Terri Flynn
- License
- C14261
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- Firm
- Flynn Architecture
- Based in
- Concord
- On San Francisco permits
- Mar 2010 to May 2011
5 permits since 2000 (architect on 5 permits): 4 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Howard S. Wright Constructors Lp (3), Cahill Contractors Inc, Rossi Builders Inc.
- Engineers
- Michael Gemmill
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 17, 2011 | Completed final sign-off Aug 2011 | 925 Mission St | Howard S. Wright Constructors Lp | 2/f- revision to 201104264783: add spiral stair to connect new 2nd floor office with 1st floor office. this is a convenience stair within a tenant space, not an exit stair. cost of cutting out slab included in previous permit.Details
2/f- revision to 201104264783: add spiral stair to connect new 2nd floor office with 1st floor office. this is a convenience stair within a tenant space, not an exit stair. cost of cutting out slab included in previous permit. | $1,000 |
| Apr 26, 2011 | Completed final sign-off Aug 2011 | 925 Mission St | Howard S. Wright Constructors Lp | 2nd floor office tenant improvement - demol (e) ofice improvements, provide 2 new exits to (e) corridor; build offices, meeting rooms & open office areas with cabinetry & related coffee bar plumbing.Details
2nd floor office tenant improvement - demol (e) ofice improvements, provide 2 new exits to (e) corridor; build offices, meeting rooms & open office areas with cabinetry & related coffee bar plumbing. | $390,000 |
| Apr 19, 2011 | Completed final sign-off Jul 2011 | 925 Mission St | Howard S. Wright Constructors Lp | (4) existing windows to be enlarged (west side of bldg).Details
(4) existing windows to be enlarged (west side of bldg). | $45,000 |
| Nov 12, 2010 | Completed final sign-off Feb 2011 | 110 05th St | Cahill Contractors Inc | add windows to (e) south wall. no other workDetails
add windows to (e) south wall. no other work | $60,000 |
| Mar 19, 2010 | Never finaled issued Apr 2010, no final | 901 Mission St | Rossi Builders Inc. | 1st floor-office tenant improvement-interior remodel of (e) office area-new partitions, new lighting & electrical, some new ceiling soffits, new flooring & painting, new sink at (e) plumbing, new fire sprinkler drops & new hvac ducting onlyDetails
1st floor-office tenant improvement-interior remodel of (e) office area-new partitions, new lighting & electrical, some new ceiling soffits, new flooring & painting, new sink at (e) plumbing, new fire sprinkler drops & new hvac ducting only | $300,000 |