Block 3558, lot 114
348 Church St
- City’s use
- Single Family Residential
- Built
- 1995
- Stories
- 1
- Units
- 1
- Rooms
- 2 bedrooms, 2 bathrooms
- Building
- 1,073 sq ft
- Zoning
- RM2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 12, 2026 | Completed final sign-off May 2026 | 348 Church St | International Fire Inc | as built to pa 202308083961, 202508082643 change 3 horn strobes to wirelessDetails
as built to pa 202308083961, 202508082643 change 3 horn strobes to wireless | $300 |
| Aug 8, 2025 | Completed final sign-off May 2026 | 348 Church St | International Fire Inc | as builts to pa # 2023-0808-3961. change system to addressable with wireless low frequency sounders.Details
as builts to pa # 2023-0808-3961. change system to addressable with wireless low frequency sounders. | $9,400 |
| Aug 8, 2023 | Completed final sign-off May 2026 | 348 Church St | International Fire Inc | like for like fire system replacement with upgrade. replace (e) facu in same location with ms-10ud. replace (e) smoke detector and pull station at same location. replace existing common area bells with horn/strobes, add a radio to monitor system and install low frequency sounders in each sleeping roDetails
like for like fire system replacement with upgrade. replace (e) facu in same location with ms-10ud. replace (e) smoke detector and pull station at same location. replace existing common area bells with horn/strobes, add a radio to monitor system and install low frequency sounders in each sleeping ro | $16,500 |
| Nov 9, 2017 | Completed final sign-off Jan 2018 | 348 Church St | Itu Construction | remodel (e) master bathroom, in kindDetails
remodel (e) master bathroom, in kind | $25,000 |
| May 9, 2017 | Completed final sign-off Sep 2017 | 348 Church St | Robinson Renovations | in-kind remodel of (e) kitchen& bathroom at (e) locations. new fixtures & finishes. no structural changes.Details
in-kind remodel of (e) kitchen& bathroom at (e) locations. new fixtures & finishes. no structural changes. | $12,000 |
| Sep 11, 2015 | Completed final sign-off Dec 2015 | 348 Church St | Super Roofing Company | reroofingDetails
reroofing | $32,500 |
| Sep 23, 2011 | Never finaled issued Sep 2011, no final | 348 Church St | street spaceDetails
street space | ||
| Jul 21, 2008 | Expired or cancelled expired Apr 2017 | 348 Church St | Fidelity Roof Company | repair of water damaged exterior roof surfaces, exterior windows and sliding doors and selected interior and exterior finishes at the ex. 3rd and 4th floors. removal and replacement of ex.mtl grd rails. structural upgrade to the ex. plywood decking. remove and replace ex. guttersDetails
repair of water damaged exterior roof surfaces, exterior windows and sliding doors and selected interior and exterior finishes at the ex. 3rd and 4th floors. removal and replacement of ex.mtl grd rails. structural upgrade to the ex. plywood decking. remove and replace ex. gutters | $120,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.