Block 0268, lot 002
115 Sansome St
- City’s use
- Commercial Office
- Built
- 1912
- Stories
- 15
- Building
- 135,805 sq ft
- Lot
- 9,281 sq ft
- Zoning
- C3O
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
136 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 22, 2026 | In progress issued Jul 2026 | 115 Sansome St | E. J. Weber Elect.Co Inc | 5th flr. t-24; energy code compliant electical drawings to be added to pa#: 202605282106.Details
5th flr. t-24; energy code compliant electical drawings to be added to pa#: 202605282106. | $20,000 |
| Jul 10, 2026 | In progress issued Jul 2026 | 115 Sansome St | E. J. Weber Elect.Co Inc | 7/fl- 202606022314- deferred mep for title 24 energy compliant electrical drawings to be addedDetails
7/fl- 202606022314- deferred mep for title 24 energy compliant electrical drawings to be added | $40,000 |
| Jun 2, 2026 | In progress issued Jun 2026 | 115 Sansome St | Rudolph Commercial Interiors Inc, Rci | 7th fl: nonstructural interior construction and installation of new finishes in 2 new offices and 2 new phone rooms in portion of existing suite. construction of interior walls, partitions, rcp, lighting fixtures. electrical mechanical, mep and fire sprinkler modifications by design build contractorDetails
7th fl: nonstructural interior construction and installation of new finishes in 2 new offices and 2 new phone rooms in portion of existing suite. construction of interior walls, partitions, rcp, lighting fixtures. electrical mechanical, mep and fire sprinkler modifications by design build contractor | $32,000 |
| May 28, 2026 | In progress issued Jun 2026 | 115 Sansome St | Rudolph Commercial Interiors Inc, Rci | interior tenant improvement: demolition of non-structural partitons, new partitions for (2) new offices and coffee bar, new millwork plumbing fixtures, and lighting, electrical plumbing, fire and life safety under sep permit no havac at 115 sansome st. building has operable windows and steam heat.Details
interior tenant improvement: demolition of non-structural partitons, new partitions for (2) new offices and coffee bar, new millwork plumbing fixtures, and lighting, electrical plumbing, fire and life safety under sep permit no havac at 115 sansome st. building has operable windows and steam heat. | $351,895 |
| Dec 3, 2019 | Completed final sign-off Jan 2020 | 115 Sansome St | Gci, Inc | 10th flr partial scope office tenant retrofit: lighting, power & signal, wiring, lighting & controlDetails
10th flr partial scope office tenant retrofit: lighting, power & signal, wiring, lighting & control | $100,000 |
| Nov 5, 2019 | Completed final sign-off Nov 2019 | 115 Sansome St | Bilcor Inc | fire alarm for 3rd fl - install 3 ceiling mount strobe, install 1 weatherproof speaker strobe, install 5 control relay modules, install 1 wall mount speaker strobe, install 18 ceiling mount speaker strobes, install 2 smoke detectors with base.Details
fire alarm for 3rd fl - install 3 ceiling mount strobe, install 1 weatherproof speaker strobe, install 5 control relay modules, install 1 wall mount speaker strobe, install 18 ceiling mount speaker strobes, install 2 smoke detectors with base. | $19,800 |
| Nov 5, 2019 | Completed final sign-off Nov 2019 | 115 Sansome St | Bilcor Inc | fire alarm for suite 1050 - install 8 ceiling mount speaker strobes.Details
fire alarm for suite 1050 - install 8 ceiling mount speaker strobes. | $5,180 |
| Oct 22, 2019 | Completed final sign-off Nov 2019 | 115 Sansome St | Gci, Inc | 10th floor: revision to pa#201909202216. reconfigure office layout to reflect under 50 occupancyDetails
10th floor: revision to pa#201909202216. reconfigure office layout to reflect under 50 occupancy | |
| Oct 11, 2019 | Completed final sign-off Nov 2019 | 115 Sansome St | R L H Fire Protection Inc | 3rd flr. t.i fire sprinkler upgrade on (e) system. relocate 30 pendents, 13 additional pendent sprinklers, 6 additional upright sprinklers, 5 deleted upright sprinklers. ref pa 201907196346Details
3rd flr. t.i fire sprinkler upgrade on (e) system. relocate 30 pendents, 13 additional pendent sprinklers, 6 additional upright sprinklers, 5 deleted upright sprinklers. ref pa 201907196346 | $11,700 |
| Oct 9, 2019 | Completed final sign-off Nov 2019 | 115 Sansome St | Ayoob & Peery Plumbing Co Inc | 10th floor: add 2, relocate 28 and plug 3 sprinklers in order to conform with the new wall and layout of the t.i.Details
10th floor: add 2, relocate 28 and plug 3 sprinklers in order to conform with the new wall and layout of the t.i. | $7,350 |
| Oct 2, 2019 | Completed final sign-off Mar 2021 | 115 Sansome St | Ap- Build Inc | rev to pa# 201907196346; work includes additon of showerDetails
rev to pa# 201907196346; work includes additon of shower | $5,000 |
| Sep 20, 2019 | Completed final sign-off Jan 2020 | 115 Sansome St | Gci, Inc | 10th flr. demo of non structural interior walls, installtion of (n) non structural walls & finishesDetails
10th flr. demo of non structural interior walls, installtion of (n) non structural walls & finishes | $454,084 |
| Jul 19, 2019 | Completed final sign-off Dec 2019 | 115 Sansome St | Ap- Build Inc | ti on 3rd fl. interior work only. work invluces, new constuction of walls, plumbing fixtures, millwork & associated mep & sprinkler work. no coffee bar, self service coffee onlyDetails
ti on 3rd fl. interior work only. work invluces, new constuction of walls, plumbing fixtures, millwork & associated mep & sprinkler work. no coffee bar, self service coffee only | $850,000 |
| Jul 16, 2019 | Completed final sign-off Oct 2019 | 115 Sansome St | R L H Fire Protection Inc | 3rd flr fire sprinklers system upgrade for t.i. 3 deleted pendent sprinklers, 27 relocate upright sprinklers, 3 additional upright sprinklers. pa 201905171008.Details
3rd flr fire sprinklers system upgrade for t.i. 3 deleted pendent sprinklers, 27 relocate upright sprinklers, 3 additional upright sprinklers. pa 201905171008. | $6,300 |
