Block 4310, lot 003
640 Cesar Chavez St
- City’s use
- Industrial
- Built
- 1953
- Rooms
- 1 bathroom
- Building
- 48,612 sq ft
- Lot
- 122,355 sq ft
- Zoning
- M2
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
22 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 24, 2023 | Completed final sign-off Jul 2023 | 640 Cesar Chavez St | Big Joe California North Inc | install non-high piled storage racks of 100 linear feet x 8' high racks and 82 lineer feet x 12' high racks w/ top of products no more than 12' high.Details
install non-high piled storage racks of 100 linear feet x 8' high racks and 82 lineer feet x 12' high racks w/ top of products no more than 12' high. | $20,000 |
| Mar 30, 2023 | Completed final sign-off Jun 2023 | 640 Cesar Chavez St | Central Coating Company | reroofing: repair and re-roof approx. 48,000 sq ft with title 24-compliant spray polyurethane foam. acrylic coating system over the spray foam or exceeds california cool roof requirementsDetails
reroofing: repair and re-roof approx. 48,000 sq ft with title 24-compliant spray polyurethane foam. acrylic coating system over the spray foam or exceeds california cool roof requirements | $345,320 |
| Feb 3, 2023 | Completed final sign-off Oct 2024 | 640 Cesar Chavez St | Truebeck Construction | revision to pa# 202207017644 to relocate hydrant due to puc request for utility access.Details
revision to pa# 202207017644 to relocate hydrant due to puc request for utility access. | |
| Aug 25, 2022 | Completed final sign-off Oct 2024 | 640 Cesar Chavez St | Truebeck Construction | pid permit associated with storm water control plan and pa# 202105281321.Details
pid permit associated with storm water control plan and pa# 202105281321. | |
| Aug 10, 2022 | Completed final sign-off Jul 2025 | 640 Cesar Chavez St | Truebeck Construction | revision to pa#202105281321. revised south wall and occupant loading. revised west lot charger location and vehicle lift locations. other misc. details per plans.Details
revision to pa#202105281321. revised south wall and occupant loading. revised west lot charger location and vehicle lift locations. other misc. details per plans. | |
| Jul 1, 2022 | Completed final sign-off Oct 2024 | 640 Cesar Chavez St | H & M Fire Protection, Inc. | revision to add to scope: fire hydrant relocations (3) per previously approved building permit 2021 0528 1321.Details
revision to add to scope: fire hydrant relocations (3) per previously approved building permit 2021 0528 1321. | |
| Jun 6, 2022 | Completed final sign-off Aug 2024 | 630 Cesar Chavez St | Truebeck Construction | site development includes installation of a fence w/gates, paving to support underground electrical conduit & infrastructure for electrical vehicle charging for fleetDetails
site development includes installation of a fence w/gates, paving to support underground electrical conduit & infrastructure for electrical vehicle charging for fleet | $340,000 |
| Jun 3, 2022 | Completed final sign-off May 2023 | 800 Cesar Chavez St | Sabah International Incorporated | fire alarm modification: install 31 led horn/ strobe, 15 led strobe, 4 smoke detectors, 1 duct detector, 3 high power control relay. ref pa# 202105281321.Details
fire alarm modification: install 31 led horn/ strobe, 15 led strobe, 4 smoke detectors, 1 duct detector, 3 high power control relay. ref pa# 202105281321. | $15,000 |
| Jun 3, 2022 | Completed final sign-off Oct 2024 | 800 Cesar Chavez St | H & M Fire Protection, Inc. | install new fire sprinkler system in existing building to accommodate vehicle repair facility. ref pa# 202105281321.Details
install new fire sprinkler system in existing building to accommodate vehicle repair facility. ref pa# 202105281321. | $15,000 |
| Jan 13, 2022 | Expired or cancelled withdrawn Sep 2022 | 640 Cesar Chavez St | Truebeck Construction | revision to pa# 202107285325 to update structural detail.Details
revision to pa# 202107285325 to update structural detail. | |
| Dec 10, 2021 | Completed final sign-off Sep 2023 | 630 Cesar Chavez St | Truebeck Construction | demolition of existing warehouse, including foundationDetails
