corp
Engineers
Dustin James Colwell

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jul 27, 2026In progress
issued Sep 2026
2201 Alemany BlFive Engineering & Plumbing Incstormwater control plans.
Details
Permit
202607275631
Permit issued
Sep 22, 2026

stormwater control plans.

Open the permit page

Jul 18, 2025In progress
issued Nov 2025
1401 Folsom StIn Charge Energy Incinstallation of ev charging station and their accompany civil and electrical infrastructure. demolition of existing surfaces. grading of 37 cubic yards of soil. insall 1 utitlity transform, 1 switchboard assembly, 5 400kw alpitronic hyc400 ev chargers, 8 ev sign posts, 2 accessible ev sign posts,
Details
Permit
202507181116
Permit issued
Nov 3, 2025

installation of ev charging station and their accompany civil and electrical infrastructure. demolition of existing surfaces. grading of 37 cubic yards of soil. insall 1 utitlity transform, 1 switchboard assembly, 5 400kw alpitronic hyc400 ev chargers, 8 ev sign posts, 2 accessible ev sign posts,

Open the permit page

$400,000
Jan 29, 2021Completed
final sign-off Apr 2022
2000 Marin StUprite Construction Corpparking lot upgrades include re-striping & fixture upgrades for lighting. no grading/ground breaks are proposed. no work to existing building. change of use from accessory parking to parcel delivery service (parking only).
Details
Permit
202101293588
Permit issued
Aug 3, 2021
Final sign-off
Apr 4, 2022

parking lot upgrades include re-striping & fixture upgrades for lighting. no grading/ground breaks are proposed. no work to existing building. change of use from accessory parking to parcel delivery service (parking only).

Open the permit page

$165,000