Block 3725, lot 093
901 Mission St
- City’s use
- Commercial Office
- Built
- 1924
- Stories
- 3
- Building
- 178,720 sq ft
- Lot
- 42,396 sq ft
- Zoning
- C3S
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
66 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 13, 2021 | Never finaled issued Jul 2021, no final | 901 Mission St | Vawdrey Construction | 3/f: partial demo non structural partition walls for future compliant accessible restrooms, future interior improve @ (e) 3/f suite. (e) ceiling & fixture to remain, patch/repair under future scope.Details
3/f: partial demo non structural partition walls for future compliant accessible restrooms, future interior improve @ (e) 3/f suite. (e) ceiling & fixture to remain, patch/repair under future scope. | $20,000 |
| Jun 23, 2021 | Completed final sign-off Jun 2022 | 901 Mission St | Intelligent Technologies & Services Inc | provide upgrade/one-for-one replacement of (e) fire alarm detection/control system. the notification portion is existing & to remain with no modifications. only detection/controls portion are to be replaced/upgraded. includes control panel, components, addressable devices; adding system monitoringDetails
provide upgrade/one-for-one replacement of (e) fire alarm detection/control system. the notification portion is existing & to remain with no modifications. only detection/controls portion are to be replaced/upgraded. includes control panel, components, addressable devices; adding system monitoring | $38,673 |
| Jun 7, 2021 | Completed final sign-off Dec 2021 | 901 Mission St | Intelligent Technologies & Services Inc | design intent of modifying fire alarm devices layout to accomodate changes on 3rd floor due to a new t.i. project. added devices include horn/strobes, 10 strobes, 3 smoke detectors, 2 manual pull stations.Details
design intent of modifying fire alarm devices layout to accomodate changes on 3rd floor due to a new t.i. project. added devices include horn/strobes, 10 strobes, 3 smoke detectors, 2 manual pull stations. | $81,852 |
| Jun 3, 2021 | Completed final sign-off Aug 2021 | 901 Mission St | Sc Builders, Inc | 3/f: revision to pa 202011239545. mep for the project adding the revision pages for the architectureal wall changes to match back ground of meps.Details
3/f: revision to pa 202011239545. mep for the project adding the revision pages for the architectureal wall changes to match back ground of meps. | |
| Apr 5, 2021 | Completed final sign-off Jul 2021 | 901 Mission St | R L H Fire Protection Inc | fire sprinkler permit. relocate 213, add 19, and delete 27 sprinklers on the 3rd floor. t.i. # 2020-1123-9545Details
fire sprinkler permit. relocate 213, add 19, and delete 27 sprinklers on the 3rd floor. t.i. # 2020-1123-9545 | $80,000 |
| Dec 23, 2020 | Never finaled issued Mar 2021, no final | 901 Mission St | Emcor Services/Mesa Energy Systems Inc | remove existing water chilled cooler and replace with new. modify existing support for new footprint.Details
remove existing water chilled cooler and replace with new. modify existing support for new footprint. | $350,000 |
| Nov 23, 2020 | Completed final sign-off Aug 2021 | 901 Mission St | Sc Builders, Inc | 3/f: t.i. of (e) office space including selective demo of non-load bearing partitions, new finishes, millwork & furniture. mep under sep permit if affects (e) system if needed. bldg is fully sprinkled.Details
3/f: t.i. of (e) office space including selective demo of non-load bearing partitions, new finishes, millwork & furniture. mep under sep permit if affects (e) system if needed. bldg is fully sprinkled. | $2,200,000 |
| Feb 24, 2020 | Completed final sign-off May 2020 | 901 Mission St | Vawdrey Construction | interior remodeling, including demolition and construction of partition walls.Details
interior remodeling, including demolition and construction of partition walls. | $9,500 |
| Aug 27, 2019 | Completed final sign-off Dec 2020 | 901 Mission St | Build Group Inc. | tieback agreement only for temporary shoring 434 minna st. see site permit pa #201808066535-s. see pa #201908229534 for main site temporary shoring and excavation.Details
