George Schevon
- Listed as
- architect, authorized agent-others
- Firm
- Studio 4 Architects
- Based in
- Berkeley
- On San Francisco permits
- May 2001 to Jun 2024
20 permits since 2000 (architect on 18 permits, authorized agent-others on 2 permits): 6 completed, 2 in progress, 6 never finaled, 6 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 25, 2024 | In progress issued Jun 2024 | 1501 Folsom St | Terra Nova Industries | selective demo prior to remodel of existing nightclub and restaurant.Details
selective demo prior to remodel of existing nightclub and restaurant. | $89,000 |
| Aug 30, 2023 | Completed final sign-off Apr 2025 | 1444 Mcallister St | replace (e) front entry door. convert 2 (e) restrooms to an accessible all gender restroom on the 1st fl for the purpose of barrier rmoval. alteration and remodel of (e) ground fl entry area, office, hallway, waiting area, conference rm & multipurpose rm by removing non-str wallsDetails
replace (e) front entry door. convert 2 (e) restrooms to an accessible all gender restroom on the 1st fl for the purpose of barrier rmoval. alteration and remodel of (e) ground fl entry area, office, hallway, waiting area, conference rm & multipurpose rm by removing non-str walls | $150,000 | |
| Oct 26, 2022 | In progress issued May 2026 | 1501 Folsom St | Terra Nova Industries | remodel of existing nightclub and restaurant to include: interior alterations at all floors; rebuild of stair 2 to meet egress and ada requirements. (n) outdoor bar at level 3 outdoor occupied roof deck. restooms to be redesigned as all gender multi-user. new hvac systems, & minor structural.Details
remodel of existing nightclub and restaurant to include: interior alterations at all floors; rebuild of stair 2 to meet egress and ada requirements. (n) outdoor bar at level 3 outdoor occupied roof deck. restooms to be redesigned as all gender multi-user. new hvac systems, & minor structural. | $975,000 |
| Sep 21, 2020 | Never finaled filed Sep 2020, never issued | 2519 20th Av | alter an (e), single family residence, add a new, no waiver adu at an (e) storage space on the 1st story, and add two decks on the 2nd story. remove and replace stair in rear yard. remove porch at the third story. replace windows and doors. add a first story horizontal addition at the adu.Details
alter an (e), single family residence, add a new, no waiver adu at an (e) storage space on the 1st story, and add two decks on the 2nd story. remove and replace stair in rear yard. remove porch at the third story. replace windows and doors. add a first story horizontal addition at the adu. | $150,000 | |
| Aug 10, 2018 | Expired or cancelled expired Feb 2024 | 539 Valencia St | Brinkerhoff Construction | install nw appliances/nw fixtures to an extg vacant retail space. to create new cafe counter and work area, office/storage space, new seating area at gridline one new storefront and new bulk head at store facade & nw acesble toilet & da ch/list under #201809079548. nw mech, elect, & plumbing als0Details
install nw appliances/nw fixtures to an extg vacant retail space. to create new cafe counter and work area, office/storage space, new seating area at gridline one new storefront and new bulk head at store facade & nw acesble toilet & da ch/list under #201809079548. nw mech, elect, & plumbing als0 | $100,000 |
| Jan 24, 2018 | Expired or cancelled expired May 2024 | 535 Valencia St | Gorman Construction | revision to pa #201710201825 adding scope: voluntary structural improvements. new trash rom on 2nd story to comply with nov #201653951 #3. bath and kitchen remodel in unit #1. to comply with nov #201642631.Details
revision to pa #201710201825 adding scope: voluntary structural improvements. new trash rom on 2nd story to comply with nov #201653951 #3. bath and kitchen remodel in unit #1. to comply with nov #201642631. | $50,000 |
| Oct 20, 2017 | Expired or cancelled expired Jan 2025 | 535 Valencia St | Gorman Construction | to comply with nov#201761504, 201653951, 201644232, remodel of mixed use bldg., remodel 4 apts. remove/replace (e) balconies and (e) roof, remove/replace exterior doors & windows. modify (e) storefront at 539 valencia.Details
to comply with nov#201761504, 201653951, 201644232, remodel of mixed use bldg., remodel 4 apts. remove/replace (e) balconies and (e) roof, remove/replace exterior doors & windows. modify (e) storefront at 539 valencia. | $200,000 |
| Apr 25, 2017 | Never finaled issued Mar 2018, no final | 153 Santa Ynez Av | Actually Design Build Inc, Daniel Kelly Construction | horizontal addition.fill litewell to expand kitchen.divide garage to create sep living space,create living rm,bedrm&laundry&bath in lower level garage.expand lower level below cantilevered bedrm&deck.create stair to access space in lower level.reconf bathrm,bedrm,mstr bedrm.Details
horizontal addition.fill litewell to expand kitchen.divide garage to create sep living space,create living rm,bedrm&laundry&bath in lower level garage.expand lower level below cantilevered bedrm&deck.create stair to access space in lower level.reconf bathrm,bedrm,mstr bedrm. | $160,000 |