| May 17, 2019 | Completed final sign-off Oct 2019 | 115 Sansome St | Ap- Build Inc | #300: non-structural demo of existing office space on 3rd fl only. no exterior work. per ab-017.(to remain vacant until adaa features restored.).since the lowered ceiling is being demoed,under separate appl. sprinkler contractor must immediately relocate the sprinklers to the concrete ceiling aboveDetails
#300: non-structural demo of existing office space on 3rd fl only. no exterior work. per ab-017.(to remain vacant until adaa features restored.).since the lowered ceiling is being demoed,under separate appl. sprinkler contractor must immediately relocate the sprinklers to the concrete ceiling above | $20,000 |
| Dec 27, 2018 | Never finaled issued Dec 2018, no final | 115 Sansome St | Principal Builders Inc. | ref pa# 201811206400; t-24 electrical to install new lighting and power on 8th fl.Details
ref pa# 201811206400; t-24 electrical to install new lighting and power on 8th fl. | $93,000 |
| Dec 20, 2018 | Completed final sign-off Jan 2019 | 115 Sansome St | Anderson, Rowe & Buckley, Inc. | ref pa# 201811206400 (e) fire sprinkler system t.i. 1 added sprinkler 9 relocated sprinklersDetails
ref pa# 201811206400 (e) fire sprinkler system t.i. 1 added sprinkler 9 relocated sprinklers | $5,000 |
| Dec 14, 2018 | Never finaled issued Dec 2018, no final | 115 Sansome St | Bilcor Inc | fire alarm ti on 8th fl: install 3 ceiling speaker strobes. relocate 1 cieling speake strobe. ref #201811206400.Details
fire alarm ti on 8th fl: install 3 ceiling speaker strobes. relocate 1 cieling speake strobe. ref #201811206400. | $2,400 |
| Nov 20, 2018 | Completed final sign-off Feb 2019 | 115 Sansome St | Principal Builders Inc. | 8th fl - ti to demo finishes and millwork and construct new non-structural partitions, ceiling and finishes. mep, sprinkler/ls on seperate permit.Details
8th fl - ti to demo finishes and millwork and construct new non-structural partitions, ceiling and finishes. mep, sprinkler/ls on seperate permit. | $406,146 |
| Oct 29, 2018 | Completed final sign-off Nov 2018 | 115 Sansome St | Bilcor Inc | 5th flr. fire alarm - install 3 ceiling mount speaker strobes ref 201809079380Details
5th flr. fire alarm - install 3 ceiling mount speaker strobes ref 201809079380 | $1,800 |
| Oct 22, 2018 | Never finaled issued Oct 2018, no final | 115 Sansome St | R L H Fire Protection Inc | fire sprinkler: relocate 5 and add 2 sprinklers on the 5th fl. ref ti #201809078380.Details
fire sprinkler: relocate 5 and add 2 sprinklers on the 5th fl. ref ti #201809078380. | $2,500 |
| Oct 19, 2018 | Completed final sign-off Mar 2019 | 115 Sansome St | Gci, Inc | new lighting and branch circuiting. new power and signal outletsDetails
new lighting and branch circuiting. new power and signal outlets | $292,000 |
| Oct 2, 2018 | Never finaled issued Oct 2018, no final | 115 Sansome St | C B F Inc | new lighting & controls, power & data for offices, title 24, kitchen power arch ref # 201805149068Details
new lighting & controls, power & data for offices, title 24, kitchen power arch ref # 201805149068 | $20,000 |
| Sep 26, 2018 | Completed final sign-off Oct 2018 | 115 Sansome St | Bilcor Inc | 2nd flr. ref pa# 201809119666; fire alarm t.i., install (1) ceiling mount speaker-strobe, install (3) ceiling mount strobes, remove (4) duet detectors, remove (4) control relaysDetails
2nd flr. ref pa# 201809119666; fire alarm t.i., install (1) ceiling mount speaker-strobe, install (3) ceiling mount strobes, remove (4) duet detectors, remove (4) control relays | $2,400 |
| Sep 11, 2018 | Completed final sign-off Oct 2018 | 115 Sansome St | Bilcor Inc | 2/f: fire alarm ti - install 20 ceiling speaker strobes; 3 smoke detectors with base; 8 duct detectors with housing; 8 control relay modules; 1 booster panel power supply. ref pa 2018-0514-9068Details
2/f: fire alarm ti - install 20 ceiling speaker strobes; 3 smoke detectors with base; 8 duct detectors with housing; 8 control relay modules; 1 booster panel power supply. ref pa 2018-0514-9068 | $20,000 |
| Sep 7, 2018 | Completed final sign-off Mar 2019 | 115 Sansome St | Gci, Inc | 5th fl, ste 500 - demo of non-structural partitions. new structural partitions, new doors/frame, new lightingDetails
5th fl, ste 500 - demo of non-structural partitions. new structural partitions, new doors/frame, new lighting | $185,000 |
| Sep 4, 2018 | Never finaled filed Sep 2018, never issued | 115 Sansome St | street space onlyDetails
street space only | ||
| Aug 20, 2018 | Completed final sign-off Nov 2018 | 115 Sansome St | Ap- Build Inc | reference 201805149068 mep for office tenant improvementDetails
reference 201805149068 mep for office tenant improvement | |
| Jul 5, 2018 | Never finaled issued Jul 2018, no final | 115 Sansome St | R L H Fire Protection Inc | fire sprinkler on 2nd fl: relocate 72, add 18, delete 6 fire sprinklers. ref ti #20180549068.Details
fire sprinkler on 2nd fl: relocate 72, add 18, delete 6 fire sprinklers. ref ti #20180549068. | $30,000 |
| Jun 11, 2018 | Completed final sign-off Nov 2018 | 115 Sansome St | Ap- Build Inc | revision to pa # 201805149068. 2nd floor - interior work for food prep serving counter and pantry prep roomDetails
revision to pa # 201805149068. 2nd floor - interior work for food prep serving counter and pantry prep room | |
| May 14, 2018 | Completed final sign-off Nov 2018 | 115 Sansome St | Ap- Build Inc | 2nd floor: t.i. adding new walls, restrooms and cleaned up finishes.Details
2nd floor: t.i. adding new walls, restrooms and cleaned up finishes. | $485,745 |
| Apr 26, 2018 | Completed final sign-off Nov 2018 | 115 Sansome St | Ap- Build Inc | (e) 2nd floor suite only - interior demo work only. demolition of a few walls, wall finishes & floor finishes; separate ti permit per ab-017 applies.Details
(e) 2nd floor suite only - interior demo work only. demolition of a few walls, wall finishes & floor finishes; separate ti permit per ab-017 applies. | $2,500 |