tieback agreement only for temporary shoring 434 minna st. see site permit pa #201808066535-s. see pa #201908229534 for main site temporary shoring and excavation. | |
| Jul 18, 2019 | Never finaled issued Jul 2019, no final | 925 Mission St | lessee building connected, 925 mission street, need verification per for address per usps.Details
lessee building connected, 925 mission street, need verification per for address per usps. | ||
| May 15, 2019 | Completed final sign-off May 2019 | 901 Mission St | Intelligent Technologies & Services Inc | 3rd floor: relocate 1 speaker/strobe and add 1 strobe to new 3rd floor office space t.i. app#201904157932. n/a for maherDetails
3rd floor: relocate 1 speaker/strobe and add 1 strobe to new 3rd floor office space t.i. app#201904157932. n/a for maher | $8,559 |
| Apr 15, 2019 | Completed final sign-off May 2019 | 901 Mission St | Novo Construction Inc | 3rd fl suite 306 ti includes, demo of e finishes and providing new finishes. all new or revised mep life safety will be design build and submitted separately if needed. n/a for maher.Details
3rd fl suite 306 ti includes, demo of e finishes and providing new finishes. all new or revised mep life safety will be design build and submitted separately if needed. n/a for maher. | $157,000 |
| Dec 4, 2018 | Expired or cancelled cancelled Jan 2026 | 901 Mission St | change of use from event space to assembly use a-3. no constructionDetails
change of use from event space to assembly use a-3. no construction | $500 | |
| Sep 18, 2018 | Completed final sign-off Nov 2018 | 901 Mission St | E. J. Weber Elect.Co Inc | 2/f: lighting and t24 work only. no bldg permit. maher n/a.Details
2/f: lighting and t24 work only. no bldg permit. maher n/a. | $60,000 |
| Aug 17, 2018 | Completed final sign-off Nov 2018 | 901 Mission St | 1/f: interior demo of non-structural partition walls. maher n/a.Details
1/f: interior demo of non-structural partition walls. maher n/a. | $5,000 | |
| Aug 3, 2017 | Expired or cancelled cancelled Nov 2022 | 901 Mission St | renovation of existing tenant space on basement, 1st fl, mezzanine, 2nd fl. consists of demolition and improvement office non-bearing partitions, suspended ceiling systems and finishes, const of new ti space new open & closed office space, conference rm, copy rm, cafe, lunch and storage rm.Details
renovation of existing tenant space on basement, 1st fl, mezzanine, 2nd fl. consists of demolition and improvement office non-bearing partitions, suspended ceiling systems and finishes, const of new ti space new open & closed office space, conference rm, copy rm, cafe, lunch and storage rm. | $18,000,000 | |
| Mar 31, 2015 | Never finaled issued Jun 2015, no final | 925 Mission St | Metropolitan Electrical Construction, Westower Communications | remove nextel radio equip, antenna and above ground coax. maher not req'dDetails
remove nextel radio equip, antenna and above ground coax. maher not req'd | $10,000 |
| Feb 6, 2014 | Never finaled issued Feb 2014, no final | 901 Mission St | revision to app# 201401146222, we currently receive bulk mail & are changing to "usps" single tenant mail boxes, we currently have (12) tenants, to service.Details
revision to app# 201401146222, we currently receive bulk mail & are changing to "usps" single tenant mail boxes, we currently have (12) tenants, to service. | ||
| Jan 14, 2014 | Never finaled issued Jan 2014, no final | 901 Mission St | no building construction - we currently have an occupied mail rooml which we are closing. we will be converting to separate mail boxes for each tenant.Details
no building construction - we currently have an occupied mail rooml which we are closing. we will be converting to separate mail boxes for each tenant. | $500 | |
| May 31, 2013 | Never finaled issued Jun 2013, no final | 901 Mission St | evacuation signage. new to be intalled through out bldg . 32 pagesDetails
evacuation signage. new to be intalled through out bldg . 32 pages | $3,000 | |