demolition of existing warehouse, including foundation | $15,000 |
| Nov 10, 2021 | Expired or cancelled withdrawn Jun 2022 | 630 Cesar Chavez St | Truebeck Construction | erect new 1-story bldg, type 1-a, occup. use f-1/s-1, for new maintenance and vehicle charging facility for cruise.Details
erect new 1-story bldg, type 1-a, occup. use f-1/s-1, for new maintenance and vehicle charging facility for cruise. | $750,000 |
| Oct 22, 2021 | Completed final sign-off Nov 2024 | 640 Cesar Chavez St | Truebeck Construction | construction of new eletrical yard including new fence, equipment pads and electrical equipment for (e) warehouse.Details
construction of new eletrical yard including new fence, equipment pads and electrical equipment for (e) warehouse. | $250,000 |
| Jul 28, 2021 | Completed final sign-off Oct 2024 | 640 Cesar Chavez St | Truebeck Construction | improvement of (e) interior structural slab.Details
improvement of (e) interior structural slab. | $575,000 |
| May 28, 2021 | Completed final sign-off Jul 2025 | 800 Cesar Chavez St | Truebeck Construction | demolition of site elements incluce; ramps, fence & gate, paving at 800 lot for underground electrical conduit. renovation of an existing warehouse to support electric vehicle maintenance including ancilary office and amenity spaces; site development includes electric vehicle charging for fleet.Details
demolition of site elements incluce; ramps, fence & gate, paving at 800 lot for underground electrical conduit. renovation of an existing warehouse to support electric vehicle maintenance including ancilary office and amenity spaces; site development includes electric vehicle charging for fleet. | $21,000,000 |
| May 5, 2021 | Completed final sign-off Jun 2023 | 800 Cesar Chavez St | H & M Fire Protection, Inc. | request for sprinkler demolition. permit and fire service turn off by sfwd.Details
request for sprinkler demolition. permit and fire service turn off by sfwd. | $12,000 |
| Apr 21, 2021 | Completed final sign-off Sep 2022 | 640 Cesar Chavez St | Truebeck Construction | demo of non structural elements of building interior only per ab-017Details
demo of non structural elements of building interior only per ab-017 | $5,000 |
| Jun 13, 2017 | Never finaled issued Jun 2017, no final | 630 Cesar Chavez St | Ad Art Inc. | install 2 "penske" single faced electric wall signDetails
install 2 "penske" single faced electric wall sign | $10,000 |
| Mar 13, 2014 | Completed final sign-off Mar 2014 | 640 Cesar Chavez St | to address the nov #200227751 to establish the removal of a structure built without permit within a warehouse space. all work was completed in 2002 by former tenant. for final inspection only.n/a for the maher ordinance #155-13Details
to address the nov #200227751 to establish the removal of a structure built without permit within a warehouse space. all work was completed in 2002 by former tenant. for final inspection only.n/a for the maher ordinance #155-13 | $5,000 | |
| Oct 11, 2005 | Never finaled issued Oct 2005, no final | 500 Cesar Chavez St | house number permit for temporary trailer (for at least 3 years)Details
house number permit for temporary trailer (for at least 3 years) | ||
| Jan 28, 2004 | Never finaled issued Jan 2004, no final | 630 Cesar Chavez St | address assignment | ||
| Nov 3, 2003 | Never finaled issued Nov 2003, no final | 640 Cesar Chavez St | Golden Gate Sign Company Inc. | single-faced electrical wall signDetails
single-faced electrical wall sign |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Truebeck Construction (11), H & M Fire Protection, Inc. (3), Ad Art Inc., Big Joe California North Inc, Central Coating Company, Golden Gate Sign Company Inc., Sabah International Incorporated
- Architects
- Chris Ward (6), Melissa Pesci (2), Rene Bihan, Teresa K Emery
- Engineers
- Daniel Lewin (3), Nikica Favretto (2), Brent Forslin, Jeff Samuel Williams, Kenneth Horns, Lars P. Mortensen, Nikica Favretto, Stephen Shafeer
- Authorized agents
- Brett Miller