| Jan 22, 2018 | Expired or cancelled cancelled Jan 2026 | 115 Sansome St | 4th fl, ste 400 ti include demo of non-structural lpartitions and building (n) non-structural partitions. (n) door/frame and new/relocated light switching. ann (n) or revised meps, life safety and sprinklers if need will be design build submitted separatelyDetails
4th fl, ste 400 ti include demo of non-structural lpartitions and building (n) non-structural partitions. (n) door/frame and new/relocated light switching. ann (n) or revised meps, life safety and sprinklers if need will be design build submitted separately | $30,000 | |
| Dec 8, 2017 | Expired or cancelled cancelled Mar 2021 | 115 Sansome St | Gci, Inc | 2nd fl - tenant improvement, partitions, finishes, lighting & equipment, restrooms, conference room, open office, pantry, print room, reception areaDetails
2nd fl - tenant improvement, partitions, finishes, lighting & equipment, restrooms, conference room, open office, pantry, print room, reception area | $300,000 |
| Aug 16, 2017 | Completed final sign-off Jul 2018 | 115 Sansome St | C B F Inc | provide new lighting and branch circuiting to existing panel. maintain some of the existing power and signal outlets, provide additional new power branch circuiting, raceway systems as req to new power and signal outlets. title 24 compliance forms ref 201706068522Details
provide new lighting and branch circuiting to existing panel. maintain some of the existing power and signal outlets, provide additional new power branch circuiting, raceway systems as req to new power and signal outlets. title 24 compliance forms ref 201706068522 | $60,000 |
| Aug 10, 2017 | Completed final sign-off Sep 2017 | 115 Sansome St | Bilcor Inc | fire alarm ti - install 5 ceiling mount speaker/strobes; install 2 ceiling mount strobes. ref pa 2017-0606-8522Details
fire alarm ti - install 5 ceiling mount speaker/strobes; install 2 ceiling mount strobes. ref pa 2017-0606-8522 | $3,500 |
| Jul 20, 2017 | Completed final sign-off Sep 2017 | 115 Sansome St | Pribuss Engineering Inc | 8th floor fire sprinkler t.i. ref to #201706068522 - relcoated 26 sprinkler heads, added 1 sprinkler head. total 27 heads.Details
8th floor fire sprinkler t.i. ref to #201706068522 - relcoated 26 sprinkler heads, added 1 sprinkler head. total 27 heads. | $13,878 |
| Jun 23, 2017 | Never finaled issued Jun 2017, no final | 115 Sansome St | C B F Inc | lobby - lighting upgrades, title 24Details
lobby - lighting upgrades, title 24 | $50,000 |
| Jun 19, 2017 | Completed final sign-off Jun 2017 | 115 Sansome St | Field Construction Inc. | to obtain final inspection for work approved under pa# 201502269401. all work is completeDetails
to obtain final inspection for work approved under pa# 201502269401. all work is complete | |
| Jun 6, 2017 | Completed final sign-off Jul 2018 | 115 Sansome St | Field Construction Inc. | 8/f- t.i. demo of non-structural partitions, build (n) non-structural partitions, all new or revised meps, life safety and sprinklers will be design build and submitted seperately. bldg. is fully sprinklered.Details
8/f- t.i. demo of non-structural partitions, build (n) non-structural partitions, all new or revised meps, life safety and sprinklers will be design build and submitted seperately. bldg. is fully sprinklered. | $380,000 |
| Apr 21, 2017 | Completed final sign-off Jun 2017 | 115 Sansome St | Gci, Inc | historic door & door swing to remain. no additional work. revision to #2016-1223-5796.Details
historic door & door swing to remain. no additional work. revision to #2016-1223-5796. | |
| Mar 14, 2017 | Completed final sign-off Apr 2017 | 115 Sansome St | Bilcor Inc | f/a t.i.: delete installation of 2 control relay modules. delete installation of 2 duct detectors with housing. as-built to pa#201612235796Details
f/a t.i.: delete installation of 2 control relay modules. delete installation of 2 duct detectors with housing. as-built to pa#201612235796 | |
| Feb 15, 2017 | Never finaled issued Feb 2017, no final | 115 Sansome St | Gci, Inc | revision to 201612235796, remove ansul system from original permitDetails
revision to 201612235796, remove ansul system from original permit | |
| Feb 15, 2017 | Never finaled issued Feb 2017, no final | 115 Sansome St | Golden Gate Fire Protection Inc | 1st flr: fire sprinklers - relocate 7 pendents, relocate 1 upright ref 201612235796Details
1st flr: fire sprinklers - relocate 7 pendents, relocate 1 upright ref 201612235796 | $2,000 |
| Feb 9, 2017 | Completed final sign-off Apr 2017 | 115 Sansome St | Bilcor Inc | fire alarm ti relocate 1 ceiling mnt speaker strobe, 2 ceiling mount speaker strobe, 2 control relay, 2 duct detector with housing 201612235796Details
fire alarm ti relocate 1 ceiling mnt speaker strobe, 2 ceiling mount speaker strobe, 2 control relay, 2 duct detector with housing 201612235796 | $1,600 |
| Dec 23, 2016 | Completed final sign-off Jun 2017 | 115 Sansome St | Gci, Inc | 1 st flr: restaurant ti - plumbing, electrical lighting mechanical and new finishes. convert (e) retail to restaurantDetails
1 st flr: restaurant ti - plumbing, electrical lighting mechanical and new finishes. convert (e) retail to restaurant | $350,000 |
| Nov 9, 2016 | Never finaled issued Nov 2016, no final | 115 Sansome St | Pribuss Engineering Inc | fire sprinker as builts ref 201610069677Details
fire sprinker as builts ref 201610069677 | |
| Oct 25, 2016 | Completed final sign-off Nov 2016 | 115 Sansome St | Bilcor Inc | 11th floor: fire alarm t.i.: install 23 ceiling mount speaker strobes. install 2 smoke detectors with base. install 1 control relay module. ref app#201608195483Details
11th floor: fire alarm t.i.: install 23 ceiling mount speaker strobes. install 2 smoke detectors with base. install 1 control relay module. ref app#201608195483 | $10,000 |
| Oct 13, 2016 | Expired or cancelled cancelled Jan 2026 | 115 Sansome St | ground floor: to comply with das nov#20169521. reslope front landing, install power door operator and repair threshold.Details