| Jan 10, 2013 | Completed final sign-off Jan 2013 | 901 Mission St | Transbay Fire Protection | 3rd fl demo (2) drops back to branchline & plug outlets in elevator lobby area. relocate (1) head in women's bathroom.Details
3rd fl demo (2) drops back to branchline & plug outlets in elevator lobby area. relocate (1) head in women's bathroom. | $5,100 |
| Jun 4, 2012 | Completed final sign-off Jul 2012 | 901 Mission St | Transbay Fire Protection | 2nd floor lobby 201 - relcoate (6) existing pendents to accomodate new ceiling grid, add arm overs from existing outlets, add (6) new hangers & (1) end of line restraint in area of work only.Details
2nd floor lobby 201 - relcoate (6) existing pendents to accomodate new ceiling grid, add arm overs from existing outlets, add (6) new hangers & (1) end of line restraint in area of work only. | $5,000 |
| May 23, 2012 | Completed final sign-off Sep 2012 | 901 Mission St | Johnson Controls Inc. | revision to 201202154231: revise structural detail to reinforce attachement of existing wood platform to existing concrete pmp and show anchorage of new fluid cooler and isolators into existing wood platform.Details
revision to 201202154231: revise structural detail to reinforce attachement of existing wood platform to existing concrete pmp and show anchorage of new fluid cooler and isolators into existing wood platform. | |
| May 18, 2012 | Completed final sign-off May 2012 | 901 Mission St | Transbay Fire Protection | demo extg fire hose cabinet in lobby 201 2nd floor and cap. fire hose cabinet to be relocated. reference to pa# 201204107954.Details
demo extg fire hose cabinet in lobby 201 2nd floor and cap. fire hose cabinet to be relocated. reference to pa# 201204107954. | |
| Apr 10, 2012 | Completed final sign-off May 2012 | 901 Mission St | Transbay Fire Protection | 2nd floor fire sprinkle- demo drops rack to branch line & relocate (6) uprights by using mech strap (5) & (1) (e) outlet. plug (e) outlets, relocate (3) pendents using armovers to ensure proper nfpa 2010 coverage, add hangers, end of line restraints & bracing for esisting, demo (e) pendents & plug.Details
2nd floor fire sprinkle- demo drops rack to branch line & relocate (6) uprights by using mech strap (5) & (1) (e) outlet. plug (e) outlets, relocate (3) pendents using armovers to ensure proper nfpa 2010 coverage, add hangers, end of line restraints & bracing for esisting, demo (e) pendents & plug. | $5,873 |
| Feb 15, 2012 | Completed final sign-off Jan 2013 | 901 Mission St | Johnson Controls Inc. | remove and replace one air handler and one fluid coolerDetails
remove and replace one air handler and one fluid cooler | $185,000 |
| Jan 13, 2012 | Completed final sign-off Feb 2012 | 901 Mission St | Transbay Fire Protection | 2nd floor ste 211 fire sprinkler - demo drops back to branchlines, replace with uprights (36), add (47) new sprinkler pendants where new ceiling is added from existing outlets. add hangers per nfpa 13 -2010 code. upgrade seismic restraints for existing system in area of work only.Details
2nd floor ste 211 fire sprinkler - demo drops back to branchlines, replace with uprights (36), add (47) new sprinkler pendants where new ceiling is added from existing outlets. add hangers per nfpa 13 -2010 code. upgrade seismic restraints for existing system in area of work only. | $33,962 |
| Dec 23, 2011 | Completed final sign-off Feb 2012 | 901 Mission St | Intelligent Technologies & Services Inc | 2nd floor tenant improvement existing fire alarm system, add (4) strobes, (6) speaker strobes, tie into system at nearest circuit connection.Details
2nd floor tenant improvement existing fire alarm system, add (4) strobes, (6) speaker strobes, tie into system at nearest circuit connection. | $1,015 |
| Dec 15, 2011 | Never finaled issued Jan 2012, no final | 901 Mission St | Johnson Controls Inc. | revision to 201103142042. revision to seismic attachment weld detailDetails
revision to 201103142042. revision to seismic attachment weld detail | |
| Oct 18, 2011 | Never finaled issued Oct 2011, no final | 925 Mission St | to obtain final inspection for work approved under pa#201007025898 all work is complete.Details
