Five Engineering & Plumbing Inc
- Based in
- Lake Elsinore
- On San Francisco permits
- Jul 2026 to Jul 2026
- Last 24 months
- 2 permits filed
2 permits since 2000: 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 27, 2026 | In progress issued Sep 2026 | 2201 Alemany Bl | stormwater control plans.Details
stormwater control plans. | |
| Jul 24, 2026 | In progress issued Aug 2026 | 2201 Alemany Bl | demolition of existing surfaces for the installation of ev charging station. grading of surfaces associated with evse to comply with ada requirement. install 1 utility transformer, 1 switchboard assembly, 8 400kw alpitronic hyc400 ev charges, 16 ev sign posts, 26 bollards, 1 ornamental fence.Details
demolition of existing surfaces for the installation of ev charging station. grading of surfaces associated with evse to comply with ada requirement. install 1 utility transformer, 1 switchboard assembly, 8 400kw alpitronic hyc400 ev charges, 16 ev sign posts, 26 bollards, 1 ornamental fence. | $750,000 |