ground floor: to comply with das nov#20169521. reslope front landing, install power door operator and repair threshold. | ||
| Oct 6, 2016 | Never finaled issued Oct 2016, no final | 115 Sansome St | Field Construction Inc. | suite 1100: relocate fc unit, inst. fc unit, install ductwork, & refrigerant pricing, provide nw lighting & branch circuiting to extg panel, maintain some extg power, provide additional nw power branch circuits & raceway systems as reqrd. provide ca title 24 compliances forms. ref app#201608195483Details
suite 1100: relocate fc unit, inst. fc unit, install ductwork, & refrigerant pricing, provide nw lighting & branch circuiting to extg panel, maintain some extg power, provide additional nw power branch circuits & raceway systems as reqrd. provide ca title 24 compliances forms. ref app#201608195483 | $300,000 |
| Oct 6, 2016 | Never finaled issued Oct 2016, no final | 115 Sansome St | Pribuss Engineering Inc | ste 100: fire srpinkler ti under pa 2016-0819-5483 - relocate 51, add 8Details
ste 100: fire srpinkler ti under pa 2016-0819-5483 - relocate 51, add 8 | $30,522 |
| Aug 19, 2016 | Completed final sign-off Jan 2017 | 115 Sansome St | Field Construction Inc. | demo of existing & buid back of tenant space. mep under separate permitDetails
demo of existing & buid back of tenant space. mep under separate permit | $554,924 |
| Jul 7, 2016 | Completed final sign-off Sep 2016 | 115 Sansome St | Field Construction Inc. | 14th flr: interior remodel to (e) tenant suite in a multi-tenant bld. new partitions, doors, windows (interior) for offices. minor hvac alteration. l/s under separate permit.Details
14th flr: interior remodel to (e) tenant suite in a multi-tenant bld. new partitions, doors, windows (interior) for offices. minor hvac alteration. l/s under separate permit. | $70,000 |
| Apr 14, 2016 | Expired or cancelled cancelled Jan 2026 | 115 Sansome St | interior tenant improvement ground floor for new limited service restaurant. smoke door release, sprinklers, mep, on separate permits.Details
interior tenant improvement ground floor for new limited service restaurant. smoke door release, sprinklers, mep, on separate permits. | $10,000 | |
| Jan 14, 2016 | Never finaled issued Jan 2016, no final | 115 Sansome St | C B F Inc | ground floor: improvements to extg restrooms including making title 24 compliant. reference app#201502269401Details
ground floor: improvements to extg restrooms including making title 24 compliant. reference app#201502269401 | $15,000 |
| Jan 11, 2016 | Completed final sign-off Jan 2016 | 115 Sansome St | Golden Gate Fire Protection Inc | fire sprnklers; relocate 1 upright sprinkler and add 1 dry pendent in new walk in cooler. ti 201505015214Details
fire sprnklers; relocate 1 upright sprinkler and add 1 dry pendent in new walk in cooler. ti 201505015214 | $2,000 |
| May 1, 2015 | Completed final sign-off Aug 2016 | 115 Sansome St | Teutonic Construction Inc | ground floor tenant improvement in (e) vacant space. construction of new bar including finishes, millwork, equipment lighting & plumbing. no exterior work.Details
ground floor tenant improvement in (e) vacant space. construction of new bar including finishes, millwork, equipment lighting & plumbing. no exterior work. | $500,000 |
| Apr 24, 2015 | Completed final sign-off Jun 2015 | 115 Sansome St | Pribuss Engineering Inc | 1st flr: fire sprinkler ti relocate 15 ref pa # 2015 0226 9401Details
1st flr: fire sprinkler ti relocate 15 ref pa # 2015 0226 9401 | $7,719 |
| Apr 10, 2015 | Completed final sign-off Jun 2016 | 115 Sansome St | Ayoob & Peery Plumbing Co Inc | relocate 3 fire sprinklers per t.i. ground floor bathrooms. ref app#201502269401Details
relocate 3 fire sprinklers per t.i. ground floor bathrooms. ref app#201502269401 | $1,542 |
| Mar 20, 2015 | Completed final sign-off Apr 2015 | 115 Sansome St | Bilcor Inc | fire alarm tenant- 3rd floor - install (14) ceiling mount speaker-strobes. relocate (1) pull station. ref t.i. #2015.0109.5317Details
fire alarm tenant- 3rd floor - install (14) ceiling mount speaker-strobes. relocate (1) pull station. ref t.i. #2015.0109.5317 | $5,600 |
| Feb 26, 2015 | Never finaled issued Mar 2015, no final | 115 Sansome St | Field Construction Inc. | 1st floor: t.i. includes demo of non-structural partitions, and finishes, new construction: new non structural partitions and new ada restrooms. meps included.Details
1st floor: t.i. includes demo of non-structural partitions, and finishes, new construction: new non structural partitions and new ada restrooms. meps included. | $108,608 |
| Feb 25, 2015 | Completed final sign-off Sep 2015 | 115 Sansome St | Bilcor Inc | fire alarm for tyi remove 1 ceiling mount speaker strobe. install 2 ceiling mount speaker strobesDetails
fire alarm for tyi remove 1 ceiling mount speaker strobe. install 2 ceiling mount speaker strobes | $1,200 |
| Feb 23, 2015 | Completed final sign-off Mar 2015 | 115 Sansome St | Bilcor Inc | as built - fire alarm tenant improvement: install 7 wall mount speaker strobes instead of 10 speaker strobes.Details
as built - fire alarm tenant improvement: install 7 wall mount speaker strobes instead of 10 speaker strobes. | $2,800 |
| Feb 18, 2015 | Completed final sign-off Jun 2016 | 115 Sansome St | Trainor Commercial Construction Inc. | interior remodel conisting of a coffee bar, furniture, ceilings, mep modifications. no structural work or exterior work.Details
interior remodel conisting of a coffee bar, furniture, ceilings, mep modifications. no structural work or exterior work. | $100,000 |
| Feb 6, 2015 | Completed final sign-off Jun 2016 | 115 Sansome St | Ayoob & Peery Plumbing Co Inc | relocate 23 sprinkler, plug 9 sprinkler and add 8 sprinklers. t.i. pa# 201501095317Details
relocate 23 sprinkler, plug 9 sprinkler and add 8 sprinklers. t.i. pa# 201501095317 | $15,420 |
| Jan 9, 2015 | Completed final sign-off Apr 2015 | 115 Sansome St | Field Construction Inc. | 3rd flr: revision to 201311222601 includes new partitions, etc and occupancy load change. no meps included in this revision.Details