to obtain final inspection for work approved under pa#201007025898 all work is complete. | ||
| Jun 23, 2011 | Completed final sign-off Aug 2011 | 901 Mission St | Intelligent Technologies & Services Inc | modify existing audible/visual layout on the 2nd fl for new tenant improvment. add 2 strobes, demo 4 speaker strobes, relocate 7 speaker strobes, relocate 2 strobes. total 11 sheets submittedDetails
modify existing audible/visual layout on the 2nd fl for new tenant improvment. add 2 strobes, demo 4 speaker strobes, relocate 7 speaker strobes, relocate 2 strobes. total 11 sheets submitted | $11,975 |
| Jun 9, 2011 | Completed final sign-off Aug 2011 | 925 Mission St | Howard S. Wright Constructors Lp | 2nd flr: revision to pa# 2011.04.26.4783 to show minor changes to non struc wall detail and new interior glassDetails
2nd flr: revision to pa# 2011.04.26.4783 to show minor changes to non struc wall detail and new interior glass | |
| May 17, 2011 | Completed final sign-off Aug 2011 | 925 Mission St | Howard S. Wright Constructors Lp | 2/f- revision to 201104264783: add spiral stair to connect new 2nd floor office with 1st floor office. this is a convenience stair within a tenant space, not an exit stair. cost of cutting out slab included in previous permit.Details
2/f- revision to 201104264783: add spiral stair to connect new 2nd floor office with 1st floor office. this is a convenience stair within a tenant space, not an exit stair. cost of cutting out slab included in previous permit. | $1,000 |
| May 10, 2011 | Completed final sign-off Aug 2011 | 901 Mission St | Transbay Fire Protection | demo drops back to branchlines and replace (e)pendent sprinklers w/ 85 upright sprnklers by using existing outlets in ste 205 & 206. add 7 new pendents to area of work. upgrade seimic restraints in area of work to fire sprnkler pipes per nfpa 13 code - 2010 relocate 16 sprinklers as noted on plans.Details
demo drops back to branchlines and replace (e)pendent sprinklers w/ 85 upright sprnklers by using existing outlets in ste 205 & 206. add 7 new pendents to area of work. upgrade seimic restraints in area of work to fire sprnkler pipes per nfpa 13 code - 2010 relocate 16 sprinklers as noted on plans. | $18,800 |
| Apr 26, 2011 | Completed final sign-off Aug 2011 | 925 Mission St | Howard S. Wright Constructors Lp | 2nd floor office tenant improvement - demol (e) ofice improvements, provide 2 new exits to (e) corridor; build offices, meeting rooms & open office areas with cabinetry & related coffee bar plumbing.Details
2nd floor office tenant improvement - demol (e) ofice improvements, provide 2 new exits to (e) corridor; build offices, meeting rooms & open office areas with cabinetry & related coffee bar plumbing. | $390,000 |
| Apr 19, 2011 | Completed final sign-off Jul 2011 | 925 Mission St | Howard S. Wright Constructors Lp | (4) existing windows to be enlarged (west side of bldg).Details
(4) existing windows to be enlarged (west side of bldg). | $45,000 |
| Mar 14, 2011 | Never finaled issued Apr 2011, no final | 901 Mission St | Johnson Controls Inc. | replace chiller #1 with new mech penthouse.Details
replace chiller #1 with new mech penthouse. | $197,865 |
| Feb 25, 2011 | Completed final sign-off Apr 2011 | 925 Mission St | Intelligent Technologies & Services Inc | modify the existing power supply circuit on the 1st floor, power supply # 5Details
modify the existing power supply circuit on the 1st floor, power supply # 5 | $3,500 |
| Jan 6, 2011 | Completed final sign-off Mar 2011 | 901 Mission St | Transbay Fire Protection | suite #201 & @202 - demo drops back to branchlines & replace (e) pendant sprinklers w/upright sprinklers. add armovers to ensure sprinklers are in correct distance for code compliance. any armovers greater than 4'-0". add branchline restrints seismic restraints for (e) pipe are not in scope of work.Details