| Mar 17, 2017 | Expired or cancelled withdrawn Apr 2017 | 153 Santa Ynez Av | fill lightwell to expand (e) kitchen, divid garage to create living spaces, expand lower level below (e) cantelivered nedroom, create new stair to access garage level, remove select int. partitions. fill lightwell to expand (e) masterDetails
fill lightwell to expand (e) kitchen, divid garage to create living spaces, expand lower level below (e) cantelivered nedroom, create new stair to access garage level, remove select int. partitions. fill lightwell to expand (e) master | $200,000 | |
| Jul 7, 2016 | Completed final sign-off Sep 2016 | 115 Sansome St | Field Construction Inc. | 14th flr: interior remodel to (e) tenant suite in a multi-tenant bld. new partitions, doors, windows (interior) for offices. minor hvac alteration. l/s under separate permit.Details
14th flr: interior remodel to (e) tenant suite in a multi-tenant bld. new partitions, doors, windows (interior) for offices. minor hvac alteration. l/s under separate permit. | $70,000 |
| Apr 29, 2016 | Never finaled issued May 2016, no final | 239 Randall St | #239: remove partitions, enlarge (e) bath to greate new full bath, remodel kitchen, remove shed roof above deck rear facade, remove sliding door & replace w/window. replace all windows @top flr. #241: remove partitions, enlarge bath to full bath, replace select windows on 2nd flr, remodel kitchen.Details
#239: remove partitions, enlarge (e) bath to greate new full bath, remodel kitchen, remove shed roof above deck rear facade, remove sliding door & replace w/window. replace all windows @top flr. #241: remove partitions, enlarge bath to full bath, replace select windows on 2nd flr, remodel kitchen. | $100,000 | |
| Mar 25, 2016 | Never finaled issued Apr 2016, no final | 2102 Union St | Blackline Construction | install projecting single faced sign "skinworx"Details
install projecting single faced sign "skinworx" | $5,000 |
| Mar 25, 2016 | Never finaled issued Apr 2016, no final | 2102 Union St | Blackline Construction | install projecting sign "skinworx"Details
install projecting sign "skinworx" | $5,000 |
| Mar 25, 2016 | Completed final sign-off Jun 2016 | 2102 Union St | Blackline Construction | demo of (e) partitions & finishes & casework. new exit signage. new exterior facade signage. demo of (e) suspend ceiling new casework & display fixtures (n) lighting (n) finishes.Details
demo of (e) partitions & finishes & casework. new exit signage. new exterior facade signage. demo of (e) suspend ceiling new casework & display fixtures (n) lighting (n) finishes. | $115,000 |
| Feb 9, 2016 | Completed final sign-off Mar 2017 | 4229 20th St | interior remodel of 4229 20th st (top floor unit) to include (n) bathroom, remodel (e) bath & kitchen, (n) plumbing fixtures (n) led lighting throughout. (n) forced air heating system.Details
interior remodel of 4229 20th st (top floor unit) to include (n) bathroom, remodel (e) bath & kitchen, (n) plumbing fixtures (n) led lighting throughout. (n) forced air heating system. | $80,000 | |
| Mar 13, 2014 | Completed final sign-off Aug 2014 | 115 Sansome St | R 3 Builders Inc. | 14th and 15th floors:upgrade extg finishes, add new casework, replace lighting construct new non-bearing partition walls for storage areas. new decorative ceiling feature to replace extg acoustic ceiling tile. mep & fire alarm under separate permitDetails
14th and 15th floors:upgrade extg finishes, add new casework, replace lighting construct new non-bearing partition walls for storage areas. new decorative ceiling feature to replace extg acoustic ceiling tile. mep & fire alarm under separate permit | $199,000 |
| Jan 25, 2013 | Expired or cancelled expired Mar 2026 | 3434 17th St | accessibility upgrade (voluntary) consisting of removal & replacement of (e) interior conc stairs, removal & replacement of (e) exterior door & landing. enlargement of (e) bathroom to accessible bath.Details
accessibility upgrade (voluntary) consisting of removal & replacement of (e) interior conc stairs, removal & replacement of (e) exterior door & landing. enlargement of (e) bathroom to accessible bath. | $60,000 | |
| Jul 21, 2008 | Expired or cancelled expired Apr 2017 | 348 Church St | Fidelity Roof Company | repair of water damaged exterior roof surfaces, exterior windows and sliding doors and selected interior and exterior finishes at the ex. 3rd and 4th floors. removal and replacement of ex.mtl grd rails. structural upgrade to the ex. plywood decking. remove and replace ex. guttersDetails
repair of water damaged exterior roof surfaces, exterior windows and sliding doors and selected interior and exterior finishes at the ex. 3rd and 4th floors. removal and replacement of ex.mtl grd rails. structural upgrade to the ex. plywood decking. remove and replace ex. gutters | $120,000 |
| Jun 21, 2001 | Completed final sign-off May 2003 | 555 Lisbon St | repair of (e) deck over permissible obstructionDetails
repair of (e) deck over permissible obstruction | $35,000 | |
| May 24, 2001 | Never finaled issued Jun 2001, no final | 988 Market St | lobby renovation including replaced entry doors revise to app #200009201103 for lobby remodelDetails
lobby renovation including replaced entry doors revise to app #200009201103 for lobby remodel | $20,000 |