3rd flr: revision to 201311222601 includes new partitions, etc and occupancy load change. no meps included in this revision. | |
| Oct 8, 2014 | Never finaled issued Apr 2015, no final | 115 Sansome St | Specialized Graphics Inc | fabrication and installation of two exterior non-illuminated blade signs double faced.Details
fabrication and installation of two exterior non-illuminated blade signs double faced. | $4,500 |
| Sep 25, 2014 | Completed final sign-off Dec 2014 | 115 Sansome St | R L H Fire Protection Inc | fire sprinkler : relocate 38 pendents; add 1 & relo 2 upgrights; 2nd fl; total 41. ref 201405286849Details
fire sprinkler : relocate 38 pendents; add 1 & relo 2 upgrights; 2nd fl; total 41. ref 201405286849 | $21,175 |
| Sep 17, 2014 | Completed final sign-off Mar 2015 | 115 Sansome St | Bilcor Inc | install 7 wall mount speaker strobes. 3 ceiling mount speaker strobesDetails
install 7 wall mount speaker strobes. 3 ceiling mount speaker strobes | $4,000 |
| Aug 15, 2014 | Completed final sign-off Aug 2014 | 115 Sansome St | Pribuss Engineering Inc | 12th floor - as-built permit for fire sprinkler. ref pa #2014.0715.1271.Details
12th floor - as-built permit for fire sprinkler. ref pa #2014.0715.1271. | |
| Aug 5, 2014 | Expired or cancelled withdrawn Sep 2014 | 115 Sansome St | 3rd flr t.i. includes: demo of non-structural partitions and building (n) non-structural partitions. all new or revised hvac, elec, plmbg & life safety. work will be design-built & submitted separately (bldg is fully sprinklered)Details
3rd flr t.i. includes: demo of non-structural partitions and building (n) non-structural partitions. all new or revised hvac, elec, plmbg & life safety. work will be design-built & submitted separately (bldg is fully sprinklered) | $375,000 | |
| Jul 15, 2014 | Completed final sign-off Aug 2014 | 115 Sansome St | Pribuss Engineering Inc | 12th floor fire sprinkler for t.i. - relocated 54 heads, added 4 heads. total 58 heads.Details
12th floor fire sprinkler for t.i. - relocated 54 heads, added 4 heads. total 58 heads. | $29,848 |
| Jun 30, 2014 | Never finaled issued Jun 2014, no final | 115 Sansome St | Bilcor Inc | 12th flr: t.i. #201312234835, install 18 ceiling mount speakers-strobesDetails
12th flr: t.i. #201312234835, install 18 ceiling mount speakers-strobes | $7,200 |
| Jun 12, 2014 | Completed final sign-off Jan 2016 | 115 Sansome St | Field Construction Inc. | ground floor and mezz levels. structural for new extg stair from mezz level to ground floor. per app#201405286849Details
ground floor and mezz levels. structural for new extg stair from mezz level to ground floor. per app#201405286849 | $150,000 |
| Jun 12, 2014 | Completed final sign-off Jan 2016 | 115 Sansome St | Field Construction Inc. | ground floor and mezz levels. mep for project per app#201405286849Details
ground floor and mezz levels. mep for project per app#201405286849 | $150,000 |
| Jun 6, 2014 | Completed final sign-off Jun 2014 | 115 Sansome St | Pribuss Engineering Inc | 14th floor: fire sprinkler t.i. relocate 2 pendent sprinklers.add 4 upright sprinklers, 6 heads at 514.62 total 3087.00 t. i. app#201403130685Details
14th floor: fire sprinkler t.i. relocate 2 pendent sprinklers.add 4 upright sprinklers, 6 heads at 514.62 total 3087.00 t. i. app#201403130685 | $3,087 |
| May 28, 2014 | Completed final sign-off Jul 2015 | 115 Sansome St | Field Construction Inc. | 1st floor & mezz - t.i. includes demo of non structural partitions, mezzanine to ground floor new exit stair (structural under separate permit), new non-str. partitions, new restrooms. all new or revised hvac, elect, plbg & life safety will be submitted separately. fully sprinklered.Details
1st floor & mezz - t.i. includes demo of non structural partitions, mezzanine to ground floor new exit stair (structural under separate permit), new non-str. partitions, new restrooms. all new or revised hvac, elect, plbg & life safety will be submitted separately. fully sprinklered. | $640,000 |
| May 5, 2014 | Completed final sign-off Feb 2015 | 115 Sansome St | Gidel & Kocal Construction Co Inc | 3rd floor - demo walls to open site to future tenant. sfab-017Details
3rd floor - demo walls to open site to future tenant. sfab-017 | $25,000 |
| Mar 13, 2014 | Completed final sign-off Aug 2014 | 115 Sansome St | R 3 Builders Inc. | 14th and 15th floors:upgrade extg finishes, add new casework, replace lighting construct new non-bearing partition walls for storage areas. new decorative ceiling feature to replace extg acoustic ceiling tile. mep & fire alarm under separate permitDetails
14th and 15th floors:upgrade extg finishes, add new casework, replace lighting construct new non-bearing partition walls for storage areas. new decorative ceiling feature to replace extg acoustic ceiling tile. mep & fire alarm under separate permit | $199,000 |
| Mar 4, 2014 | Completed final sign-off Mar 2014 | 115 Sansome St | Bilcor Inc | install 3 ceiling mount speakers/strobes.Details
install 3 ceiling mount speakers/strobes. | $1,200 |
| Feb 26, 2014 | Never finaled issued Feb 2014, no final | 115 Sansome St | Pribuss Engineering Inc | 11th floor: fire sprinkler t.i. adds 6, relocate 8 total 14. ref app# 201312234839.Details
11th floor: fire sprinkler t.i. adds 6, relocate 8 total 14. ref app# 201312234839. | $7,204 |
| Dec 23, 2013 | Completed final sign-off Sep 2014 | 115 Sansome St | Field Construction Inc. | 12th fl ti including demo of non structural paritons and building new non structural partitions. all new or revised hvac, electriclal, plumbing, and life safety work will be design, build and submitted for permit separately. building is fully sprinkleredDetails
12th fl ti including demo of non structural paritons and building new non structural partitions. all new or revised hvac, electriclal, plumbing, and life safety work will be design, build and submitted for permit separately. building is fully sprinklered | $438,000 |