suite #201 & @202 - demo drops back to branchlines & replace (e) pendant sprinklers w/upright sprinklers. add armovers to ensure sprinklers are in correct distance for code compliance. any armovers greater than 4'-0". add branchline restrints seismic restraints for (e) pipe are not in scope of work. | $57,000 |
| Jan 6, 2011 | Completed final sign-off Mar 2011 | 901 Mission St | Transbay Fire Protection | ste #109 -demo drops back to branchlines & replace (e) pendant sprinklers w/upgright sprinkles. add armovers to ensure sprinklers are in correct distance for code compliance any armovers greater than 4'-0". add branchline restraints seismic restraints fo r (e) pipe are not in scope of work.Details
ste #109 -demo drops back to branchlines & replace (e) pendant sprinklers w/upgright sprinkles. add armovers to ensure sprinklers are in correct distance for code compliance any armovers greater than 4'-0". add branchline restraints seismic restraints fo r (e) pipe are not in scope of work. | $12,000 |
| Dec 28, 2010 | Never finaled issued Mar 2011, no final | 925 Mission St | T I Source Inc | conversion of one (e) office suite in office building to a-3 occupancy to allow periodic fundraising events for intersection for the arts in this suite at ground floorDetails
conversion of one (e) office suite in office building to a-3 occupancy to allow periodic fundraising events for intersection for the arts in this suite at ground floor | $23,000 |
| Dec 22, 2010 | Expired or cancelled withdrawn Nov 2018 | 901 Mission St | change of use of one (e) office suite in office building to a-3 ( public assembly) occupancy to use for periodic events.Details
change of use of one (e) office suite in office building to a-3 ( public assembly) occupancy to use for periodic events. | $26,000 | |
| Dec 8, 2010 | Completed final sign-off Dec 2010 | 901 Mission St | Intelligent Technologies & Services Inc | modify existing fire alarm audible ckt on 2nd fl power supply #6Details
modify existing fire alarm audible ckt on 2nd fl power supply #6 | $3,500 |
| Oct 22, 2010 | Completed final sign-off Dec 2010 | 901 Mission St | Transbay Fire Protection | suite 210 - replace 75 existing pendent sprinklers with upright sprinklers use exisitng outlets.Details
suite 210 - replace 75 existing pendent sprinklers with upright sprinklers use exisitng outlets. | $18,000 |
| Jul 30, 2010 | Completed final sign-off Oct 2010 | 925 Mission St | Intelligent Technologies & Services Inc | 1st floor-modify the (e) fire alarm audible circuit & power supplyDetails
1st floor-modify the (e) fire alarm audible circuit & power supply | $3,500 |
| Jul 16, 2010 | Completed final sign-off Oct 2010 | 925 Mission St | A K I Electric Inc | reference pa# 2010-0702-5898 (t.i. permit)-add electrical panel, receptacles, switches, remove & relocate lights, adding lights.Details
reference pa# 2010-0702-5898 (t.i. permit)-add electrical panel, receptacles, switches, remove & relocate lights, adding lights. | $14,000 |
| Jul 13, 2010 | Completed final sign-off Oct 2010 | 925 Mission St | Victory Fire Protection Inc | install 46 sprinkler heads off existing 1" drops to cover tenant space # 108 on 1st floor.Details
install 46 sprinkler heads off existing 1" drops to cover tenant space # 108 on 1st floor. | $9,200 |
| Jul 2, 2010 | Expired or cancelled expired Oct 2011 | 925 Mission St | T I Source Inc | sf school of digital making ( in the chronicle building). convert (e)vacant office to sf school of dm. interior wall, 2 tbar ceiling in lobby only.Details
sf school of digital making ( in the chronicle building). convert (e)vacant office to sf school of dm. interior wall, 2 tbar ceiling in lobby only. | $55,000 |
| Apr 30, 2010 | Completed final sign-off Sep 2010 | 901 Mission St | Intelligent Technologies & Services Inc | 1st floor modify the existing fire alarm audible ckt @power supplys 4 & 5.Details
1st floor modify the existing fire alarm audible ckt @power supplys 4 & 5. | $3,900 |
| Apr 28, 2010 | Completed final sign-off Sep 2010 | 901 Mission St | Ayoob & Peery Plumbing Co Inc | 1st floor. change & relocate fire-sprinkler heads per t.i.Details
1st floor. change & relocate fire-sprinkler heads per t.i. | $9,000 |