| Dec 23, 2013 | Completed final sign-off Apr 2014 | 115 Sansome St | Field Construction Inc. | 11th fl ti includes bldg. new non structural partitions. existing non compliant accessible restoroms will not be upgraded due to cost constraints. see hardship.. all new or revised hvac, elec,plumbing,l/s design-build and submitted separately bldg fully sprinkleredDetails
11th fl ti includes bldg. new non structural partitions. existing non compliant accessible restoroms will not be upgraded due to cost constraints. see hardship.. all new or revised hvac, elec,plumbing,l/s design-build and submitted separately bldg fully sprinklered | $48,000 |
| Nov 25, 2013 | Completed final sign-off Jan 2014 | 115 Sansome St | Bilcor Inc | install 10 ceiling mounted speaker -strobes. replace 2 existing ceiling mount strobes with ceiling mount speaker-strobes in restroomsDetails
install 10 ceiling mounted speaker -strobes. replace 2 existing ceiling mount strobes with ceiling mount speaker-strobes in restrooms | $4,800 |
| Nov 22, 2013 | Completed final sign-off Apr 2015 | 115 Sansome St | Field Construction Inc. | 3/f- t.i. includes the demo of non-structural partitions and building new non-structural partitions. all new or revised meps, life safety work will be design build and submitted seperately.Details
3/f- t.i. includes the demo of non-structural partitions and building new non-structural partitions. all new or revised meps, life safety work will be design build and submitted seperately. | $375,000 |
| Nov 7, 2013 | Completed final sign-off Mar 2014 | 115 Sansome St | Pribuss Engineering Inc | 9th floor:fire sprinkler t.i. relocates 66, adds 05. total 71. ref app#201310240086Details
9th floor:fire sprinkler t.i. relocates 66, adds 05. total 71. ref app#201310240086 | $36,538 |
| Oct 24, 2013 | Completed final sign-off Jan 2014 | 115 Sansome St | Field Construction Inc. | 9th fl. ti includes demo of non structural partitions and building new. non structural paritions. all new or revised hvac, elec, plumbing and life safety. work be design build and submitted separtelyDetails
9th fl. ti includes demo of non structural partitions and building new. non structural paritions. all new or revised hvac, elec, plumbing and life safety. work be design build and submitted separtely | $375,000 |
| Oct 23, 2013 | Completed final sign-off Nov 2013 | 115 Sansome St | Bilcor Inc | fire alarm ti on 5th floor-install 17 ceiling mount speaker-strobes. t.i. pa# 201309187103Details
fire alarm ti on 5th floor-install 17 ceiling mount speaker-strobes. t.i. pa# 201309187103 | $6,800 |
| Oct 9, 2013 | Expired or cancelled cancelled Jan 2026 | 115 Sansome St | Bilcor Inc | install 18 ceiling mount speaker-strobesDetails
install 18 ceiling mount speaker-strobes | $7,200 |
| Oct 7, 2013 | Completed final sign-off Mar 2014 | 115 Sansome St | Pribuss Engineering Inc | fire sprinkler ti : relocate 63 heads, add 5, total 68. (ref 201309187103)Details
fire sprinkler ti : relocate 63 heads, add 5, total 68. (ref 201309187103) | $34,994 |
| Sep 26, 2013 | Never finaled issued Oct 2013, no final | 115 Sansome St | Matrix Hg Inc | 14th & 15th floor -mechanical only , ref pa #2013.08.14.4245. f/a under seperate permit.Details
14th & 15th floor -mechanical only , ref pa #2013.08.14.4245. f/a under seperate permit. | $62,073 |
| Sep 25, 2013 | Completed final sign-off Jan 2014 | 115 Sansome St | Field Construction Inc. | 14th floor: barrier removal to include the demolishing of extg restrooms and bldg of new unisex restrooms. (one ada restroom)Details
14th floor: barrier removal to include the demolishing of extg restrooms and bldg of new unisex restrooms. (one ada restroom) | $45,000 |
| Sep 25, 2013 | Completed final sign-off Oct 2013 | 115 Sansome St | Pribuss Engineering Inc | fire sprinkler t.i add 1, relocate 53, total 54. 14th & 15th flDetails
fire sprinkler t.i add 1, relocate 53, total 54. 14th & 15th fl | $27,789 |
| Sep 18, 2013 | Completed final sign-off Nov 2013 | 115 Sansome St | Field Construction Inc. | 5th floor:t.i. to include demo of non-structural partitions and bldgs of new non-structural partitions. mep and life safty under seperate permit.Details
5th floor:t.i. to include demo of non-structural partitions and bldgs of new non-structural partitions. mep and life safty under seperate permit. | $435,000 |
| Aug 28, 2013 | Completed final sign-off Nov 2013 | 115 Sansome St | Bilcor Inc | 14th & 15th flrs: relocate 1 pull station. remove and reinstall 3 speaker strobes. remove 1 strobeDetails
14th & 15th flrs: relocate 1 pull station. remove and reinstall 3 speaker strobes. remove 1 strobe | $2,000 |
| Aug 14, 2013 | Completed final sign-off Nov 2013 | 115 Sansome St | Field Construction Inc. | 14/f, 15/f- t.i. includes the demo of non-structural partitions and building (n) non structural partitions. all new or revised hvac, electrical, plumbing and life safety work will be design-build and submitted seperately, building fully sprinklered.Details
14/f, 15/f- t.i. includes the demo of non-structural partitions and building (n) non structural partitions. all new or revised hvac, electrical, plumbing and life safety work will be design-build and submitted seperately, building fully sprinklered. | $423,000 |
| Mar 20, 2013 | Never finaled issued Mar 2013, no final | 115 Sansome St | Field Construction Inc. | ground floor:t.i. include the demolishing of non structural partitions, lighting and finishes. bldg is fully sprinklered.Details
ground floor:t.i. include the demolishing of non structural partitions, lighting and finishes. bldg is fully sprinklered. | $40,000 |
| Feb 27, 2013 | Completed final sign-off Mar 2013 | 115 Sansome St | C B F Inc | 7th fl fire alarm, install 17 ceiling mount speakers-strobes. install 2 ceiling mount speakers. t.i. pa#2013-0111-7744Details
7th fl fire alarm, install 17 ceiling mount speakers-strobes. install 2 ceiling mount speakers. t.i. pa#2013-0111-7744 | $7,600 |
| Feb 7, 2013 | Completed final sign-off Mar 2013 | 115 Sansome St | Pribuss Engineering Inc | 7th floor fire sprinkler t.i. #2013.01.11.7744 - relocate 14 sprinklers, relocate & change out 45 sprinklers, add 9 sprinklers, total 68Details
7th floor fire sprinkler t.i. #2013.01.11.7744 - relocate 14 sprinklers, relocate & change out 45 sprinklers, add 9 sprinklers, total 68 | $34,994 |
| Jan 11, 2013 | Never finaled issued Jan 2013, no final | 115 Sansome St | Field Construction Inc. | 7th floor:t.i. include the demolishing of non structural partitions and build new non structural partitions. all new or revised hvac, electrical,plmbg and life safety work will be design, build and submitted for permit separately. building is fully sprinklered.Details
7th floor:t.i. include the demolishing of non structural partitions and build new non structural partitions. all new or revised hvac, electrical,plmbg and life safety work will be design, build and submitted for permit separately. building is fully sprinklered. | $275,000 |
| Oct 23, 2012 | Completed final sign-off Apr 2013 | 115 Sansome St | Pribuss Engineering Inc | 11th floor-fire sprinkler t.i-relocate 17 sprinklers. ti pa# 2012-0620-2993Details
11th floor-fire sprinkler t.i-relocate 17 sprinklers. ti pa# 2012-0620-2993 | $8,750 |
| Sep 21, 2012 | Never finaled issued Mar 2013, no final | 115 Sansome St | Field Construction Inc. | ground & mezz floors. demo of non-structural partitions, lights and finishes. bldg fully sprinklered. ab-017. maintaining the exit path for the bldg and elevator lobby.Details
ground & mezz floors. demo of non-structural partitions, lights and finishes. bldg fully sprinklered. ab-017. maintaining the exit path for the bldg and elevator lobby. | $50,000 |
| Jun 20, 2012 | Completed final sign-off Nov 2012 | 115 Sansome St | Field Construction Inc. | 11th floor:t.i. new carpet, paint, acoustic ceiling tile, new lighting, new entry door.Details
11th floor:t.i. new carpet, paint, acoustic ceiling tile, new lighting, new entry door. | $45,000 |
| May 24, 2012 | Completed final sign-off Sep 2012 | 115 Sansome St | C B F Inc | 4th floor:t.i. on the 4th floor. scope includes: 75 light fixtures, 20 sensors, 7 switches, 34 receptacles, 15 furnature feeds, and 3 floor mounted outlets. fa/sprinklers under separate permitsDetails
4th floor:t.i. on the 4th floor. scope includes: 75 light fixtures, 20 sensors, 7 switches, 34 receptacles, 15 furnature feeds, and 3 floor mounted outlets. fa/sprinklers under separate permits | $65,000 |
| May 16, 2012 | Completed final sign-off May 2012 | 115 Sansome St | Pribuss Engineering Inc | 4th floor-fire sprinkler t.i-add 7 sprinklers, relocated 60 sprinklersDetails
4th floor-fire sprinkler t.i-add 7 sprinklers, relocated 60 sprinklers | $34,400 |
| May 14, 2012 | Completed final sign-off Jul 2012 | 115 Sansome St | Pyro-Comm Systems, Inc. | 4th floor:relocation of extg speaker/strobe devices to provide proper coverage for t. i..Details
4th floor:relocation of extg speaker/strobe devices to provide proper coverage for t. i.. | $3,500 |
| Apr 19, 2012 | Completed final sign-off Oct 2012 | 115 Sansome St | Field Construction Inc. | 4th floor:t.i. include the demolishing of nonstructural partitions and build new nonstructural partitions. all new or revised hvac, electrical, plmg and life safety work will be design-build and submitted for permit seperately.Details
4th floor:t.i. include the demolishing of nonstructural partitions and build new nonstructural partitions. all new or revised hvac, electrical, plmg and life safety work will be design-build and submitted for permit seperately. | $275,000 |
| Feb 29, 2012 | Completed final sign-off Apr 2013 | 115 Sansome St | Pribuss Engineering Inc | fire sprinkler compliance work. 72 fired sprinklers; various floors. 514.62Details
fire sprinkler compliance work. 72 fired sprinklers; various floors. 514.62 | $37,053 |
| Dec 1, 2011 | Completed final sign-off Apr 2013 | 115 Sansome St | C B F Inc | electrical upgrade as part of tenant improvment. scope includes 39 light fixtures, 2 gang wall switches, 5 wall mounted sensor switches, 6 ceiling mounted occupancy sensors, 16 receptacles, 1 flush floor power data deviceDetails
electrical upgrade as part of tenant improvment. scope includes 39 light fixtures, 2 gang wall switches, 5 wall mounted sensor switches, 6 ceiling mounted occupancy sensors, 16 receptacles, 1 flush floor power data device | $63,000 |
| Dec 1, 2011 | Completed final sign-off Sep 2012 | 115 Sansome St | C B F Inc | 6th floor: electrical upgrade as part of tenant improvement. scope includes 65 light fixtures, 65 receptacles, 13 furniture feeds, 2 flush floor power data combo outlets, 11 wall mounted occupancy sensor switches, 8 ceiling mounted occupancy sensors, (3) 2 gang switch locationsDetails
6th floor: electrical upgrade as part of tenant improvement. scope includes 65 light fixtures, 65 receptacles, 13 furniture feeds, 2 flush floor power data combo outlets, 11 wall mounted occupancy sensor switches, 8 ceiling mounted occupancy sensors, (3) 2 gang switch locations | $115,000 |
| Nov 21, 2011 | Completed final sign-off Dec 2011 | 115 Sansome St | Pribuss Engineering Inc | floor 8th fire sprinkler t.i. - plug 7 outlets, add 8 sprinklers, relocate 38 sprinklers, total 46 heads.Details
floor 8th fire sprinkler t.i. - plug 7 outlets, add 8 sprinklers, relocate 38 sprinklers, total 46 heads. | $23,673 |
| Nov 21, 2011 | Completed final sign-off Dec 2011 | 115 Sansome St | Pribuss Engineering Inc | floor 6th fire sprinkler t.i. - add 6 sprinklers, relocate 56 sprinklers, total 62 heads.Details
floor 6th fire sprinkler t.i. - add 6 sprinklers, relocate 56 sprinklers, total 62 heads. | $31,906 |
| Nov 17, 2011 | Completed final sign-off Jun 2012 | 115 Sansome St | Pyro-Comm Systems, Inc. | voluntary upgrade fire alarm system replacement project. no exterior work.Details
voluntary upgrade fire alarm system replacement project. no exterior work. | $300,000 |