| Apr 22, 2010 | Completed final sign-off Sep 2011 | 925 Mission St | Rossi Builders Inc. | handicapped restroom remodel. new hallway off of 925 mission st lobby. new demising wall for vacant office suites.Details
handicapped restroom remodel. new hallway off of 925 mission st lobby. new demising wall for vacant office suites. | $35,000 |
| Apr 22, 2010 | Completed final sign-off Sep 2010 | 901 Mission St | Rossi Builders Inc. | revision to pa# 2010.03.19.8608. value engineering to approved ti. lower some full hgt walls to 10', remove some ceiling soffits to lower construction cost. add open art gallery space approx. 1,200 sqft.Details
revision to pa# 2010.03.19.8608. value engineering to approved ti. lower some full hgt walls to 10', remove some ceiling soffits to lower construction cost. add open art gallery space approx. 1,200 sqft. | $20,000 |
| Mar 19, 2010 | Never finaled issued Apr 2010, no final | 901 Mission St | Rossi Builders Inc. | 1st floor-office tenant improvement-interior remodel of (e) office area-new partitions, new lighting & electrical, some new ceiling soffits, new flooring & painting, new sink at (e) plumbing, new fire sprinkler drops & new hvac ducting onlyDetails
1st floor-office tenant improvement-interior remodel of (e) office area-new partitions, new lighting & electrical, some new ceiling soffits, new flooring & painting, new sink at (e) plumbing, new fire sprinkler drops & new hvac ducting only | $300,000 |
| Aug 31, 2007 | Completed final sign-off Aug 2008 | 901 Mission St | Alliance Roofing Co Inc | reroofingDetails
reroofing | $241,000 |
| Aug 24, 2006 | Completed final sign-off Nov 2006 | 901 Mission St | Alliance Roofing Co Inc | reroofingDetails
reroofing | $43,000 |
| Nov 29, 2005 | Expired or cancelled expired May 2007 | 925 Mission St | add speaker devices (ie.horn/strobe,strobes) and smoke detectors to existing fire alarm system.Details
add speaker devices (ie.horn/strobe,strobes) and smoke detectors to existing fire alarm system. | $6,000 | |
| Nov 8, 2005 | Never finaled issued Nov 2005, no final | 925 Mission St | renewing pa#2001/07/12/3489 for final inspection only - no office increaseDetails
renewing pa#2001/07/12/3489 for final inspection only - no office increase | ||
| Sep 2, 2005 | Never finaled issued Sep 2005, no final | 901 Mission St | Tom's Construction | erect single faced non-electric wall signDetails
erect single faced non-electric wall sign | |
| Mar 11, 2005 | Expired or cancelled expired Aug 2007 | 925 Mission St | Intelligent Technologies & Services Inc | ass builts dwgs for permit 200502105260 no increase in office spaceDetails
ass builts dwgs for permit 200502105260 no increase in office space | |
| Feb 10, 2005 | Never finaled issued Feb 2005, no final | 925 Mission St | renew app #200107123489Details
renew app #200107123489 | ||
| May 11, 2004 | Never finaled issued May 2004, no final | 901 Mission St | street space permitDetails
street space permit | ||
| Dec 1, 2003 | Expired or cancelled expired Jun 2004 | 901 Mission St | Thomas Swan Sign Co Inc | revised apprvd sign p/a#200311240998 from face lit letters to halo-lit letters (see attach)Details
revised apprvd sign p/a#200311240998 from face lit letters to halo-lit letters (see attach) | |
| Nov 24, 2003 | Expired or cancelled expired Jun 2004 | 901 Mission St | Thomas Swan Sign Co Inc | single faced electrical wall signDetails
single faced electrical wall sign | |
| Jul 12, 2001 | Never finaled issued Oct 2001, no final | 925 Mission St | install building fire alarm systemDetails
install building fire alarm system | $31,665 | |
| Apr 14, 2000 | Expired or cancelled cancelled Apr 2000 | 925 Mission St | concrete pad for generator and fuel tankDetails
concrete pad for generator and fuel tank | $42,500 | |
| Apr 7, 2000 | Expired or cancelled expired Sep 2001 | 925 Mission St | Alvarado Constrution Inc. | one-stop installation of 36" with antenna and 10 x 10 rooftop shelterDetails
one-stop installation of 36" with antenna and 10 x 10 rooftop shelter | $75,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.