| Nov 8, 2011 | Completed final sign-off Feb 2012 | 115 Sansome St | Pyro-Comm Systems, Inc. | 8th floor:add new field power supply to electrical closet, adding six (6) new speakers and strobes to open office, conference rooms, break area.Details
8th floor:add new field power supply to electrical closet, adding six (6) new speakers and strobes to open office, conference rooms, break area. | $6,000 |
| Nov 8, 2011 | Completed final sign-off Dec 2011 | 115 Sansome St | Pyro-Comm Systems, Inc. | 6th floor:add new field power supply to electrical closet, new speakers and strobes added throughout new tenant areas in open office, conference rooms and break room.Details
6th floor:add new field power supply to electrical closet, new speakers and strobes added throughout new tenant areas in open office, conference rooms and break room. | $6,000 |
| Oct 19, 2011 | Completed final sign-off Mar 2012 | 115 Sansome St | Field Construction Inc. | 8th fl ti: new non structural partition and upgraded restroom. demo work in suite 800 and 810 sep permit. refer to sheet ad.8 for reference only. new or revised hvac, elec, plumbinf, life safety design build and submitted under sep permit.Details
8th fl ti: new non structural partition and upgraded restroom. demo work in suite 800 and 810 sep permit. refer to sheet ad.8 for reference only. new or revised hvac, elec, plumbinf, life safety design build and submitted under sep permit. | $347,837 |
| Oct 19, 2011 | Completed final sign-off Jun 2012 | 115 Sansome St | Field Construction Inc. | 6th floor ti: includes demo of non structural partitions and building non structural partitions. demo under sep permit. ref sheet ad.06 for additional demo. all new or revised hvac, elec, plumb, life safety design build and submitted separately. fully sprinkleredDetails
6th floor ti: includes demo of non structural partitions and building non structural partitions. demo under sep permit. ref sheet ad.06 for additional demo. all new or revised hvac, elec, plumb, life safety design build and submitted separately. fully sprinklered | $581,781 |
| Jun 27, 2011 | Completed final sign-off Mar 2012 | 115 Sansome St | Field Construction Inc. | 8th floor-partial floor demolition of non-structural partition in 2 un-occupied spaces. building is fully sprinklered, per ab-017Details
8th floor-partial floor demolition of non-structural partition in 2 un-occupied spaces. building is fully sprinklered, per ab-017 | $23,755 |
| Jun 15, 2011 | Completed final sign-off Jun 2012 | 115 Sansome St | Field Construction Inc. | 6th floor: full floor demolition of non-structural partitions in an unoccupied space. bldg is fully sprinklered.Details
6th floor: full floor demolition of non-structural partitions in an unoccupied space. bldg is fully sprinklered. | $35,000 |
| Jun 1, 2011 | Never finaled issued Jun 2011, no final | 115 Sansome St | street space and mta parkingDetails
street space and mta parking | ||
| Apr 26, 2011 | Completed final sign-off Feb 2012 | 115 Sansome St | Arg Conservation Services | repair/restore (e) brick facade in kind.Details
repair/restore (e) brick facade in kind. | $65,000 |
| Jan 31, 2011 | Never finaled issued Jan 2011, no final | 115 Sansome St | street spaceDetails
street space | ||
| Nov 5, 2010 | Never finaled issued Nov 2010, no final | 115 Sansome St | street space permit (m219549)Details
street space permit (m219549) | ||
| Oct 14, 2010 | Never finaled issued Dec 2010, no final | 200 Bush St | Stripe Inc. Dba Garnett Sign Studio | to erect electrical, single faced, door/window sign.Details
to erect electrical, single faced, door/window sign. | $1,600 |
| Sep 7, 2010 | Never finaled issued Sep 2010, no final | 115 Sansome St | street space permitDetails
street space permit | ||
| Jul 13, 2010 | Never finaled issued Jul 2010, no final | 115 Sansome St | street space permitDetails
street space permit | ||
| Oct 21, 2008 | Never finaled issued Oct 2008, no final | 115 Sansome St | removal of communicating opening on 2nd floor per sfbc ab-010. infill with 4 hour rated wallDetails
removal of communicating opening on 2nd floor per sfbc ab-010. infill with 4 hour rated wall | $8,000 | |
| Oct 15, 2008 | Never finaled issued Oct 2008, no final | 115 Sansome St | street space.Details
street space. | ||
| Sep 11, 2006 | Completed final sign-off Mar 2007 | 115 Sansome St | Gucho Plumbing | complete fire sprinkler system 5 floors. 60 to 70 headsDetails
complete fire sprinkler system 5 floors. 60 to 70 heads | $25,000 |
| Jan 15, 2004 | Completed final sign-off Apr 2004 | 115 Sansome St | replace front desk w/h.c. counterDetails
replace front desk w/h.c. counter | $2,000 | |
| Oct 22, 2003 | Completed final sign-off Apr 2004 | 115 Sansome St | replace plat form display against windowDetails
replace plat form display against window | $3,000 | |
| Jul 31, 2002 | Expired or cancelled expired Jan 2004 | 115 Sansome St | lessee requests approvl of change in occupancy classification of grnd flr spc from b to m classificaDetails
lessee requests approvl of change in occupancy classification of grnd flr spc from b to m classifica | $500 | |
| Apr 5, 2001 | Expired or cancelled expired Aug 2001 | 115 Sansome St | Park Place Contractors | renew appl#9925264 for final inspectionDetails
renew appl#9925264 for final inspection | |
| Jan 18, 2001 | Expired or cancelled expired Jul 2001 | 115 Sansome St | Pribuss Engineering Inc | replacement of sprinklr heads shall have the omega sprinkler replacemnt k factors orifice size, timeDetails
replacement of sprinklr heads shall have the omega sprinkler replacemnt k factors orifice size, time | $14,800 |
| Jun 1, 2000 | Expired or cancelled cancelled Jan 2002 | 115 Sansome St | C B F Inc | life safety modification 1st floorDetails
life safety modification 1st floor | $4,700 |
| Mar 18, 2000 | Expired or cancelled expired Mar 2001 | 115 Sansome St | new control station antenna mounted to corner of buildingDetails
new control station antenna mounted to corner of building | $50,000 |